Show Job Controls
Bid Cobra

HARRISON FM 451 (0632-04-032)

Items: 75

County: HARRISON
Length: N/A
Highway: FM 451
District: ATLANTA
Control Number: 0632-04-032
DBE Goal: N/A
Project: SSW 632-4-32
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $5,357,556.55
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: GR, BS, STRS, SURF & PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,357,556.55
$4,798,326.75
Over/Under Est: -10.44% -$559,229.80
Over/Under Est: -8.24% -$441,485.23
Amt Left: 2.45% $117,744.57
Over/Under Est: -5.05% -$270,695.54
Amt Left: 6.01% $288,534.26
Delta: -3.47% -$170,789.69
Over/Under Est: -4.69% -$251,143.25
Amt Left: 6.42% $308,086.55
Delta: -0.38% -$19,552.29
$6,143,150.10
Over/Under Est: 14.66% $785,593.55
Amt Left: 28.03% $1,344,823.35
Delta: -20.30% -$1,036,736.80

Bid Items & Bid Tabulations

75 Total 0 of 75
HARRISON  |  FM 451  |  ATLANTA  |  0632-04-032  |  03/05/2019  |  $5,357,556.55  |  SSW 632-4-32  |  GR, BS, STRS, SURF & PAV MRKS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. V. CAVER, INC.
FOUTSCO PAVING COMPANY, LLC
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 82.150 $500.000 $1,600.000 $450.000 $1,200.000 $1,750.000 $4,500.000
REMOVING CONC (RIPRAP)
SY 5.000 $30.000 $25.000 $30.000 $100.000 $25.000 $50.000
REMOVING CONC (DRIVEWAYS)
SY 221.000 $20.000 $20.000 $30.000 $20.000 $20.000 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 212.000 $200.000 $210.000 $165.000 $175.000 $300.000 $225.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,054.000 $20.000 $23.000 $25.000 $18.000 $15.000 $19.000
BACKFILL (TY C)
STA 248.000 $225.000 $300.000 $250.000 $245.000 $300.000 $200.000
BLADING
STA 55.000 $170.000 $90.000 $100.000 $240.000 $200.000 $140.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 130,926.000 $0.200 $0.110 $0.110 $0.140 $0.100 $0.100
BROADCAST SEED (TEMP) (WARM)
SY 29,138.000 $0.200 $0.110 $0.100 $0.140 $0.100 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 29,138.000 $0.200 $0.090 $0.050 $0.140 $0.100 $0.100
VEGETATIVE WATERING
MG 1,306.000 $10.000 $5.000 $2.000 $1.000 $8.000 $20.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,200.000 $2.000 $1.420 $2.500 $1.400 $2.450 $2.500
FL BS(CMP IN PLC)(TY D GR 4)(9")
SY 9,411.000 $22.000 $21.610 $20.000 $21.500 $24.750 $26.000
CEMENT
TON 1,266.000 $170.000 $148.000 $170.000 $190.000 $160.000 $175.000
CEMENT TREAT (EXIST MATL) (DC) (9")
SY 70,509.000 $3.500 $2.750 $1.750 $2.000 $2.750 $4.000
PRIME COAT & BLOTTER (MC-30)
GAL 18,337.000 $5.000 $4.250 $7.000 $4.400 $5.000 $4.500
ASPH (TIER I)
GAL 29,339.000 $3.000 $3.810 $3.900 $4.100 $3.500 $4.000
AGGR(TY-PB GR-3 SAC-B)
CY 524.000 $140.000 $132.110 $170.000 $180.000 $175.000 $240.000
SUPERPAVE MIXTURES SP-C PG76-22
TON 20,097.000 $120.000 $100.000 $112.000 $104.460 $112.000 $118.000
PLANE ASPH CONC PAV (0" TO 5")
SY 981.000 $2.000 $7.500 $11.000 $5.000 $10.000 $9.000
TEMPORARY SPL SHORING
SF 1,800.000 $1.000 $55.000 $30.000 $32.000 $35.000 $42.000
CL A CONC (SEAL)
CY 10.000 $300.000 $450.000 $400.000 $600.000 $400.000 $370.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 116.000 $200.000 $275.000 $115.000 $195.000 $150.000 $110.000
BEDDING MATERIAL (6 IN)
CY 58.000 $125.000 $175.000 $95.000 $195.000 $150.000 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 130.000 $450.000 $400.000 $485.000 $465.000 $415.000 $550.000
CONC BOX CULV (5 FT X 5 FT)
LF 112.000 $300.000 $500.000 $400.000 $340.000 $375.000 $775.000
CONC BOX CULV (6 FT X 6 FT)
LF 130.000 $400.000 $600.000 $480.000 $440.000 $465.000 $900.000
RC PIPE (CL III)(18 IN)
LF 1,690.000 $50.000 $41.330 $40.000 $38.000 $40.000 $48.000
RC PIPE (CL III)(24 IN)
LF 48.000 $60.000 $50.580 $54.000 $74.000 $56.000 $117.000
RC PIPE (CL III)(30 IN)
LF 16.000 $120.000 $73.310 $76.000 $110.000 $76.000 $140.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $18,000.000 $15,500.000 $17,000.000 $12,000.000 $12,000.000 $16,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $20,000.000 $17,500.000 $20,000.000 $16,000.000 $16,000.000 $22,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 159.000 $550.000 $585.000 $600.000 $600.000 $600.000 $750.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $1,000.000 $700.000 $700.000 $750.000 $625.000 $850.000
