HARRISON FM 726 (1895-02-013)

Items: 72

County: HARRISON
Length: N/A
Highway: FM 726
District: ATLANTA
Control Number: 1895-02-013
DBE Goal: N/A
Project: BR 2B23(016)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $2,423,930.65
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,423,930.65
$3,496,300.52
Over/Under Est: 44.24% $1,072,369.87
Over/Under Est: 66.74% $1,617,845.77
Amt Left: 15.6% $545,475.90
Over/Under Est: 74.42% $1,803,952.36
Amt Left: 20.92% $731,582.49
Delta: -4.60% -$186,106.59
Over/Under Est: 82.95% $2,010,664.35
Amt Left: 26.84% $938,294.48
Delta: -4.89% -$206,711.99

Bid Items & Bid Tabulations

72 Total 0 of 72
HARRISON  |  FM 726  |  ATLANTA  |  1895-02-013  |  08/03/2023  |  $2,423,930.65  |  BR 2B23(016)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
TRUE ROADS CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
AC 0.420 $25,000.000 $34,000.000 $200,000.000 $14,000.000 $95,000.000
REMOVING CONC (RIPRAP)
SY 396.000 $40.000 $6.300 $20.000 $21.000 $25.000
REMOVING CONCRETE(MOW STRIP)
LF 602.000 $15.000 $5.000 $10.000 $14.000 $15.000
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 2,262.000 $15.000 $12.280 $11.000 $8.000 $25.000
EXCAVATION (ROADWAY)
CY 1,251.000 $25.000 $12.000 $20.000 $14.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 799.000 $30.000 $12.000 $35.000 $20.000 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,295.000 $4.500 $4.400 $3.500 $5.000 $3.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 7,295.000 $1.000 $1.790 $0.650 $0.660 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 3,648.000 $1.000 $0.010 $0.630 $0.660 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 3,648.000 $1.000 $0.010 $0.610 $0.660 $1.000
VEGETATIVE WATERING
MG 233.000 $130.000 $20.000 $7.000 $40.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 4,736.000 $2.500 $0.840 $1.000 $1.100 $1.000
FL BS (RDWY DEL)(TY D GR 5)(FNAL POS)
CY 707.000 $75.000 $213.500 $135.000 $158.000 $120.000
CEMENT
TON 55.000 $260.000 $250.000 $300.000 $288.000 $300.000
CEMENT TREAT (NEW BASE)(DC)(8")
SY 3,183.000 $4.000 $5.250 $7.000 $8.850 $12.000
PRIME COAT (MC-30)
GAL 796.000 $10.000 $13.650 $7.000 $6.900 $8.000
CEM STABIL BKFL
CY 219.000 $250.000 $261.000 $325.000 $330.000 $275.000
DRILL SHAFT (36 IN)
LF 610.000 $325.000 $199.100 $235.000 $350.000 $210.000
CL C CONC (ABUT)(HPC)
CY 53.000 $1,700.000 $1,100.000 $1,150.000 $1,400.000 $1,400.000
CL C CONC (CAP)(HPC)
CY 20.500 $1,700.000 $1,100.000 $1,250.000 $2,100.000 $1,600.000
CL C CONC (COLUMN)(HPC)
CY 6.300 $1,700.000 $2,500.000 $1,250.000 $2,500.000 $1,900.000
REINF CONC SLAB (HPC)
SF 5,520.000 $28.000 $24.000 $34.000 $31.000 $35.000
APPROACH SLAB (HPC)
CY 105.000 $890.000 $610.000 $755.000 $680.000 $1,000.000
PRESTR CONC GIRDER (TX28)
LF 714.000 $240.000 $226.400 $225.000 $232.000 $290.000
RIPRAP (CONC)(4 IN)
CY 42.000 $900.000 $550.000 $800.000 $655.000 $700.000
RIPRAP (CONC)(CL B)
CY 5.200 $740.000 $865.000 $1,000.000 $980.000 $900.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 975.000 $210.000 $148.500 $200.000 $198.000 $200.000
BEDDING MATERIAL (6 IN)
CY 157.000 $175.000 $148.000 $185.000 $215.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $630.000 $768.000 $675.000 $700.000 $650.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 288.000 $150.000 $165.000 $110.000 $142.000 $160.000
ARMOR JOINT
LF 88.000 $170.000 $200.000 $100.000 $110.000 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 90.000 $240.000 $200.000 $240.000 $260.000 $200.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $70,000.000 $20,000.000 $50,000.000 $52,000.000 $175,000.000
