Show Job Controls
Bid Cobra

HARRIS SH0288 (6476-11-001)

Items: 33

County: HARRIS
Length: 0.0100 MILES
Highway: SH0288
District: HOUSTON
Control Number: 6476-11-001
DBE Goal: 0.0%
Project: RMC - A00212749
Guaranty: $100,000.00
Time: 1095 CALENDAR DAYS
Engineer's Estimate: $17,617,900.00
Date: 06/02/2026 (8 days ago) Changed
Contract Number: 6264001
Type: FLEXIBLE ASSET MAINTENANCE OF HIGHWAYS
Project ID: A00212749
Project Description: FLEXIBLE ASSET MAINTENANCE OF HIGHWAYS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$17,617,900.00
Over/Under Est: 20.5% $3,612,454.75
Over/Under Est: 30.42% $5,358,860.00
Amt Left: 8.23% $1,746,405.25
$32,327,182.00
Over/Under Est: 83.49% $14,709,282.00
Amt Left: 52.27% $11,096,827.25
Delta: -40.70% -$9,350,422.00
Over/Under Est: 95.25% $16,780,424.35
Amt Left: 62.02% $13,167,969.60
Delta: -6.41% -$2,071,142.35

Bid Items & Bid Tabulations

33 Total 0 of 33
HARRIS  |  SH0288  |  HOUSTON  |  6476-11-001  |  06/02/2026  |  $17,617,900.00  |  RMC - A00212749  |  FLEXIBLE ASSET MAINT OF HWYS  |  1095 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAZMAT INTERNATIONAL, INC.
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
WEBBER INFRASTRUCTURE MANAGEMENT, INC.
LANDSCAPE TREATMENT (TY XIII)
CYC 4.000 $2,000.000 $2,500.000 $5,000.000 $9,483.000 $17,351.070
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 1,500.000 $50.000 $75.000 $74.000 $68.000 $89.070
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 1,500.000 $80.000 $100.000 $133.000 $114.000 $162.870
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $150.000 $125.000 $224.000 $217.000 $278.660
FLEXIBLE PAVEMENT STRUCTURE REPAIR(15")
SY 500.000 $170.000 $175.000 $255.000 $257.000 $323.200
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 2,000.000 $880.000 $1,325.000 $700.000 $1,200.000 $1,873.910
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
SY 1,000.000 $600.000 $565.000 $600.000 $684.000 $1,388.090
CONCRETE PAINT FINISH
SF 30,000.000 $4.000 $1.100 $3.000 $3.590 $1.580
MOBILIZATION (CALLOUT)
EA 20.000 $15,000.000 $1,000.000 $20,000.000 $265.000 $5,783.690
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $30.000 $28.930 $60.000 $37.000 $80.100
MTL W-BEAM GD FEN (STEEL POST)
LF 4,000.000 $30.000 $34.100 $30.000 $58.000 $88.260
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 18.000 $3,000.000 $2,211.000 $1,800.000 $1,792.000 $4,331.990
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,100.000 $1,325.000 $2,000.000 $1,971.000 $2,949.680
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $10.000 $2.500 $1.000 $8.480 $5.780
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $255.000 $100.000 $454.000 $283.400
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $300.000 $170.000 $100.000 $454.000 $294.970
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $300.000 $262.500 $100.000 $902.000 $404.860
RM MTL BM GD FENCE TRANS (TL-2)
EA 4.000 $250.000 $117.000 $100.000 $454.000 $404.860
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,000.000 $3,249.750 $4,000.000 $3,573.000 $6,448.810
GUARDRAIL END TREATMENT (REMOVE)
EA 26.000 $300.000 $355.000 $200.000 $902.000 $381.730
CRASH CUSH ATTEN (REMOVE)
EA 36.000 $1,000.000 $800.000 $2,000.000 $365.000 $1,191.440
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 29.000 $22,000.000 $22,400.000 $35,000.000 $25,286.000 $30,468.480
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 7.000 $42,000.000 $33,200.000 $30,000.000 $42,993.000 $51,104.680
SPOT MOWING
AC 10.000 $200.000 $325.000 $350.000 $402.000 $144.590
SPOT GRINDING - CONCRETE PAVEMENT
SY 6,000.000 $11.500 $40.000 $5.000 $31.000 $21.890
SPOT GRINDING -ASPHALTIC PAVEMENT
SY 3,000.000 $11.500 $40.000 $5.000 $5.150 $26.250
ROUTINE MAINTENANCE SERVICES
MI 360.000 $35,000.000 $43,000.000 $49,500.000 $72,500.000 $70,275.000
SNOW AND ICE CONTROL (SEASONAL)
MO 12.000 $6,500.000 $10,000.000 $20,000.000 $46,618.000 $27,457.030
SNOW AND ICE CONTROL (TRUCK)
HR 1,008.000 $150.000 $100.000 $45.000 $10.000 $168.460
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 720.000 $100.000 $125.000 $35.000 $64.000 $156.650
SNOW AND ICE CONTROL (LOADER)
HR 72.000 $75.000 $5.000 $250.000 $100.000 $172.970
SNOW AND ICE CONTROL (SPRAY RIG)
HR 800.000 $125.000 $150.000 $45.000 $105.000 $168.460
SNOW AND ICE CONTROL (SNOW PLOW)
HR 250.000 $150.000 $100.000 $150.000 $105.000 $165.410
Totals: $17,617,900.000 $21,230,354.750 $22,976,760.000 $32,327,182.000 $34,398,324.350