Items: 55

County: HARRISON
Length: N/A
Highway: SL 390
District: ATLANTA
Control Number: 1575-05-022
DBE Goal: N/A
Project: STP 2020(538)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $4,700,137.10
Date: 02/06/2020 (6 years ago)
Contract Number: N/A
Type: CEMENT TREAT BASE, ACP AND PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,700,137.10
$5,981,441.56
Over/Under Est: 27.26% $1,281,304.46
Over/Under Est: 30.97% $1,455,790.55
Amt Left: 2.92% $174,486.09
Over/Under Est: 34.36% $1,614,894.17
Amt Left: 5.58% $333,589.71
Delta: -2.58% -$159,103.62

Bid Items & Bid Tabulations

55 Total 0 of 55
HARRISON  |  SL 390  |  ATLANTA  |  1575-05-022  |  02/06/2020  |  $4,700,137.10  |  STP 2020(538)  |  CEMENT TREAT BASE, ACP AND PAV MRKS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 64.130 $2,000.000 $4,200.000 $3,000.000 $4,200.000
REMOVING STAB BASE & ASPH PAV (9")
SY 66,489.000 $6.500 $6.250 $6.500 $7.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 87.000 $25.000 $40.000 $40.000 $40.000
BACKFILL (TY A)
STA 136.600 $300.000 $210.000 $375.000 $210.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 29,070.000 $0.200 $0.120 $0.140 $0.120
BROADCAST SEED (TEMP) (WARM)
SY 14,536.000 $0.200 $0.100 $0.100 $1.100
BROADCAST SEED (TEMP) (COOL)
SY 14,536.000 $0.200 $0.070 $0.100 $0.750
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 14,535.000 $0.650 $0.800 $0.750 $0.900
VEGETATIVE WATERING
MG 930.000 $10.000 $10.000 $8.000 $2.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 400.000 $1.750 $1.620 $1.650 $1.800
CEM TRT(PLNT MX)(CL M)(TY A)(GR1-2)(8")
SY 64,133.000 $15.000 $32.000 $35.000 $32.000
PRIME COAT & BLOTTER (MC-30)
GAL 16,033.000 $5.000 $4.200 $5.000 $4.200
ASPH (TIER II)
GAL 22,447.000 $4.000 $4.100 $4.500 $4.100
AGGR(TY-PB GR-3 SAC-B)
CY 582.000 $110.000 $170.000 $175.000 $170.000
RIPRAP (MOW STRIP)(4 IN)
CY 88.000 $450.000 $510.000 $450.000 $510.000
RC PIPE (CL III)(18 IN)
LF 60.000 $40.000 $60.000 $50.000 $60.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $530.000 $690.000 $700.000 $690.000
MOBILIZATION
LS 1.000 $415,000.000 $481,000.000 $400,000.000 $580,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,000.000 $5,000.000 $15,000.000 $16,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 130.000 $45.000 $55.000 $50.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 130.000 $10.000 $11.000 $11.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,360.000 $2.750 $2.350 $2.750 $2.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,360.000 $1.000 $0.900 $0.750 $1.000
DRIVEWAYS (CONC)
SY 56.000 $100.000 $120.000 $140.000 $120.000
DRIVEWAYS (ACP)
SY 1,168.000 $50.000 $43.000 $40.000 $48.000
RUMBLE STRIPS (SHOULDER)
LF 26,516.000 $0.200 $0.290 $0.250 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $22.000 $21.000 $23.000 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 525.000 $4.500 $2.000 $2.200 $4.400
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $200.000 $220.000 $440.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,500.000 $2,750.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $200.000 $220.000 $330.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $300.000 $350.000 $385.000 $380.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $610.000 $710.000 $780.000 $775.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $700.000 $835.000 $925.000 $975.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $550.000 $425.000 $475.000 $465.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $430.000 $505.000 $565.000 $555.000
REMOVE SM RD SN SUP&AM
EA 14.000 $100.000 $140.000 $100.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $40.000 $35.000 $40.000 $38.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 4.000 $30.000 $35.000 $40.000 $42.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 802.000 $3.000 $1.150 $1.100 $1.100
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 64.000 $15.000 $15.000 $16.500 $16.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $210.000 $220.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $325.000 $320.000 $330.000 $330.000
REFL PAV MRKR TY I-C
EA 80.000 $3.500 $3.000 $4.400 $4.400
REFL PAV MRKR TY II-A-A
EA 729.000 $3.500 $3.000 $3.850 $3.850
NO. OF WORKING DAYS
$/D 8,000.000 $55.000 $55.000 $55.000 $55.000
SP MIXES SP-C SAC-A PG76-22
TON 14,864.000 $110.000 $114.850 $114.000 $107.880
TACK COAT
GAL 13,381.000 $3.000 $1.000 $0.250 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $8,000.000 $4,000.000 $10,000.000 $30,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 2,473.000 $3.250 $5.350 $5.500 $5.500
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 26,966.000 $0.500 $0.450 $0.550 $0.550
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 17,264.000 $0.500 $0.450 $0.600 $0.600
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 3,102.000 $0.500 $0.550 $0.550 $0.550
TMA (STATIONARY)
DAY 65.000 $225.000 $150.000 $300.000 $125.000
TMA (MOBILE OPERATION)
DAY 6.000 $250.000 $1.000 $300.000 $275.000
Totals: $4,700,137.100 $5,981,441.560 $6,155,927.650 $6,315,031.270