Show Job Controls
Bid Cobra

HARRISON CR (0919-03-059)

Items: 43

County: HARRISON
Length: N/A
Highway: CR
District: ATLANTA
Control Number: 0919-03-059
DBE Goal: N/A
Project: BR 2019(351)
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $369,827.50
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$369,827.50
$398,056.85
Over/Under Est: 7.63% $28,229.35
Over/Under Est: 11.71% $43,296.05
Amt Left: 3.79% $15,066.70
Over/Under Est: 16.53% $61,137.75
Amt Left: 8.27% $32,908.40
Delta: -4.32% -$17,841.70
Over/Under Est: 18.25% $67,508.10
Amt Left: 9.87% $39,278.75
Delta: -1.48% -$6,370.35
$497,979.70
Over/Under Est: 34.65% $128,152.20
Amt Left: 25.1% $99,922.85
Delta: -13.87% -$60,644.10
Over/Under Est: 104.47% $386,358.00
Amt Left: 89.97% $358,128.65
Delta: -51.85% -$258,205.80

Bid Items & Bid Tabulations

43 Total 0 of 43
HARRISON  |  CR  |  ATLANTA  |  0919-03-059  |  08/06/2019  |  $369,827.50  |  BR 2019(351)  |  BRIDGE REPL  |  80 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
STATELINE CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 6.000 $2,000.000 $2,400.000 $2,000.000 $1,000.000 $2,500.000 $2,000.000 $10,000.000
EXCAVATION (ROADWAY)
CY 490.000 $8.000 $10.000 $12.000 $25.000 $20.000 $21.000 $20.000
EXCAVATION (CHANNEL)
CY 377.000 $31.000 $17.500 $12.000 $18.000 $20.000 $25.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 97.000 $28.000 $17.000 $20.000 $25.000 $20.000 $60.000 $50.000
BLADING
STA 6.000 $211.000 $215.000 $250.000 $200.000 $250.000 $300.000 $450.000
SPEC EXCAV WORK (ORIGINAL)
CY 56.000 $10.000 $22.000 $20.000 $14.000 $40.000 $60.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,955.000 $1.000 $3.000 $2.000 $6.000 $4.000 $3.000 $6.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 1,955.000 $1.000 $1.650 $1.500 $1.500 $2.000 $1.400 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 978.000 $1.000 $1.250 $1.300 $1.500 $2.000 $1.450 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 978.000 $1.000 $1.250 $1.300 $1.500 $2.000 $1.450 $1.000
VEGETATIVE WATERING
MG 62.600 $13.000 $1.000 $20.000 $10.000 $1.000 $20.000 $50.000
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 1,955.000 $2.000 $2.000 $1.650 $2.000 $4.000 $1.670 $6.500
CEMENT
TON 21.000 $154.000 $200.000 $200.000 $350.000 $200.000 $300.000 $185.000
CEMENT TREAT (SUBGRADE)(6")
SY 1,341.000 $9.000 $3.500 $4.000 $14.000 $6.000 $7.650 $10.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 94.000 $4.000 $6.750 $15.000 $50.000 $10.000 $28.000 $8.000
CEM STABIL BKFL
CY 90.000 $300.000 $210.000 $200.000 $200.000 $220.000 $200.000 $350.000
PRESTR CONC PIL (18 IN SQ)
LF 208.000 $121.150 $165.000 $0.000 $0.000 $0.000 $0.000 $0.000
CL C CONC (ABUT)
CY 18.400 $824.000 $1,000.000 $950.000 $1,100.000 $1,000.000 $1,350.000 $1,250.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $16.000 $16.000 $17.500 $15.000 $22.000 $21.000 $20.000
APPROACH SLAB
CY 48.200 $449.000 $500.000 $525.000 $650.000 $500.000 $565.000 $1,250.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $175.000 $225.000 $225.000 $202.500 $230.000 $250.000 $250.000
RIPRAP (CONC)(5 IN)
CY 1.600 $518.000 $2,200.000 $1,500.000 $500.000 $800.000 $2,100.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 152.000 $109.000 $165.000 $140.000 $135.000 $120.000 $165.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 3.000 $481.000 $900.000 $600.000 $500.000 $600.000 $1,200.000 $500.000
RAIL (TY T223)
LF 124.000 $98.000 $100.000 $110.000 $95.000 $120.000 $150.000 $185.000
ARMOR JOINT
LF 48.000 $250.000 $45.000 $75.000 $100.000 $100.000 $90.000 $150.000
ARMOR JOINT (SEALED)
LF 44.000 $130.000 $75.000 $100.000 $100.000 $100.000 $90.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $19,025.000 $5,000.000 $10,000.000 $12,000.000 $12,000.000 $8,500.000 $50,000.000
MOBILIZATION
LS 1.000 $27,000.000 $30,000.000 $35,000.000 $40,000.000 $35,000.000 $49,600.000 $70,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $1,000.000 $1,100.000 $2,000.000 $1,200.000 $2,500.000 $2,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 70.000 $33.000 $44.000 $45.000 $50.000 $5.000 $44.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 70.000 $12.000 $10.000 $11.000 $15.000 $1.000 $11.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 225.000 $3.000 $4.600 $4.000 $5.000 $2.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 225.000 $2.000 $1.100 $1.000 $2.000 $1.000 $1.400 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $22.000 $22.000 $18.000 $18.000 $25.000 $17.600 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,817.000 $1,550.000 $1,500.000 $1,600.000 $1,800.000 $1,500.000 $1,850.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 4.000 $3,025.000 $2,800.000 $2,750.000 $2,750.000 $2,700.000 $2,700.000 $2,850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $434.000 $740.000 $1,000.000 $300.000 $800.000 $300.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 3.000 $90.000 $110.000 $100.000 $200.000 $100.000 $100.000 $650.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $30.000 $22.000 $30.000 $35.000 $50.000 $29.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $44.000 $40.000 $35.000 $60.000 $30.000 $100.000
ASPHALT-STABILIZED FLEXIBLE BASE
TON 465.000 $60.000 $110.000 $105.000 $70.000 $120.000 $110.000 $200.000
1
DRILL SHAFT (24 IN)
LF 180.000 $140.000 $0.000 $230.000 $250.000 $140.000 $300.000 $250.000
Totals: $395,026.700 $398,056.850 $413,123.550 $430,965.250 $437,335.600 $497,979.700 $756,185.500