Show Job Controls
Bid Cobra

HARRIS IH0610 (6476-73-001)

Items: 49

County: HARRIS
Length: 0.0100 MILES
Highway: IH0610
District: HOUSTON
Control Number: 6476-73-001
DBE Goal: N/A
Project: RMC - A00212867
Guaranty: $50,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,036,526.70
Date: 07/02/2025 (11 months ago) Changed
Contract Number: 7254203
Type: COMMUNICATION CABLE
Project ID: A00212867
Project Description: CONNECTED VEHICLE & COMMUNICATION CABLE MAINTENANCE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,036,526.70
$1,957,558.77
Over/Under Est: -3.88% -$78,967.93
Over/Under Est: 60.96% $1,241,503.09
Amt Left: 67.45% $1,320,471.02
$3,306,492.18
Over/Under Est: 62.36% $1,269,965.48
Amt Left: 68.91% $1,348,933.41
Delta: -0.87% -$28,462.39
Over/Under Est: 116.1% $2,364,323.30
Amt Left: 124.81% $2,443,291.23
Delta: -33.10% -$1,094,357.82

Bid Items & Bid Tabulations

49 Total 0 of 49
HARRIS  |  IH0610  |  HOUSTON  |  6476-73-001  |  07/02/2025  |  $2,036,526.70  |  RMC - A00212867  |  COMMUNICATION CABLE  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRAF-TEX, INC.
THIRD COAST SERVICES LLC
SICE, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
MOBILIZATION (CALLOUT)
EA 48.000 $533.520 $327.300 $270.520 $1,027.212 $2,100.000
MOBILIZATION (EMERGENCY)
EA 75.000 $937.340 $612.360 $541.040 $1,793.225 $3,000.000
TMA (STATIONARY)
DAY 550.000 $201.860 $167.710 $253.000 $315.116 $240.000
CONDT (PVC) (SCH 80) (2")
LF 5,000.000 $14.490 $12.300 $12.660 $22.947 $14.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 7,139.000 $18.430 $20.450 $15.760 $29.076 $31.500
CONDT (PVC) (SCH 80) (3")
LF 8,610.000 $20.230 $18.600 $16.010 $24.637 $16.500
CONDT (PVC) (SCH 80) (3") (BORE)(ROCK)
LF 4,675.000 $22.610 $39.900 $24.540 $30.948 $37.250
CONDT (PVC) (SCH 80) (4")
LF 200.000 $25.650 $23.410 $25.430 $26.981 $19.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 200.000 $32.540 $36.360 $38.230 $36.211 $42.750
CONDT (RM) (1 1/2") (BORE)
LF 400.000 $22.840 $21.500 $30.900 $31.487 $42.000
CONDT (RM) (2")
LF 200.000 $30.200 $27.830 $46.230 $37.690 $28.500
CONDT (RM) (2") (BORE)
LF 1,500.000 $27.560 $32.830 $34.370 $43.022 $44.000
CONDT (RM) (3")
LF 150.000 $50.860 $49.400 $83.140 $120.390 $51.750
CONDT (RM) (3") (BORE)
LF 150.000 $53.150 $51.500 $61.120 $76.356 $59.500
ELEC CONDR (NO.6) BARE
LF 22,800.000 $1.760 $1.780 $1.700 $1.502 $2.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 15.000 $3,996.330 $4,461.420 $4,266.230 $5,326.773 $4,865.000
ITS GND BOX TY 1 (122422)W/APRON
EA 2.000 $3,996.330 $3,163.840 $4,266.230 $5,231.793 $2,857.000
ITS GND BOX TY 2 (243636)W/APRON
EA 2.000 $3,996.330 $4,490.050 $5,193.910 $5,546.522 $4,032.000
ITS GND BOX TY 3 (081208)W/APRON
EA 2.000 $3,996.330 $1,019.000 $0.970 $5,875.564 $2,380.000
