HARRIS IH0045 (6482-72-001)

Items: 98

County: HARRIS
Length: 0.0100 MILES
Highway: IH0045
District: HOUSTON
Control Number: 6482-72-001
DBE Goal: N/A
Project: RMC - A00214842
Guaranty: $100,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $5,551,811.02
Date: 07/01/2025 (11 months ago)
Contract Number: 7254002
Type: TOTAL MAINTENANCE
Project ID: A00214842
Project Description: GENERAL MAINTENANCE ON IH 45 IN SOUTHEAST HARRIS COUNTY.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMAL ELAHI
VANESSA BOSQUES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,551,811.02
$4,988,410.00
Over/Under Est: -10.15% -$563,401.02
$5,262,302.54
Over/Under Est: -5.21% -$289,508.48
Amt Left: 5.49% $273,892.54
Over/Under Est: 0.97% $53,727.98
Amt Left: 12.37% $617,129.00
Delta: -6.52% -$343,236.46
Subcontractor Percentage Amount
THE STREET CLEANER LLC 17.54% $874,967.11
LIEUTENANT ENTERPRISES INC 10.62% $529,769.14
XTREME PRO CLEANING LLC 10.02% $499,838.68
Total: 38.18% $1,904,574.93

Bid Items & Bid Tabulations

98 Total 0 of 98
HARRIS  |  IH0045  |  HOUSTON  |  6482-72-001  |  07/01/2025  |  $5,551,811.02  |  RMC - A00214842  |  TOTAL MAINT  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
HAZMAT INTERNATIONAL, INC.
REMOV CONC (MOWSTRIP)
LF 600.000 $20.160 $15.000 $25.000 $10.440
REMOV CONC (RIPRAP)
CY 20.000 $19.000 $50.000 $25.000 $50.000
REMOV CONC (TRAFFIC BARRIER)
LF 30.000 $5.000 $10.000 $150.000 $75.000
BLADING
LF 500.000 $1.610 $10.000 $25.000 $15.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 300.000 $71.610 $200.000 $85.000 $250.000
RIPRAP (CONC)(5 IN)
CY 20.000 $573.310 $425.000 $455.000 $650.000
RIPRAP (MOW STRIP)(5 IN)
CY 20.000 $250.000 $450.000 $450.000 $650.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 400.000 $54.000 $48.000 $16.370 $100.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 400.000 $59.000 $45.000 $32.000 $100.000
CLEANING & SEALING EXISTING JOINT (SEJ)
LF 200.000 $96.000 $85.000 $98.690 $100.000
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $500.000 $1,500.000 $250.000
MOBILIZATION (EMERGENCY)
EA 40.000 $2,000.000 $1,000.000 $2,500.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $150.000 $150.000 $208.780 $150.000
TMA (STATIONARY)
DAY 250.000 $400.000 $100.000 $500.000 $400.000
TMA (MOBILE OPERATION)
HR 3,000.000 $68.000 $75.000 $81.520 $80.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 30.000 $8.680 $50.000 $5.320 $50.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 120.000 $2.140 $50.000 $1.290 $50.000
PORT CTB (REMOVE)(SAFETY SH)(TY 2)
LF 30.000 $1.030 $50.000 $5.320 $50.000
PORT CTB (PINNING)
EA 40.000 $75.000 $500.000 $110.650 $50.000
PORT CTB (ALIGNING)
LF 1,300.000 $20.880 $6.000 $2.200 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,100.000 $1,900.000 $1,623.300 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,500.000 $1,200.000 $1,930.260 $1,800.000
MTL W-BEAM GD FEN (SPECIAL)
LF 25.000 $31.500 $60.000 $38.000 $300.000
CONNECTOR PLATE FOR THRIE BEAM
EA 5.000 $500.000 $450.000 $458.300 $250.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $5.880 $10.000 $9.610 $1.000
ALUMINUM SIGNS (TY A)
SF 1,000.000 $41.000 $35.000 $23.190 $35.000
ALUMINUM SIGNS (TY G)
SF 500.000 $56.550 $50.000 $34.890 $50.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 300.000 $35.000 $40.000 $23.190 $50.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 5.000 $2,341.000 $1,500.000 $2,405.490 $3,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 5.000 $2,659.330 $1,500.000 $2,405.490 $3,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 100.000 $645.020 $500.000 $398.100 $650.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 3,000.000 $17.000 $8.000 $8.820 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 300.000 $32.000 $30.000 $13.350 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 2,000.000 $15.000 $8.000 $8.820 $10.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 500.000 $9.200 $6.000 $10.000 $300.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 75.000 $100.000 $700.000 $250.000 $650.000
LITTER REMOVAL (SPOT)
AC 4.000 $100.000 $1,500.000 $117.500 $1,500.000
LITTER REMOVAL - TRACT (1)
CYC 96.000 $5,600.000 $5,850.000 $9,000.000 $5,500.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 96.000 $3,500.000 $3,550.000 $922.000 $3,600.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 96.000 $3,500.000 $3,550.000 $1,845.000 $3,600.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 48.000 $4,750.000 $2,500.000 $984.000 $4,900.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 48.000 $2,650.000 $1,500.000 $984.000 $2,900.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 48.000 $1,350.000 $675.000 $984.000 $1,400.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 48.000 $1,650.000 $850.000 $246.000 $1,400.000