MOBILIZATION
LS 1.000 $190,000.000 $160,000.000 $300,000.000 $195,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,500.000 $1,642.000 $22,000.000 $1,800.000 $16,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 350.000 $40.000 $35.000 $38.000 $40.000 $1.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 20.000 $75.000 $50.000 $55.000 $71.500 $1.000
ROCK FILTER DAMS (REMOVE)
LF 370.000 $20.000 $3.000 $14.000 $13.200 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $35.000 $15.000 $32.000 $38.500 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $12.000 $10.000 $14.000 $11.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,701.000 $4.500 $3.500 $3.350 $3.600 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,701.000 $1.500 $1.000 $0.900 $0.300 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 290.000 $12.000 $10.000 $9.000 $8.800 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 290.000 $3.000 $1.000 $4.250 $3.300 $1.000
DRIVEWAYS (ACP)
SY 227.000 $100.000 $132.200 $90.000 $120.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 537.500 $35.000 $24.940 $26.000 $28.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,653.750 $1,735.000 $2,200.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $4.500 $10.000 $2.200 $3.300 $2.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $1,000.000 $157.500 $165.000 $275.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,350.000 $2,913.750 $3,100.000 $3,520.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $325.000 $210.000 $220.000 $291.500 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $700.000 $1,500.000 $800.000 $790.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $600.000 $1,500.000 $860.000 $855.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 3.000 $160.000 $250.000 $115.000 $112.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $42.000 $50.000 $26.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 19.000 $35.000 $21.000 $30.000 $37.000 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 80.000 $1.000 $5.000 $4.000 $4.400 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 55.000 $1.000 $5.000 $4.000 $4.400 $5.000
PAVEMENT SEALER 6"
LF 587.000 $1.000 $2.100 $2.200 $2.200 $2.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 22.000 $10.000 $26.250 $27.500 $27.500 $30.000
REFL PAV MRKR TY II-A-A
EA 21.000 $8.000 $15.750 $16.500 $16.500 $20.000
PAV SURF PREP FOR MRK (6")
LF 587.000 $0.250 $2.100 $2.200 $2.200 $2.000
PAV SURF PREP FOR MRK (RPM)
EA 4.000 $1.500 $10.500 $11.000 $11.000 $5.000
NO. OF WORKING DAYS
$/D 13,321.000 $25.000 $135.000 $135.000 $160.000 $160.000
SP MIXES SP-C PG76-22
TON 688.000 $160.000 $132.200 $200.000 $255.000 $250.000
TACK COAT
GAL 469.000 $6.000 $5.000 $5.000 $4.400 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $10,000.000 $15,000.000 $19,000.000 $10,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 1,594.000 $1.100 $4.890 $4.400 $4.400 $5.000
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 850.000 $1.100 $4.890 $4.400 $4.400 $5.000
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 220.000 $1.800 $4.890 $4.400 $4.400 $5.000
TMA (STATIONARY)
DAY 5.000 $260.000 $500.000 $400.000 $350.000 $200.000
TMA (MOBILE OPERATION)
HR 60.000 $90.000 $30.000 $25.000 $32.000 $150.000
Totals: $2,423,930.650 $3,496,300.520 $4,041,776.420 $4,227,883.010 $4,434,595.000