GROUND BOX TY D (162922)W/APRON
EA 20.000 $1,270.250 $1,293.000 $1,051.590 $1,984.600 $1,450.000
INSTALL OF CONDUIT BY TRENCHING
LF 5,800.000 $6.690 $10.920 $6.840 $26.779 $10.000
INSTALL OF CONDUIT BY BORING
LF 2,500.000 $10.020 $15.900 $7.700 $40.168 $33.250
INSTL VID IMAGE VEH DET SYS (VIVDS)
EA 75.000 $74.000 $2,360.000 $21,648.020 $12,682.426 $23,030.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 20.000 $194.330 $1,400.000 $135.260 $328.526 $690.000
OVERHEAD CABLE PLACEMENT
LF 3,000.000 $2.070 $3.300 $6.570 $2.629 $2.250
REMOVE EXISTING CABLE (COMMUNICATION)
LF 5,000.000 $1.200 $1.150 $0.540 $1.102 $1.100
ITS COM CBL (ETHERNET)
LF 35,000.000 $2.300 $2.710 $2.130 $1.522 $1.600
COMM CABLE (AERIAL)(22 AWG)(6 PAIR)
LF 2,500.000 $1.020 $2.910 $1.910 $3.753 $3.900
COMM CABLE (UNDRGRND)(19 AWG)(6 PAIR)
LF 2,500.000 $0.830 $1.410 $3.440 $4.055 $3.000
ITS COM CBL CONNECTOR
EA 500.000 $57.890 $32.150 $19.970 $8.288 $27.250
VIVDS MULTI CON COM CAX CBL(3COND16AWG)
LF 2,500.000 $1.270 $4.410 $2.780 $3.055 $3.000
RVDS (PRESENCE DET)(INSTALL ONLY)
EA 10.000 $508.580 $1,080.000 $225.430 $518.667 $980.000
REMOVE RVDS
EA 10.000 $149.740 $204.000 $135.260 $657.051 $395.000
REMOVE ITS RADIO
EA 35.000 $635.230 $147.400 $270.520 $517.377 $615.000
INSTALL ITS RADIO
EA 50.000 $939.930 $1,029.000 $541.040 $689.836 $4,075.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 200.000 $1,137.590 $884.000 $740.720 $657.051 $790.000
RELOCATE CCTV FIELD EQUIPMENT
EA 1.000 $2,476.080 $884.000 $1,481.470 $1,314.102 $1,825.250
REMOVE CCTV FIELD EQUIPMENT
EA 20.000 $486.990 $493.000 $338.150 $796.426 $615.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 28,800.000 $3.610 $1.660 $2.340 $3.371 $4.600
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 1,920.000 $2.080 $1.450 $3.030 $3.499 $5.750
FIBER OPTIC FUSION SPLICE
EA 192.000 $86.120 $47.320 $76.430 $64.741 $70.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 50.000 $3,679.390 $436.000 $1,359.170 $1,526.147 $1,950.000
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 3,300.000 $4.730 $3.650 $5.360 $4.691 $6.300
FO SPLICE ENCLOSURE (TYPE 1)
EA 40.000 $2,122.600 $1,198.300 $1,436.480 $1,046.992 $1,935.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 1,500.000 $3.470 $1.610 $3.090 $3.088 $5.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 57.000 $1,182.060 $346.500 $940.470 $1,379.135 $900.000
FIBER OPTIC CBL (SING-MODE)(24 FIBER)
LF 10,000.000 $2.440 $1.580 $3.040 $3.420 $5.000
FO CBL (12 SMF)(PIGTAIL)
LF 280.000 $9.740 $71.160 $3.400 $48.548 $85.000
TEMPORARY EMERGENCY GENERATOR
EA 57.000 $1,500.000 $1,675.000 $1,352.600 $892.920 $2,816.000
Totals: $2,036,526.700 $1,957,558.770 $3,278,029.790 $3,306,492.162 $4,400,850.000