CLEANING / SWEEPING (HANDWORK)
SY 5,000.000 $0.970 $1.000 $1.000 $1.000
DRAIN INLET CLEANING
EA 300.000 $87.500 $100.000 $53.670 $65.000
DOWNSPOUT CLEANING
EA 75.000 $80.000 $100.000 $80.510 $75.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 3,000.000 $3.100 $3.500 $2.950 $4.500
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 5,000.000 $7.000 $5.500 $3.220 $4.500
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 10,000.000 $8.000 $5.500 $4.030 $5.250
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 10,000.000 $8.060 $7.000 $4.290 $6.250
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 5,000.000 $9.850 $8.000 $5.100 $7.500
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 850.000 $12.000 $10.500 $6.440 $12.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 4,000.000 $9.050 $14.000 $7.510 $13.500
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 2,000.000 $13.000 $16.000 $8.590 $16.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 2,000.000 $21.000 $20.000 $30.810 $14.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $34.000 $50.000 $36.720 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $417.270 $175.000 $931.800 $300.000
REPLACE TIMBER POST W/O CONC FND
EA 80.000 $94.240 $65.000 $105.590 $65.000
REPLACE TIMBER POST W/ CONC FND
EA 150.000 $211.640 $100.000 $142.180 $100.000
REPLACE STEEL POST W/ CONC FND
EA 100.000 $294.030 $75.000 $189.770 $75.000
REALIGN POSTS
EA 100.000 $15.000 $50.000 $17.170 $75.000
REM OBSOLETE GET & REPL W/ SGT
EA 10.000 $3,072.570 $3,250.000 $2,873.730 $2,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,362.150 $1,250.000 $1,553.770 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,500.000 $35.000 $30.000 $48.910 $34.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 300.000 $62.160 $100.000 $59.030 $60.000
REPLACE BLOCKOUT
EA 150.000 $100.000 $100.000 $41.250 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 3.000 $101.040 $450.000 $508.280 $750.000
RESET SGT IMPACT HEAD
EA 25.000 $293.480 $300.000 $349.080 $300.000
REPLACE SGT OBJECT MARKER
EA 60.000 $33.250 $50.000 $38.590 $100.000
REPLACE SGT CABLE ANCHOR
EA 55.000 $112.240 $100.000 $137.260 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 55.000 $133.910 $100.000 $193.760 $100.000
REPLACE SGT STRUT
EA 25.000 $120.000 $100.000 $127.990 $100.000
RAISE RAIL
LF 500.000 $15.710 $12.000 $15.260 $15.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $1,018.750 $1,000.000 $1,340.540 $1,200.000
REPLACE HINGED TOP SGT POST (STEEL)
EA 20.000 $400.000 $300.000 $522.380 $100.000
REALIGN HINGED TOP SGT POST ((STEEL)
EA 20.000 $400.000 $150.000 $48.020 $100.000
REPLACE (SMTC) NARROW
EA 20.000 $23,000.000 $28,000.000 $27,000.000 $25,000.000
REPAIR (SMTC) NARROW
LF 440.000 $374.390 $250.000 $150.000 $200.000
REPLACE (SMTC) WIDE
EA 20.000 $20,000.000 $36,000.000 $42,250.000 $35,000.000
REPAIR (SMTC) WIDE
LF 240.000 $399.390 $300.000 $150.000 $200.000
REPAIR (STEEL RAIL)
LF 50.000 $46.630 $1.000 $177.000 $300.000
REPAIR (STEEL PED. RAIL)
LF 30.000 $210.500 $1.000 $177.000 $300.000
REPAIR (STL PIPE PED RAIL)(PR1)
LF 50.000 $330.310 $300.000 $177.000 $300.000
REPAIR(STL PIPE PED RAILW/PARAPET)(PR2)
LF 30.000 $250.000 $1.000 $117.000 $300.000
PERM CONC TRF BARRIER REPAIR (F SHAPE)
LF 150.000 $362.500 $10.000 $117.000 $50.000
PERM CONC TRF BARR REPAIR(SINGLE SLOPE)
LF 150.000 $1,032.670 $10.000 $117.000 $50.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 500.000 $400.000 $100.000 $117.000 $50.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 200.000 $938.500 $650.000 $585.000 $350.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 50.000 $1,512.000 $750.000 $645.000 $700.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 250.000 $80.000 $10.000 $240.000 $100.000
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $110.000 $110.000 $75.000 $200.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 400.000 $100.000 $100.000 $10.000 $80.000
SNOW AND ICE CONTROL (LOADER)
HR 48.000 $150.000 $150.000 $50.000 $150.000
SNOW AND ICE CONTROL (SEASON)
MO 6.000 $25,000.000 $20,000.000 $75,000.000 $50,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $162.500 $100.000 $175.000 $50.000
REPAIR LARGE RDSD SIGN SUPT & ASSEM
EA 35.000 $1,500.000 $1,500.000 $2,100.000 $1,250.000
STORM SEWER (TELEVISION INSPECTION)
LF 300.000 $3.140 $6.500 $3.250 $30.000
Totals: $5,551,811.020 $4,988,410.000 $5,262,302.540 $5,605,539.000