Show Job Controls
Bid Cobra

HARRISON IH 20 (0495-08-130)

Items: 30

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-130
DBE Goal: N/A
Project: F 2021(584)
Guaranty: N/A
Time: 95 WORKING DAYS
Engineer's Estimate: $1,924,393.40
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: IMPROVE GUARDRAILS TO SAFETY STANDARDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$1,924,393.40
$2,346,996.00
Over/Under Est: 21.96% $422,602.60
$2,557,784.64
Over/Under Est: 32.91% $633,391.24
Amt Left: 8.98% $210,788.64
$2,583,635.85
Over/Under Est: 34.26% $659,242.45
Amt Left: 10.08% $236,639.85
Delta: -1.01% -$25,851.21
Over/Under Est: 40.13% $772,345.35
Amt Left: 14.9% $349,742.75
Delta: -4.38% -$113,102.90
$2,890,639.63
Over/Under Est: 50.21% $966,246.23
Amt Left: 23.16% $543,643.63
Delta: -7.19% -$193,900.88
Subcontractor Percentage Amount
GARRET SHIELDS INFRASTRUCTURE 44.55% $1,045,586.72
TALBRAN ENTERPRISES LLC 19.09% $448,041.54
ROACH WELDING & FABRICATION LLC 0.85% $19,949.47
Total: 64.49% $1,513,577.73

Bid Items & Bid Tabulations

30 Total 0 of 30
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-130  |  06/03/2021  |  $1,924,393.40  |  F 2021(584)  |  IMPROVE GUARDRAILS TO SAFETY STANDAR...  |  95 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DBI SERVICES, LLC
ODUM SERVICES, LLC
3LW CIVIL LLC
EAST TEXAS BRIDGE, INC.
ALTUS CONSTRUCTION LLC
REMOVING CONC (RIPRAP)
SY 624.000 $8.000 $30.000 $30.000 $12.000 $22.000 $15.740
REMOVING CONC (CURB)
LF 1,200.000 $4.000 $5.000 $10.000 $10.000 $10.000 $12.070
REMOVING CONCRETE(MOW STRIP)
LF 11,312.500 $8.000 $4.000 $3.000 $5.000 $8.000 $16.590
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 243.000 $20.000 $30.000 $28.000 $25.000 $30.000 $65.930
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 24,597.000 $0.600 $1.000 $0.700 $0.300 $0.700 $0.830
VEGETATIVE WATERING
MG 393.300 $4.000 $80.000 $10.000 $15.000 $12.000 $39.560
FLOWABLE BACKFILL
CY 26.000 $250.000 $250.000 $125.000 $270.000 $400.000 $292.470
RIPRAP (CONC)(4 IN)
CY 100.000 $450.000 $400.000 $550.000 $450.000 $475.000 $434.900
RIPRAP (MOW STRIP)(4 IN)
CY 705.000 $325.000 $400.000 $400.000 $400.000 $475.000 $434.900
RETROFIT RAIL (TY T131RC)
LF 5,416.000 $135.000 $190.000 $230.000 $155.000 $192.000 $182.010
MOBILIZATION
LS 1.000 $175,000.000 $200,000.000 $100,000.000 $200,000.000 $220,000.000 $283,478.200
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $5,000.000 $3,000.000 $70,131.000 $11,000.000 $19,777.550
MTL W-BEAM GD FEN (TIM POST)
LF 8,512.500 $15.000 $20.000 $22.750 $19.000 $22.500 $25.510
MTL W-BEAM GD FEN (STEEL POST)
LF 462.500 $25.000 $20.000 $85.000 $30.000 $85.000 $34.610
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 60.000 $1,300.000 $1,000.000 $1,800.000 $1,400.000 $1,600.000 $2,408.370
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $1,000.000 $1,350.000 $1,000.000 $1,300.000 $1,674.510
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,000.000 $500.000 $850.000 $970.000 $750.000 $1,384.130
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,000.000 $800.000 $1,050.000 $977.000 $1,200.000 $1,667.910
REMOVE METAL BEAM GUARD FENCE
LF 9,187.500 $2.000 $2.000 $1.250 $1.500 $2.200 $2.510
REMOVE TERMINAL ANCHOR SECTION
EA 48.000 $200.000 $500.000 $125.000 $150.000 $220.000 $237.330
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $200.000 $200.000 $200.000 $150.000 $165.000 $310.730
RM MTL BM GD FEN TRANS (T101)
EA 44.000 $150.000 $200.000 $125.000 $150.000 $165.000 $342.510
GUARDRAIL END TREATMENT (INSTALL)
EA 94.000 $2,000.000 $2,000.000 $2,500.000 $2,300.000 $2,800.000 $2,571.920
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $225.000 $300.000 $200.000 $250.000 $220.000 $295.640
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $850.000 $2,000.000 $850.000 $1,145.000 $900.000 $880.650
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $21,000.000 $22,000.000 $24,100.000 $19,000.000 $24,500.000 $30,615.650
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 21.000 $20.000 $20.000 $26.000 $28.000 $20.000 $35.330
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 216.000 $30.000 $15.000 $40.000 $30.000 $30.000 $30.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $1,000.000 $10,500.000 $2,500.000 $18,000.000 $6,592.520
TMA (STATIONARY)
DAY 95.000 $100.000 $200.000 $100.000 $75.000 $300.000 $171.410
Totals: $1,924,393.400 $2,346,996.000 $2,557,784.650 $2,583,635.850 $2,696,738.750 $2,890,639.658