Show Job Controls
Bid Cobra

HARRISON US0059 (6475-81-001)

Items: 54

County: HARRISON
Length: 0.0100 MILES
Highway: US0059
District: ATLANTA
Control Number: 6475-81-001
DBE Goal: N/A
Project: RMC - A00212636
Guaranty: $17,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $825,242.50
Date: 02/20/2025 (1 year ago)
Contract Number: 2251902
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212636
Project Description: CALLOUT METAL BEAM GUARD FENCE REPAIR (SOUTH)TASK #19I17584
Mail/Deliver Bids To: N/A
JASON DUPREE
CHARLOTTE ASLIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$825,242.50
$730,955.00
Over/Under Est: -11.43% -$94,287.50
$752,220.70
Over/Under Est: -8.85% -$73,021.80
Amt Left: 2.91% $21,265.70
Over/Under Est: -3.67% -$30,262.50
Amt Left: 8.76% $64,025.00
Delta: -5.68% -$42,759.30
$1,117,594.00
Over/Under Est: 35.43% $292,351.50
Amt Left: 52.9% $386,639.00
Delta: -40.58% -$322,614.00
$1,485,400.00
Over/Under Est: 80% $660,157.50
Amt Left: 103.21% $754,445.00
Delta: -32.91% -$367,806.00
Subcontractor Percentage Amount
LDJ ENGINEERING, LLC 100.00% $730,955.00
Total: 100.00% $730,955.00

