HARRIS SL0008 (6476-04-001)

Items: 48

County: HARRIS
Length: 0.0100 MILES
Highway: SL0008
District: HOUSTON
Control Number: 6476-04-001
DBE Goal: N/A
Project: RMC - A00212736
Guaranty: $30,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,509,733.00
Date: 05/01/2025 (1 year ago)
Contract Number: 5254004
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212736
Project Description: GUARDRAIL REPAIRS ON VARIOUS HIGHWAYS IN SOUTHEAST HARRIS COUNTY.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMAL ELAHI
VANESSA BOSQUES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,509,733.00
$1,126,484.00
Over/Under Est: -25.39% -$383,249.00
$1,159,304.00
Over/Under Est: -23.21% -$350,429.00
Amt Left: 2.91% $32,820.00
Over/Under Est: -22.21% -$335,245.00
Amt Left: 4.26% $48,004.00
Delta: -1.31% -$15,184.00
$1,175,018.00
Over/Under Est: -22.17% -$334,715.00
Amt Left: 4.31% $48,534.00
Delta: -0.05% -$530.00
Over/Under Est: -13.96% -$210,809.00
Amt Left: 15.31% $172,440.00
Delta: -10.55% -$123,906.00
Over/Under Est: -3.31% -$50,029.00
Amt Left: 29.58% $333,220.00
Delta: -12.38% -$160,780.00
Subcontractor Percentage Amount
SABER HIGHWAYS LLC 10.00% $112,648.40
ELITE CASTLE RESOURCES LLC 0.00% $0.00
Total: 10.00% $112,648.40

