Show Job Controls
Bid Cobra

HARRIS IH0010 (6473-96-001)

Items: 34

County: HARRIS
Length: 0.0100 MILES
Highway: IH0010
District: HOUSTON
Control Number: 6473-96-001
DBE Goal: 0.0%
Project: RMC - A00212293
Guaranty: $20,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,306,025.00
Date: 09/04/2025 (9 months ago) Changed
Contract Number: 7254201
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212293
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
HAMOON BAHRAMI
WILLIAM BURCH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,306,025.00
$793,130.00
Over/Under Est: -39.27% -$512,895.00
Over/Under Est: -32.05% -$418,595.00
Amt Left: 11.89% $94,300.00
Over/Under Est: -25.87% -$337,915.00
Amt Left: 22.06% $174,980.00
Delta: -9.09% -$80,680.00
Over/Under Est: -23.53% -$307,275.00
Amt Left: 25.93% $205,620.00
Delta: -3.16% -$30,640.00

Bid Items & Bid Tabulations

34 Total 0 of 34
HARRIS  |  IH0010  |  HOUSTON  |  6473-96-001  |  09/04/2025  |  $1,306,025.00  |  RMC - A00212293  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
ABOVE ALL CONTRACTING LLC
ROSS SA ENTERPRISE LLC
ROY JORGENSEN ASSOCIATES, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $880.000 $300.000 $400.000 $250.000 $420.000
MOBILIZATION (CALLOUT)
EA 50.000 $500.000 $250.000 $1.000 $1.000 $500.000
MOBILIZATION (EMERGENCY)
EA 30.000 $1,000.000 $1.000 $1.000 $500.000 $1,000.000
TMA (STATIONARY)
DAY 500.000 $200.000 $100.000 $1.000 $1.000 $5.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,300.000 $3,000.000 $1,400.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,585.000 $1,200.000 $1,700.000 $1,200.000 $1,500.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $270.000 $1.000 $100.000 $100.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,270.000 $4,000.000 $3,000.000 $2,900.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $375.000 $1.000 $200.000 $500.000 $2,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $40.000 $25.000 $30.000 $15.000 $16.850
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 500.000 $25.000 $1.000 $25.000 $20.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 8,000.000 $15.000 $2.000 $1.000 $10.000 $14.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 3,000.000 $15.000 $2.000 $1.000 $10.000 $30.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 6,000.000 $30.000 $20.000 $30.000 $23.000 $20.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 300.000 $45.000 $300.000 $70.000 $35.000 $36.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 200.000 $110.000 $100.000 $50.000 $35.000 $150.000
REPLACE TIMBER POST W/O CONC FND
EA 75.000 $50.000 $70.000 $50.000 $30.000 $47.000
REPLACE STEEL POST W/O CONC FND
EA 25.000 $50.000 $20.000 $100.000 $100.000 $47.000
REPLACE TIMBER POST W/ CONC FND
EA 700.000 $50.000 $60.000 $30.000 $60.000 $53.000
REPLACE STEEL POST W/ CONC FND
EA 50.000 $62.500 $50.000 $100.000 $100.000 $125.000
REALIGN POSTS
EA 100.000 $30.000 $1.000 $30.000 $88.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $20.000 $1.000 $10.000 $1.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 25.000 $20.000 $1.000 $10.000 $50.000 $10.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,200.000 $1,800.000 $1,000.000 $1,200.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5,600.000 $45.000 $15.000 $35.000 $40.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 650.000 $65.000 $55.000 $110.000 $100.000 $75.000
REPLACE BLOCKOUT
EA 700.000 $50.000 $1.000 $100.000 $80.000 $5.000
RESET SGT IMPACT HEAD
EA 50.000 $100.000 $1.000 $50.000 $50.000 $250.000
REPLACE SGT OBJECT MARKER
EA 125.000 $30.000 $80.000 $50.000 $100.000 $25.000
REPLACE SGT CABLE ANCHOR
EA 125.000 $90.000 $80.000 $100.000 $100.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 125.000 $100.000 $80.000 $100.000 $100.000 $110.000
REPLACE SGT STRUT
EA 50.000 $125.000 $300.000 $100.000 $100.000 $150.000
RAISE RAIL
LF 2,600.000 $20.000 $1.000 $5.000 $10.000 $10.000
REPAIR (STEEL PED. RAIL)
LF 100.000 $305.000 $1.000 $250.000 $100.000 $250.000
Totals: $1,306,025.000 $793,130.000 $887,430.000 $968,110.000 $998,750.000