Bid Items & Bid Tabulations

54 Total 0 of 54
HARRISON  |  US0059  |  ATLANTA  |  6475-81-001  |  02/20/2025  |  $825,242.50  |  RMC - A00212636  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
B & MS CONSTRUCTION, INC.
LAKEY, INC.
JCW CONSTRUCTION, LLC
CATOCON, INC.
ODUM SERVICES, LLC
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 40.000 $100.000 $40.000 $275.000 $50.000 $100.000 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $100.000 $400.000 $789.500 $50.000 $400.000 $1,250.000
MOBILIZATION (CALLOUT)
EA 20.000 $500.000 $500.000 $500.500 $2,500.000 $500.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $334.000 $100.000 $88.000 $1.000 $1.000 $500.000
TMA (STATIONARY)
DAY 100.000 $200.000 $200.000 $250.000 $1.000 $400.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $29.000 $35.000 $29.000 $25.000 $50.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,390.000 $1,300.000 $1,944.000 $1,200.000 $1,200.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.250 $5.000 $3.000 $35.000 $6.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $1,500.000 $366.000 $1,000.000 $1.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $1,500.000 $2,000.000 $3,331.540 $6,500.000 $4,000.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $1,500.000 $300.000 $10.000 $1.000 $350.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 50.000 $30.000 $1.000 $36.430 $10.000 $1.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 50.000 $30.000 $1.000 $24.750 $10.000 $1.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 50.000 $30.000 $10.000 $38.500 $10.000 $1.000 $42.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $30.000 $2.000 $48.480 $10.000 $1.000 $42.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,500.000 $20.000 $25.000 $23.000 $15.000 $40.000 $25.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $40.000 $35.000 $25.000 $150.000 $40.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 15.000 $50.000 $40.000 $20.000 $200.000 $200.000 $560.000
REPLACE TIMBER POST W/O CONC FND
EA 200.000 $40.000 $55.000 $5.500 $250.000 $40.000 $70.000
REPLACE STEEL POST W/O CONC FND
EA 100.000 $50.000 $55.000 $52.500 $50.000 $10.000 $75.000
REPLACE TIMBER POST W/ CONC FND
EA 100.000 $50.000 $42.000 $5.500 $500.000 $40.000 $10.000
REPLACE STEEL POST W/ CONC FND
EA 100.000 $50.000 $70.000 $65.000 $50.000 $70.000 $10.000
REALIGN POSTS
EA 100.000 $7.000 $25.000 $22.500 $100.000 $35.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 50.000 $2,000.000 $4,000.000 $4,200.000 $3,500.000 $5,000.000 $3,150.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $700.000 $900.000 $925.000 $1,000.000 $1,000.000 $1,400.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000 $32.000 $30.000 $27.500 $50.000 $40.000 $48.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $135.000 $125.000 $165.000 $250.000 $100.000 $50.000
REPLACE BLOCKOUT
EA 50.000 $150.000 $30.000 $20.000 $150.000 $200.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $25.000 $200.000 $65.000 $250.000 $100.000 $25.000
REPLACE SGT OBJECT MARKER
EA 10.000 $77.750 $45.000 $1.000 $100.000 $35.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $80.000 $70.000 $1.000 $100.000 $100.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $175.000 $70.000 $1.000 $100.000 $100.000 $50.000
REPLACE SGT STRUT
EA 10.000 $500.000 $65.000 $1.000 $100.000 $100.000 $50.000
RAISE RAIL
LF 1,000.000 $1.000 $8.000 $1.000 $50.000 $3.000 $15.000
REMOVE (NARROW QUAD)
EA 4.000 $1,000.000 $1,500.000 $1,000.000 $50.000 $1.000 $1,250.000
REPLACE (NARROW QUAD)
EA 4.000 $20,000.000 $18,000.000 $25,500.000 $35,000.000 $22,000.000 $25,250.000
REPAIR (NARROW QUAD NOSE)
EA 4.000 $750.000 $350.000 $10,000.000 $1,000.000 $1,500.000 $4,000.000
REPAIR (NARROW QUAD BAY)
EA 4.000 $550.000 $500.000 $1,250.000 $1,500.000 $1,500.000 $3,500.000
REMOVE (WIDE QUAD)
EA 4.000 $1,000.000 $250.000 $1,000.000 $75.000 $1.000 $1,250.000
REPLACE (WIDE QUAD)
EA 4.000 $20,000.000 $2,000.000 $13,750.000 $25.000 $25,000.000 $34,300.000
REPAIR (WIDE QUAD NOSE)
EA 4.000 $750.000 $385.000 $1,000.000 $100.000 $2,000.000 $4,000.000
REPAIR (WIDE QUAD BAY)
EA 4.000 $775.000 $650.000 $1,000.000 $150.000 $1,500.000 $3,500.000
REMOVE (NARROW TRACC)
EA 4.000 $1,000.000 $400.000 $1,000.000 $100.000 $1.000 $1,250.000
REPLACE (NARROW TRACC)
EA 4.000 $20,000.000 $2,500.000 $1,000.000 $175.000 $25,000.000 $30,300.000
REMOVE (WIDE TRACC)
EA 4.000 $500.000 $510.000 $500.000 $55.000 $1.000 $1,250.000
REPLACE (WIDE TRACC)
EA 4.000 $20,000.000 $11,500.000 $300.000 $99.000 $25,000.000 $53,750.000
REPAIR (WIDE TRACC NOSE)
EA 4.000 $500.000 $650.000 $500.000 $2,500.000 $1,500.000 $4,000.000
REPAIR (WIDE TRACC BAY)
EA 4.000 $500.000 $300.000 $50.000 $500.000 $1,000.000 $3,500.000
REMOVE (FASTRACC)
EA 4.000 $1,000.000 $650.000 $1,000.000 $2,500.000 $1.000 $1,250.000
REPLACE (FASTRACC)
EA 4.000 $20,000.000 $25,000.000 $100.000 $1.000 $30,000.000 $38,250.000
REMOVE (MATT)
EA 4.000 $1,000.000 $600.000 $500.000 $1,000.000 $1.000 $1,250.000
REPLACE (MATT)
EA 4.000 $20,000.000 $1,500.000 $4,000.000 $5,000.000 $5,000.000 $17,000.000
REPAIR (T101)
LF 500.000 $46.000 $45.000 $45.000 $50.000 $40.000 $25.000
REPAIR (STEEL POST W/ BASE PLATE)(T101)
EA 20.000 $25.000 $200.000 $110.000 $300.000 $150.000 $20.000
Totals: $825,242.500 $730,955.000 $752,220.700 $794,980.000 $1,117,594.000 $1,485,400.000