Bid Items & Bid Tabulations

48 Total 0 of 48
HARRIS  |  SL0008  |  HOUSTON  |  6476-04-001  |  05/01/2025  |  $1,509,733.00  |  RMC - A00212736  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
ISI CONTRACTING, INC.
BK FIELD OPERATIONS LLC
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
HAZMAT INTERNATIONAL, INC.
REMOV CONC (MOWSTRIP)
LF 600.000 $25.000 $3.000 $8.000 $12.000 $25.000 $15.000 $35.000
REMOV CONC (TRAFFIC BARRIER)
LF 120.000 $19.000 $20.000 $28.000 $30.000 $13.250 $25.000 $25.000
CONC STR REPAIR (STANDARD)
SF 1,150.000 $95.000 $80.000 $75.000 $80.000 $100.000 $90.000 $80.000
RIPRAP (MOW STRIP)(5 IN)
CY 10.000 $750.000 $500.000 $400.000 $600.000 $400.000 $1,000.000 $700.000
MOBILIZATION (CALLOUT)
EA 24.000 $250.000 $1.000 $300.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 30.000 $925.000 $1,100.000 $600.000 $2,500.000 $1.000 $1,800.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $132.000 $250.000 $175.000 $1.000 $1.000 $100.000 $75.000
TMA (STATIONARY)
DAY 300.000 $318.000 $1.000 $275.000 $1.000 $50.000 $350.000 $1,250.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 1,300.000 $12.000 $12.000 $5.500 $15.000 $12.000 $8.000 $25.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 200.000 $2.140 $5.000 $4.000 $1.000 $2.000 $20.000 $25.000
PORT CTB (REMOVE)(SAFETY SH)(TY 2)
LF 500.000 $10.000 $15.000 $6.000 $20.000 $10.000 $15.000 $25.000
PORT CTB (PINNING)
EA 40.000 $75.000 $200.000 $134.000 $500.000 $10.000 $750.000 $112.000
PORT CTB (ALIGNING)
LF 1,300.000 $12.900 $3.000 $2.600 $8.000 $5.000 $6.000 $3.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,179.000 $1,800.000 $1,650.000 $1,500.000 $1,600.000 $2,500.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,545.000 $1,000.000 $2,025.000 $900.000 $1,200.000 $1,750.000 $1,200.000
MTL W-BEAM GD FEN (SPECIAL)
LF 25.000 $25.000 $100.000 $40.000 $100.000 $100.000 $60.000 $40.000
CONNECTOR PLATE FOR THRIE BEAM
EA 5.000 $500.000 $500.000 $900.000 $2,000.000 $1,000.000 $750.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $20.000 $30.000 $8.500 $4.000 $40.000 $10.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 500.000 $35.000 $20.000 $13.000 $10.000 $1.000 $15.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 6,000.000 $23.000 $1.000 $17.000 $1.000 $10.000 $9.000 $15.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 8,000.000 $21.000 $30.000 $23.000 $25.000 $13.000 $14.000 $16.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 60.000 $45.000 $50.000 $35.000 $80.000 $1.000 $100.000 $25.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $625.000 $50.000 $890.000 $300.000 $1,000.000 $500.000 $350.000
REPLACE TIMBER POST W/O CONC FND
EA 300.000 $113.000 $20.000 $75.000 $20.000 $100.000 $75.000 $50.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $123.000 $50.000 $110.000 $1.000 $25.000 $75.000 $90.000
REPLACE TIMBER POST W/ CONC FND
EA 550.000 $192.000 $50.000 $125.000 $100.000 $100.000 $150.000 $50.000
REPLACE STEEL POST W/ CONC FND
EA 50.000 $294.000 $100.000 $160.000 $1.000 $25.000 $85.000 $90.000
REALIGN POSTS
EA 300.000 $31.000 $125.000 $11.000 $50.000 $5.000 $50.000 $25.000
REM OBSOLETE GET & REPL W/ SGT
EA 10.000 $3,500.000 $4,000.000 $2,850.000 $3,500.000 $3,500.000 $5,000.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,243.000 $1,000.000 $1,300.000 $2,500.000 $2,000.000 $1,000.000 $1,200.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5,500.000 $36.000 $35.000 $23.000 $25.000 $35.000 $31.000 $4.500
REPLACE SINGLE GDRAIL TERMINAL POST
EA 800.000 $73.000 $1.000 $55.000 $60.000 $52.000 $65.000 $115.000
REPLACE BLOCKOUT
EA 150.000 $59.000 $600.000 $39.000 $50.000 $140.000 $75.000 $33.000
REPAIR STEEL POST WITH BASE PLATE
EA 12.000 $151.000 $100.000 $512.000 $100.000 $50.000 $400.000 $200.000
RESET SGT IMPACT HEAD
EA 60.000 $439.000 $100.000 $110.000 $75.000 $90.000 $300.000 $500.000
REPLACE SGT OBJECT MARKER
EA 120.000 $100.000 $50.000 $36.000 $1.000 $100.000 $50.000 $60.000
REPLACE SGT CABLE ANCHOR
EA 120.000 $100.000 $50.000 $130.000 $1.000 $100.000 $125.000 $160.000
REPLACE SGT CABLE ASSEMBLY
EA 120.000 $140.000 $56.000 $185.000 $1.000 $125.000 $125.000 $180.000
REPLACE SGT STRUT
EA 40.000 $155.000 $56.000 $123.000 $1.000 $100.000 $75.000 $150.000
RAISE RAIL
LF 500.000 $22.000 $10.000 $14.000 $5.000 $34.000 $12.000 $12.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $992.000 $2,500.000 $1,430.000 $900.000 $1,150.000 $1,500.000 $1,330.000
REPLACE HINGED TOP SGT POST (STEEL)
EA 20.000 $400.000 $125.000 $200.000 $200.000 $90.000 $500.000 $200.000
REALIGN HINGED TOP SGT POST ((STEEL)
EA 20.000 $400.000 $125.000 $25.000 $200.000 $90.000 $300.000 $200.000
REPAIR (STEEL RAIL)
LF 150.000 $46.000 $50.000 $137.000 $125.000 $150.000 $100.000 $100.000
REPAIR (STEEL PED. RAIL)
LF 30.000 $296.000 $150.000 $161.000 $100.000 $400.000 $350.000 $100.000
REPAIR (STL PIPE PED RAIL)(PR1)
LF 60.000 $250.000 $150.000 $161.000 $100.000 $205.000 $50.000 $100.000
REPAIR(STL PIPE PED RAILW/PARAPET)(PR2)
LF 30.000 $250.000 $150.000 $161.000 $100.000 $205.000 $50.000 $100.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 130.000 $550.000 $400.000 $120.000 $500.000 $300.000 $600.000 $1,000.000
Totals: $1,509,733.000 $1,126,484.000 $1,159,304.000 $1,174,488.000 $1,175,018.000 $1,298,924.000 $1,459,704.000