HAYS CS (0914-33-087)

Items: 57

County: HAYS
Length: N/A
Highway: CS
District: AUSTIN
Control Number: 0914-33-087
DBE Goal: N/A
Project: STP 2021(834)TAPS
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $732,745.04
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
TOMMY ABREGO
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$732,745.04
$796,568.35
Over/Under Est: 8.71% $63,823.31
$815,574.23
Over/Under Est: 11.3% $82,829.19
Amt Left: 2.39% $19,005.88
Over/Under Est: 24.44% $179,051.29
Amt Left: 14.47% $115,227.98
Delta: -11.80% -$96,222.10

Bid Items & Bid Tabulations

57 Total 0 of 57
HAYS  |  CS  |  AUSTIN  |  0914-33-087  |  06/02/2022  |  $732,745.04  |  STP 2021(834)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
SB CONTRACTORS LLC
LONE STAR SITEWORK, LLC
PREPARING ROW
STA 44.180 $500.000 $1,000.000 $2,500.000 $100.000
REMOVING CONC (CURB)
LF 27.000 $10.000 $20.000 $49.670 $10.000
REMOVING CONC (CURB AND GUTTER)
LF 37.000 $15.000 $20.000 $41.570 $10.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 137.000 $25.000 $20.000 $24.810 $12.700
EXCAVATION (ROADWAY)
CY 458.300 $10.000 $20.000 $63.900 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 38.000 $15.000 $30.000 $79.470 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,780.700 $1.000 $1.000 $2.710 $11.100
BLOCK SODDING
SY 7,780.700 $3.500 $2.000 $7.010 $7.800
VEGETATIVE WATERING
MG 124.500 $20.000 $5.000 $69.000 $80.000
FL BS (CMP IN PLC)(TY A GR 3)(FNAL POS)
CY 67.000 $25.000 $50.000 $138.310 $47.000
CEM STABIL BKFL
CY 25.200 $90.000 $150.000 $149.520 $250.000
DRILL SHAFT (30 IN)
LF 72.000 $300.000 $250.000 $389.640 $725.000
CL C CONC (ABUT)
CY 18.300 $1,100.000 $1,200.000 $1,063.270 $735.000
APPROACH SLAB
CY 5.600 $490.000 $800.000 $1,772.510 $640.000
RIPRAP (CONC)(5 IN)
CY 3.000 $420.000 $500.000 $1,030.220 $525.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 83.300 $150.000 $150.000 $153.700 $230.000
RAIL (HANDRAIL)(TY F)
LF 92.000 $140.000 $300.000 $174.840 $228.000
MOBILIZATION
LS 1.000 $64,816.820 $50,000.000 $80,000.000 $22,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,200.000 $1,000.000 $2,500.000 $950.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 111.000 $40.000 $30.000 $35.220 $39.500
ROCK FILTER DAMS (REMOVE)
LF 111.000 $14.000 $10.000 $6.550 $7.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $25.000 $20.000 $20.840 $23.300
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $10.000 $10.000 $5.950 $6.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,569.000 $4.000 $5.000 $3.600 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,569.000 $1.000 $1.000 $0.490 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 331.000 $8.000 $8.000 $10.330 $11.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 331.000 $1.000 $1.000 $0.990 $1.100
CONC CURB (TY II)
LF 10.000 $25.000 $15.000 $118.050 $45.000
CONC CURB (MOD) (TYPE I)
LF 1,851.000 $15.000 $50.000 $10.640 $13.900
CONC SIDEWALKS (5")
SY 2,072.000 $70.000 $75.000 $55.390 $94.000
CURB RAMPS (TY 1)
EA 3.000 $2,500.000 $1,900.000 $1,381.320 $2,600.000
CURB RAMPS (TY 5)
EA 3.000 $3,000.000 $2,000.000 $1,885.210 $3,800.000
CURB RAMPS (TY 10)
EA 1.000 $2,000.000 $2,000.000 $1,943.800 $2,600.000
CURB RAMPS (TY 2)(MOD)
EA 1.000 $2,500.000 $2,000.000 $2,679.110 $3,800.000
CONDT (PVC) (SCH 80) (2")
LF 140.000 $15.000 $20.000 $55.840 $30.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $500.000 $300.000 $794.690 $300.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 219.000 $2.000 $2.000 $5.320 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,100.000 $8.000 $16.000 $11.010 $12.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 23.000 $110.000 $100.000 $134.230 $360.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 23.000 $150.000 $200.000 $177.200 $600.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 10,503.000 $0.190 $0.250 $0.540 $1.200
PAVEMENT SEALER (SOLID GREEN BLOCK)
SF 144.000 $10.000 $1.000 $1.610 $36.000
PREFAB PAV MRK TY C (GRN)(SLD)(BLOCK)
SF 144.000 $20.000 $20.000 $15.200 $60.000
PAV SURF PREP FOR MRK (SOLID BLOCK)
SF 144.000 $10.000 $1.000 $1.070 $24.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $650.000 $1,000.000 $1,288.700 $990.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 965.000 $1.500 $2.000 $2.750 $3.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 242.000 $3.000 $4.000 $4.090 $3.900
PED POLE ASSEMBLY
EA 2.000 $2,500.000 $2,600.000 $4,832.600 $3,180.000
RELOCATE PED POLE ASSEMBLY
EA 1.000 $2,000.000 $2,400.000 $4,188.270 $2,940.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $1,000.000 $1,100.000 $1,933.040 $1,176.000
LANDSCAPE AMENITY (TY 1)
EA 3.000 $300.000 $1,500.000 $866.980 $2,500.000
LANDSCAPE AMENITY (BENCH)
EA 1.000 $1,000.000 $1,000.000 $2,791.920 $2,000.000
TREE PROTECTION
EA 189.000 $300.000 $500.000 $161.090 $275.000
DECOMPOSED GRANITE
TON 73.000 $550.000 $50.000 $137.800 $150.000
PREFAB PED STL TRUSS BRG SPAN (35 FT)
EA 1.000 $100,000.000 $95,000.000 $77,842.830 $73,450.000
TMA (STATIONARY)
DAY 24.000 $130.000 $150.000 $334.850 $400.000
TMA (MOBILE OPERATION)
DAY 24.000 $250.000 $300.000 $214.780 $2,000.000
Totals: $732,745.040 $796,568.350 $815,574.255 $911,796.330