Show Job Controls
Bid Cobra

HARRISON CR (0919-03-057)

Items: 41

County: HARRISON
Length: N/A
Highway: CR
District: ATLANTA
Control Number: 0919-03-057
DBE Goal: N/A
Project: BR 2017(296)
Guaranty: N/A
Time: 55 WORKING DAYS
Engineer's Estimate: $461,935.50
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$461,935.50
$444,410.70
Over/Under Est: -3.79% -$17,524.80
Over/Under Est: -1.94% -$8,978.40
Amt Left: 1.92% $8,546.40
$474,474.00
Over/Under Est: 2.71% $12,538.50
Amt Left: 6.76% $30,063.30
Delta: -4.75% -$21,516.90
Over/Under Est: 2.81% $12,964.75
Amt Left: 6.86% $30,489.55
Delta: -0.09% -$426.25
$477,734.80
Over/Under Est: 3.42% $15,799.30
Amt Left: 7.5% $33,324.10
Delta: -0.60% -$2,834.55
Over/Under Est: 20.93% $96,686.50
Amt Left: 25.7% $114,211.30
Delta: -16.93% -$80,887.20
Over/Under Est: 90.96% $420,156.50
Amt Left: 98.49% $437,681.30
Delta: -57.90% -$323,470.00

Bid Items & Bid Tabulations

41 Total 0 of 41
HARRISON  |  CR  |  ATLANTA  |  0919-03-057  |  07/12/2017  |  $461,935.50  |  BR 2017(296)  |  REPLACE BRIDGE AND APPROACHES  |  55 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
PIERCE R & B LLC
LONGVIEW BRIDGE AND ROAD, LTD.
CDM HOLDINGS, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 9.000 $3,750.000 $1,900.000 $1,500.000 $1,500.000 $1,800.000 $295.000 $3,000.000 $5,000.000
EXCAVATION (ROADWAY)
CY 469.000 $17.500 $19.000 $10.000 $18.000 $18.000 $6.000 $20.000 $15.000
EXCAVATION (CHANNEL)
CY 190.000 $20.000 $22.000 $30.000 $18.000 $40.000 $16.500 $20.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 510.000 $17.500 $21.000 $20.000 $22.000 $18.000 $20.500 $24.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,930.000 $5.000 $2.500 $4.000 $3.000 $4.000 $3.500 $6.000 $3.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 2,930.000 $0.900 $1.880 $0.670 $1.850 $0.750 $0.700 $1.000 $2.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 730.000 $1.000 $0.010 $1.650 $1.000 $1.850 $0.010 $2.000 $2.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 730.000 $1.000 $2.000 $1.650 $1.000 $1.850 $1.700 $2.000 $2.000
VEGETATIVE WATERING
MG 70.000 $15.000 $50.000 $10.000 $20.000 $15.000 $10.000 $1.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 100.000 $2.250 $4.000 $4.000 $3.850 $4.400 $4.000 $4.000 $5.000
CEMENT
TON 33.000 $175.000 $160.000 $160.000 $210.000 $215.000 $190.000 $220.000 $300.000
CEMENT TREAT (SUBGRADE)(6")
SY 2,186.000 $2.500 $5.750 $4.000 $4.250 $3.500 $3.000 $8.000 $10.000
CEM STABIL BKFL
CY 34.000 $225.000 $225.000 $180.000 $240.000 $350.000 $230.000 $250.000 $300.000
DRILL SHAFT (30 IN)
LF 168.000 $185.000 $130.000 $130.000 $245.000 $275.000 $210.000 $180.000 $400.000
CL C CONC (ABUT)
CY 25.200 $1,000.000 $1,025.000 $850.000 $950.000 $925.000 $820.000 $1,200.000 $1,500.000
REINF CONC SLAB (BOX BEAM)
SF 1,439.000 $20.000 $20.000 $15.000 $21.000 $18.250 $21.000 $26.000 $25.000
APPROACH SLAB
CY 50.600 $500.000 $575.000 $500.000 $500.000 $480.000 $570.000 $800.000 $500.000
SHEAR KEY
CY 7.300 $600.000 $375.000 $350.000 $475.000 $540.000 $583.000 $800.000 $500.000
PRESTR CONC BOX BEAM (4B20)
LF 218.000 $185.000 $170.000 $217.000 $196.000 $240.000 $228.000 $200.000 $400.000
PRESTR CONC BOX BEAM (5B20)
LF 109.000 $190.000 $185.000 $217.000 $169.000 $240.000 $228.000 $220.000 $400.000
RIPRAP (CONC)(5 IN)
CY 2.000 $650.000 $500.000 $700.000 $750.000 $1,500.000 $1,000.000 $1,000.000 $1,500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 232.000 $140.000 $120.000 $180.000 $160.000 $145.000 $190.000 $140.000 $200.000
RAIL (TY T223)
LF 142.000 $125.000 $115.000 $100.000 $110.000 $110.000 $126.000 $130.000 $150.000
ARMOR JOINT
LF 24.000 $60.000 $70.000 $100.000 $90.000 $58.000 $75.000 $120.000 $50.000
ARMOR JOINT (SEALED)
LF 44.000 $110.000 $85.000 $65.000 $90.000 $70.000 $75.000 $120.000 $100.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $2,500.000 $6,500.000 $10,000.000 $5,000.000 $6,500.000 $3,500.000 $10,000.000 $20,000.000
MOBILIZATION
LS 1.000 $40,000.000 $40,000.000 $30,000.000 $47,000.000 $25,000.000 $32,500.000 $40,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $2,000.000 $1,000.000 $2,000.000 $1,350.000 $1,000.000 $2,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 38.000 $27.000 $25.000 $25.000 $24.000 $24.000 $21.500 $40.000 $35.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 88.000 $35.000 $28.000 $45.000 $25.500 $26.000 $23.500 $40.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 126.000 $10.000 $9.500 $10.000 $9.250 $9.000 $8.500 $20.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 570.000 $3.000 $3.000 $3.000 $3.200 $3.150 $3.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 570.000 $1.000 $1.500 $1.000 $1.500 $1.450 $1.500 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $20.000 $20.000 $18.000 $19.500 $20.000 $18.500 $24.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,750.000 $1,600.000 $1,450.000 $1,590.000 $1,600.000 $1,990.000 $1,600.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $1,150.000 $1,025.000 $1,132.500 $1,125.000 $1,050.000 $1,200.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $650.000 $650.000 $525.000 $590.000 $580.000 $535.500 $600.000 $600.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $2,250.000 $2,550.000 $2,275.000 $2,450.000 $2,500.000 $2,320.500 $2,400.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $20.000 $26.000 $24.000 $30.000 $26.000 $24.500 $40.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $32.000 $29.000 $30.000 $32.000 $29.600 $40.000 $40.000
ASPHALT-STABILIZED FLEXIBLE BASE
TON 651.000 $75.000 $92.000 $130.000 $95.000 $100.000 $145.000 $130.000 $200.000
Totals: $461,935.500 $444,410.700 $452,957.100 $474,474.000 $474,900.250 $477,734.800 $558,622.000 $882,092.000