HARRISON US 59 (0062-07-103)

Items: 32

County: HARRISON
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0062-07-103
DBE Goal: 0.0%
Project: STP 2B24(045)VRU
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $1,345,548.70
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: INSTALL ILLUMINATION
Mail/Deliver Bids To: N/A
CHRISTINA TROWLER
KENNETH BURNS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,345,548.70
$1,254,209.20
Over/Under Est: -6.79% -$91,339.50
$1,472,897.60
Over/Under Est: 9.46% $127,348.90
Amt Left: 17.44% $218,688.40
Over/Under Est: 10.65% $143,279.30
Amt Left: 18.71% $234,618.80
Delta: -1.08% -$15,930.40
Subcontractor Percentage Amount
SAFETEX,INC. 3.69% $46,280.32
Total: 3.69% $46,280.32

Bid Items & Bid Tabulations

32 Total 0 of 32
HARRISON  |  US 59  |  ATLANTA  |  0062-07-103  |  04/04/2024  |  $1,345,548.70  |  STP 2B24(045)VRU  |  INSTL ILLUM  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
YUNEX LLC
STRIPING TECHNOLOGY, L.P.
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 50.000 $950.000 $650.000 $865.500 $1,400.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 480.000 $240.000 $250.000 $275.600 $225.000
RIPRAP (CONC)(CL B)
CY 31.000 $750.000 $700.000 $1,268.500 $1,200.000
MOBILIZATION
LS 1.000 $135,000.000 $110,000.000 $169,812.800 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,200.000 $3,500.000 $4,725.200 $6,500.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 3.000 $4,800.000 $5,000.000 $4,735.900 $6,700.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 45.000 $5,200.000 $5,200.000 $5,121.700 $6,800.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 2.000 $65,000.000 $70,000.000 $51,462.800 $74,000.000
CONDT (PVC) (SCH 40) (2")
LF 6,576.000 $10.500 $10.000 $17.200 $10.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 4,082.000 $25.000 $12.000 $27.200 $30.000
ELEC CONDR (NO.6) BARE
LF 11,111.000 $1.900 $2.000 $2.000 $2.000
ELEC CONDR (NO.6) INSULATED
LF 22,694.000 $2.200 $2.300 $2.700 $3.000
GROUND BOX TY A (122311)
EA 2.000 $950.000 $1,000.000 $1,485.600 $700.000
GROUND BOX TY A (122311)W/APRON
EA 48.000 $1,200.000 $1,200.000 $1,657.400 $850.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,400.000 $1,200.000 $1,773.700 $1,050.000
ELC SRV TY A 120/240 060(NS)AL(E)PS(U)
EA 1.000 $6,500.000 $5,000.000 $7,613.100 $6,900.000
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
EA 8.000 $6,300.000 $7,500.000 $8,873.700 $7,200.000
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
EA 2.000 $7,100.000 $6,500.000 $8,899.200 $8,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 12.000 $965.000 $1,200.000 $1,452.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,100.000 $1,200.000 $2,864.200 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 1.000 $1,000.000 $1,800.000 $1,720.500 $1,700.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 21.000 $620.000 $750.000 $878.000 $700.000
REMOVE SM RD SN SUP&AM
EA 25.000 $250.000 $300.000 $232.500 $250.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 306.000 $18.000 $12.000 $33.400 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $370.000 $300.000 $288.900 $220.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 1.000 $600.000 $425.000 $500.000 $270.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $500.000 $425.000 $333.400 $290.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $400.000 $425.000 $416.700 $260.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 7.000 $50.000 $425.000 $472.300 $100.000
REMOVING TRAFFIC SIGNALS
EA 7.000 $4,000.000 $5,000.000 $2,092.500 $6,500.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 2.000 $40,000.000 $50,000.000 $46,604.800 $62,500.000
TMA (STATIONARY)
DAY 155.000 $375.000 $150.000 $150.600 $300.000
Totals: $1,345,548.700 $1,254,209.200 $1,472,897.600 $1,488,828.000