SET (TY II) (30 IN) (RCP) (3: 1) (P)
EA 2.000 $3,000.000 $975.000 $1,000.000 $1,100.000 $1,000.000 $2,200.000
REMOV STR (SET)
EA 10.000 $675.000 $280.000 $100.000 $250.000 $200.000 $480.000
REMOV STR (PIPE)
LF 1,180.000 $20.000 $15.000 $10.000 $13.000 $10.000 $26.000
MOBILIZATION
LS 1.000 $495,000.000 $243,335.000 $344,000.000 $465,000.000 $240,000.000 $570,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,500.000 $3,000.000 $3,000.000 $3,000.000 $5,000.000 $9,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 300.000 $40.000 $41.000 $75.000 $47.000 $52.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 300.000 $15.000 $10.000 $12.000 $11.000 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.000 $2.500 $4.000 $3.150 $3.250 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $0.950 $1.000 $1.100 $1.000 $1.000
DRIVEWAYS (CONC)
SY 221.000 $100.000 $95.000 $110.000 $80.000 $90.000 $120.000
DRIVEWAYS (ACP)
SY 2,789.000 $50.000 $41.370 $40.000 $44.000 $42.000 $56.000
TURNOUTS (ACP)
SY 2,015.000 $50.000 $42.790 $40.000 $43.000 $40.000 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $20.000 $18.250 $20.000 $24.000 $24.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $75.000 $80.000 $65.000 $94.000 $92.000 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.500 $6.250 $2.000 $5.500 $5.500 $7.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $550.000 $200.000 $130.000 $130.000 $550.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,300.000 $2,600.000 $2,525.000 $2,775.000 $2,750.000 $2,700.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 23.000 $300.000 $264.650 $250.000 $275.000 $270.000 $270.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 8.000 $325.000 $605.000 $555.000 $610.000 $600.000 $600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 8.000 $700.000 $411.370 $465.000 $510.000 $500.000 $500.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 5.000 $400.000 $299.850 $325.000 $360.000 $350.000 $350.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 12.000 $30.000 $61.500 $125.000 $255.000 $250.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $30.000 $26.000 $50.000 $50.000 $50.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 49,436.000 $0.200 $0.200 $0.200 $0.220 $0.220 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 49,436.000 $0.200 $0.200 $0.200 $0.220 $0.220 $0.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,472.000 $1.250 $1.500 $1.000 $1.450 $1.250 $0.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 49,436.000 $1.250 $1.500 $0.200 $1.400 $1.250 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,237.000 $1.250 $0.950 $0.750 $1.250 $2.000 $0.800
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 280.000 $12.000 $15.000 $15.000 $16.500 $16.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 18.000 $200.000 $180.000 $180.000 $200.000 $200.000 $195.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $35.000 $55.000 $55.000 $60.000 $60.000 $60.000
REFL PAV MRKR TY II-A-A
EA 1,610.000 $3.500 $3.400 $3.400 $3.750 $3.700 $3.500
NO. OF WORKING DAYS
$/D 1,035.000 $105.000 $95.000 $105.000 $105.000 $105.000 $105.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,500.000 $10,000.000 $18,000.000 $11,000.000 $6,500.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 49,756.000 $3.000 $3.350 $3.300 $3.600 $3.570 $3.500
PREFORMED CENTERLINE RUMBLE STRIP
LF 4,286.000 $3.000 $3.300 $3.300 $3.600 $3.570 $3.500
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 50,586.000 $0.500 $0.440 $0.440 $0.480 $0.480 $0.450
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 30,698.000 $0.500 $0.440 $0.440 $0.480 $0.480 $0.450
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 5,370.000 $0.500 $0.650 $0.650 $0.700 $0.700 $0.700
TMA (STATIONARY)
EA 2.000 $10,000.000 $9,500.000 $8,000.000 $18,000.000 $15,000.000 $15,000.000
TMA (MOBILE OPERATION)
HR 16.000 $20.000 $50.000 $400.000 $55.000 $60.000 $200.000
Totals: $5,357,556.550 $4,798,326.750 $4,916,071.320 $5,086,861.010 $5,106,413.300 $6,143,150.100