Bid Cobra

HARRISON US 59 (0062-07-088)

Items: 71

County: HARRISON
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0062-07-088
DBE Goal: N/A
Project: NH 2020(066)
Guaranty: N/A
Time: 156 WORKING DAYS
Engineer's Estimate: $14,389,894.90
Date: 10/02/2019 (6 years ago)
Contract Number: N/A
Type: PLANE ACP, CEMENT TREATMENT, ACP SURF, & PAV MARK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$14,389,894.90
$13,662,269.83
Over/Under Est: -5.06% -$727,625.07
$13,720,538.56
Over/Under Est: -4.65% -$669,356.34
Amt Left: 0.43% $58,268.73

Bid Items & Bid Tabulations

71 Total 0 of 71
HARRISON  |  US 59  |  ATLANTA  |  0062-07-088  |  10/02/2019  |  $14,389,894.90  |  NH 2020(066)  |  PLANE ACP, CEMENT TREATMENT, ACP SUR...  |  156 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 580.000 $10.000 $10.000 $15.000
REMOVING UNTREATED BASE (4")
SY 33,998.300 $5.000 $2.640 $1.000
EXCAVATION (ROADWAY)
CY 1,194.000 $6.500 $10.500 $8.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 2,499.000 $30.000 $8.500 $12.000
BACKFILL (TY B)
STA 285.400 $175.000 $275.000 $200.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 96,125.000 $0.700 $0.640 $0.700
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 48,064.000 $0.700 $0.500 $0.550
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 48,064.000 $0.700 $0.500 $0.550
VEGETATIVE WATERING
MG 1,537.000 $10.000 $9.000 $7.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 2,800.000 $2.600 $1.190 $1.500
REWORK BS MTL (TY B) (4") (ORD COMP)
SY 17,198.000 $5.000 $1.650 $3.500
CEMENT
TON 2,257.100 $150.000 $155.000 $160.000
CEMENT TREAT (EXIST MATL) (10")
SY 110,108.000 $2.500 $2.500 $2.000
PRIME COAT (MC-30)
GAL 30,457.000 $4.000 $5.250 $3.500
SUPERPAVE MIXTURES SP-C PG76-22
TON 72,873.000 $105.000 $108.000 $106.000
TACK COAT
GAL 44,166.000 $4.000 $2.000 $0.010
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 14,537.000 $130.000 $135.000 $140.000
TACK COAT
GAL 15,494.000 $4.000 $3.000 $0.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,000.000 $61.000 $60.000 $50.000
PLANE ASPH CONC PAV(0" TO 2")
SY 844.400 $2.200 $3.110 $4.000
PLANE ASPH CONC PAV (7")
SY 33,998.300 $3.500 $4.620 $4.000
PLANE ASPH CONC PAV(4.5")
SY 3,926.600 $3.000 $2.970 $4.000
PLANE ASPH CONC PAV (11")
SY 106,186.600 $3.700 $7.250 $6.350
PLANE ASPH CONC PAV (2" TO 4 1/2")
SY 950.000 $3.000 $2.150 $4.000
RIPRAP (MOW STRIP)(4 IN)
CY 90.000 $520.000 $530.000 $450.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,862.000 $30.000 $32.000 $30.000
CLEANING AND SEALING JOINTS
LF 1,862.000 $25.000 $12.000 $18.000
MOBILIZATION
LS 1.000 $1,277,000.000 $219,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,500.000 $14,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $30.000 $37.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 300.000 $45.000 $48.000 $52.000
ROCK FILTER DAMS (REMOVE)
LF 500.000 $10.000 $9.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.000 $1.000 $1.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 34,204.000 $0.250 $0.700 $0.300
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 34,204.000 $0.250 $0.200 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 3,050.000 $21.000 $20.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 18.000 $1,800.000 $1,400.000 $1,800.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,800.000 $16.000 $10.000 $11.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 168.750 $23.000 $30.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,230.000 $1,125.000 $1,300.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 12.000 $300.000 $300.000 $350.000
REMOVE METAL BEAM GUARD FENCE
LF 3,000.000 $5.000 $2.500 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $200.000 $200.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 18.000 $290.000 $150.000 $170.000
GUARDRAIL END TREATMENT (INSTALL)
EA 27.000 $2,500.000 $2,470.000 $2,600.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 7.000 $1,350.000 $1,000.000 $1,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $300.000 $200.000 $220.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 36.000 $25.000 $20.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 56.000 $39.000 $35.000 $45.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 51,306.000 $0.300 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 68,408.000 $0.300 $0.150 $0.160
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 28,331.000 $3.000 $0.580 $0.620
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 48,630.000 $3.000 $0.580 $0.620
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 4,275.000 $2.500 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 500.000 $2.500 $1.000 $1.100
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 250.000 $25.000 $15.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $290.000 $225.000 $250.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 250.000 $15.000 $15.000 $16.000
REFL PAV MRKR TY II-A-A
EA 594.600 $3.000 $3.500 $4.000
REFL PAV MRKR TY II-C-R
EA 1,522.000 $3.000 $3.500 $4.000
ELIM EXT PAV MRK & MRKS (6")
LF 80,078.000 $0.700 $0.440 $0.480
SP-C BALANCED MIX DESIGN
TON 2,503.000 $130.000 $150.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 35.000 $120.000 $90.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $17,000.000 $8,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 60,868.000 $0.500 $0.550 $0.600
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 15,220.000 $0.550 $0.550 $0.600
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 60,868.000 $0.500 $0.550 $0.600
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 6,100.000 $0.550 $0.550 $0.600
TMA (STATIONARY)
EA 1.000 $12,000.000 $7,500.000 $40,000.000
TMA (MOBILE OPERATION)
HR 201.000 $40.000 $20.000 $30.000
Totals: $14,389,894.900 $13,662,269.844 $13,720,538.560