HARRISON IH 20 (0495-08-100)

Items: 62

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-100
DBE Goal: N/A
Project: NH 2017(236)
Guaranty: N/A
Time: 250 WORKING DAYS
Engineer's Estimate: $18,560,135.28
Date: 11/04/2016 (9 years ago)
Contract Number: N/A
Type: PLANE,CONC PVMT REP,ACP SF,PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$18,560,135.28
$13,599,302.66
Over/Under Est: -26.73% -$4,960,832.62
Over/Under Est: -12.59% -$2,337,473.93
Amt Left: 19.29% $2,623,358.69
$18,062,321.35
Over/Under Est: -2.68% -$497,813.93
Amt Left: 32.82% $4,463,018.69
Delta: -11.34% -$1,839,660.00

Bid Items & Bid Tabulations

62 Total 0 of 62
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-100  |  11/04/2016  |  $18,560,135.28  |  NH 2017(236)  |  PLANE,CONC PVMT REP,ACP SF,PAV MRK  |  250 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
AUSTIN BRIDGE & ROAD SERVICES, LP
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 125.000 $50.000 $50.000 $14.970 $30.000
REMOVING CONC (MEDIANS)
SY 778.000 $30.000 $20.000 $13.640 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,553.000 $20.000 $10.000 $6.560 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 4,061.000 $10.000 $6.000 $11.690 $20.000
BACKFILL (TY A)
STA 1,647.100 $325.000 $325.000 $117.900 $450.000
BACKFILL (TY B)
STA 47.300 $325.000 $150.000 $128.580 $500.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 369,854.000 $1.000 $0.900 $0.860 $0.900
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 92,464.000 $1.050 $0.010 $0.630 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 92,464.000 $1.050 $0.010 $0.630 $0.750
VEGETATIVE WATERING
MG 8,877.000 $10.000 $10.000 $20.490 $12.000
D-GR HMA(SQ) TY-D PG76-22
TON 415.000 $150.000 $200.000 $141.170 $140.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 41,793.000 $131.500 $91.250 $115.250 $115.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 37,822.000 $150.000 $114.500 $128.500 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 11,205.000 $60.000 $32.750 $47.930 $55.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,004.000 $85.000 $98.000 $116.940 $70.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 713.000 $125.000 $115.000 $123.700 $90.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 1,072.000 $50.000 $361.000 $56.540 $40.000
PLANE ASPH CONC PAV(0" TO 2")
SY 26,663.000 $7.000 $2.500 $2.270 $4.000
PLANE ASPH CONC PAV (2")
SY 11,461.000 $5.000 $2.500 $2.270 $4.000
ASPH BINDER(PG 64-22)
GAL 346.000 $7.500 $1.750 $12.830 $1.000
FABRIC
SY 1,734.000 $5.000 $6.250 $2.030 $10.000
PAV JT UNDERSEAL (36")
LF 3,116.000 $20.000 $8.750 $18.470 $20.000
FULL - DEPTH REPAIR CRCP (8")
SY 567.000 $450.000 $449.500 $321.140 $500.000
CL A CONC (MISC)
CY 10.840 $4,007.000 $3,850.000 $4,027.360 $4,000.000
RIPRAP (CONC)(4 IN)
CY 62.800 $1,300.000 $1,050.000 $1,213.310 $2,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 183.000 $600.000 $560.000 $454.230 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,400.000 $35.000 $28.000 $29.270 $35.000
CLEANING AND SEALING JOINTS
LF 2,620.000 $35.000 $14.000 $15.140 $35.000
MOBILIZATION
LS 1.000 $1,670,000.000 $655,000.000 $1,546,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $6,000.000 $3,750.000 $31,667.250 $15,000.000
RUMBLE STRIPS (SHOULDER)
LF 321,793.000 $0.250 $0.130 $0.110 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 2,950.000 $21.000 $21.000 $16.910 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $70.000 $80.000 $25.230 $60.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,350.000 $1,475.000 $1,488.850 $2,200.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $6.250 $13.000 $8.080 $15.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,250.000 $1,250.000 $857.980 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 2,625.000 $3.000 $4.000 $2.020 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $140.000 $300.000 $126.170 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $250.000 $300.000 $126.170 $200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $250.000 $300.000 $126.170 $250.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 20.000 $2,250.000 $2,475.000 $1,993.540 $2,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 32.000 $750.000 $650.000 $630.870 $800.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 13.000 $500.000 $450.000 $403.760 $500.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 15.000 $950.000 $500.000 $757.040 $1,000.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 13.000 $200.000 $225.000 $201.880 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $39.000 $39.000 $25.240 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 16.000 $39.000 $39.000 $25.240 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 97.000 $45.000 $75.000 $40.380 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 34.000 $38.000 $47.000 $40.380 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 15.000 $38.000 $47.000 $40.380 $30.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 61,523.000 $0.250 $0.500 $0.400 $0.450
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 18,829.000 $1.500 $1.000 $1.010 $2.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 7,562.000 $3.400 $3.150 $3.030 $3.500
PREFAB PAV MRK TY C (W) (NUMBER)
EA 18.000 $200.000 $70.500 $70.660 $80.000
REFL PAV MRKR TY II-C-R
EA 2,509.000 $3.700 $3.650 $3.430 $4.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 3,156.000 $2.500 $4.500 $5.550 $3.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 60,151.000 $7.500 $4.000 $3.520 $4.000
PERMEABLE CONCRETE EDGE DRAIN
LF 36,851.000 $26.000 $23.700 $25.390 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $20,000.000 $16,500.000 $14,833.690 $25,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 168,108.000 $0.600 $0.460 $0.440 $0.500
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 42,280.000 $0.600 $0.500 $0.440 $0.500
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 169,671.000 $0.600 $0.460 $0.440 $0.500
Totals: $18,560,135.280 $13,599,302.660 $16,222,661.364 $18,062,321.350