Bid Cobra

HARRIS SH0249 (6498-52-001)

Items: 62

County: HARRIS
Length: 0.0100 MILES
Highway: SH0249
District: HOUSTON
Control Number: 6498-52-001
DBE Goal: 0.0%
Project: RMC - A00220019
Guaranty: $15,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $742,281.11
Date: 06/09/2026 (yesterday)
Contract Number: 6261201
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00220019
Project Description: REPAIR AND REPLACEMENT OF GUARDRAIL IN THE NORTH HARRIS MAINTENANCE OFFICE AREA OF RESPONSIBILITY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7600 WASHINGTON AVE, HOUSTON, TX 77007
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$742,281.11
Over/Under Est: -19.26% -$142,981.11
$631,682.00
Over/Under Est: -14.9% -$110,599.11
Amt Left: 5.4% $32,382.00
Over/Under Est: -9.95% -$73,891.11
Amt Left: 11.53% $69,090.00
Delta: -5.81% -$36,708.00

Bid Items & Bid Tabulations

62 Total 0 of 62
HARRIS  |  SH0249  |  HOUSTON  |  6498-52-001  |  06/09/2026  |  $742,281.11  |  RMC - A00220019  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
RHINO EQUITY, LLC
AUSTIN BARRICADE COMPANY, L.L.C.
REMOV CONC (MOWSTRIP)
SY 25.000 $17.360 $150.000 $2.000 $40.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $350.000 $750.000 $200.000 $100.000
MOBILIZATION (CALLOUT)
EA 30.000 $100.000 $100.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 12.000 $750.000 $750.000 $1,500.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $120.000 $250.000 $75.000 $100.000
TMA (STATIONARY)
DAY 80.000 $350.000 $100.000 $1.000 $2,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $33.000 $40.000 $10.000 $38.000
PORT CTB (ALIGNING)
LF 8,000.000 $5.000 $2.000 $1.000 $1.000
CONC CURB (TY II)
LF 20.000 $30.000 $150.000 $10.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,400.000 $1,750.000 $1,200.000 $1,250.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,512.030 $1,250.000 $1,000.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $4.470 $50.000 $0.500 $25.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $100.000 $100.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $1,200.000 $1,000.000 $500.000 $1,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $200.000 $3,000.000 $500.000 $500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 300.000 $30.000 $10.000 $10.000 $18.000
CHAIN LINK FENCE (REPAIR) (6')
LF 150.000 $8.000 $15.000 $18.000 $18.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $2.000 $20.000 $2.000 $10.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $1,000.000 $1,500.000 $500.000 $150.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 1.000 $500.000 $1,500.000 $500.000 $350.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 2,000.000 $7.500 $8.000 $1.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 2,000.000 $7.250 $7.000 $1.000 $1.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 300.000 $27.000 $20.000 $25.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 150.000 $28.000 $20.000 $25.000 $10.000
CLEANING / SWEEPING (HANDWORK)
SY 5,000.000 $1.000 $0.500 $0.500 $0.500
GRAFFITI REMOVAL (WATER BLAST CLEAN)
SF 500.000 $5.590 $4.000 $1.000 $10.000
GRAFFITI REMOVAL (ABRASIVE CLEAN)
SF 3,000.000 $0.100 $2.000 $1.000 $5.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,000.000 $16.000 $20.000 $35.000 $22.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 100.000 $75.000 $15.000 $20.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 75.000 $330.000 $50.000 $175.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 250.000 $100.000 $25.000 $150.000 $198.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $40.000 $30.000 $1.000 $55.000
REPLACE TIMBER POST W/ CONC FND
EA 125.000 $225.000 $90.000 $150.000 $156.000
REPLACE STEEL POST W/ CONC FND
EA 80.000 $75.000 $60.000 $1.000 $60.000
REALIGN POSTS
EA 100.000 $25.000 $40.000 $5.000 $90.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $7.000 $100.000 $1.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 25.000 $4,500.000 $3,500.000 $3,500.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 45.000 $386.000 $700.000 $1,200.000 $500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $39.630 $24.000 $30.000 $1.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 80.000 $40.000 $225.000 $100.000 $700.000
REPLACE BLOCKOUT
EA 200.000 $103.000 $40.000 $70.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $137.500 $150.000 $1.000 $100.000
RESET SGT IMPACT HEAD
EA 20.000 $300.000 $100.000 $100.000 $1.000
REPLACE SGT OBJECT MARKER
EA 35.000 $25.000 $100.000 $30.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 45.000 $40.000 $100.000 $85.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 45.000 $50.750 $110.000 $85.000 $1.000
REPLACE SGT STRUT
EA 20.000 $41.400 $80.000 $1.000 $1.000
RAISE RAIL
LF 200.000 $4.750 $35.000 $2.000 $5.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $35.000 $50.000 $35.000 $38.000
REALIGN EXISTING RAIL
LF 100.000 $2.750 $25.000 $50.000 $5.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 4.000 $20.000 $200.000 $1.000 $280.000
REPLACE POSTS (TL-4)(TRINITY)
EA 100.000 $180.000 $150.000 $300.000 $50.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 4.000 $200.000 $500.000 $1.000 $50.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 4.000 $225.000 $500.000 $1.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $2,500.000 $2,000.000 $2,000.000 $2,500.000
REPLACE CABLE (TL-4)
LF 1,000.000 $4.000 $0.250 $1.000 $1.000
CHECK / RE-TENSION CABLE (TL-4)
EA 5.000 $80.000 $750.000 $1.000 $100.000
REPLACE POST HARDWARE (TL-4)
EA 10.000 $80.000 $100.000 $40.000 $350.000
REPAIR (STEEL PED. RAIL)
LF 100.000 $127.500 $170.000 $50.000 $100.000
CONCRETE RAIL REPAIR (MISC)
LF 100.000 $350.000 $115.000 $250.000 $100.000
PEDESTRIAN BARRIER (FURN & INSTALL)
LF 1,000.000 $60.000 $40.000 $30.000 $10.000
PEDESTRIAN BARRIER (REMOVE & REINSTALL)
LF 300.000 $30.000 $20.000 $5.000 $10.000
Totals: $742,281.110 $599,300.000 $631,682.000 $668,390.000