Show Job Controls
Bid Cobra

HARRIS IH0045 (6473-63-001)

Items: 173

County: HARRIS
Length: 0.0100 MILES
Highway: IH0045
District: HOUSTON
Control Number: 6473-63-001
DBE Goal: N/A
Project: RMC - A00212242
Guaranty: $94,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $4,692,797.46
Date: 01/08/2025 (1 year ago)
Contract Number: 1254211
Type: TOTAL MAINTENANCE
Project ID: A00212242
Project Description: GENERAL MAINTENANCE ON IH 45 IN HARRIS AND GALVESTON COUNTY.
Mail/Deliver Bids To: N/A
RACIEL CASTILLO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,692,797.46
$4,290,486.28
Over/Under Est: -8.57% -$402,311.18
Over/Under Est: -6.03% -$282,792.46
Amt Left: 2.79% $119,518.72

Bid Items & Bid Tabulations

173 Total 0 of 173
HARRIS  |  IH0045  |  HOUSTON  |  6473-63-001  |  01/08/2025  |  $4,692,797.46  |  RMC - A00212242  |  TOTAL MAINT  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
REMOV CONC (RIPRAP)
CY 50.000 $50.000 $10.440 $50.000
REMOV CONC (TRAFFIC BARRIER)
LF 60.000 $10.000 $2.000 $75.000
BLADING
LF 1,500.000 $10.000 $1.870 $15.000
FULL - DEPTH REPAIR CRCP (10")
CY 100.000 $2,100.000 $1,327.000 $900.000
FULL - DEPTH REPAIR CRCP (12")
CY 50.000 $1,800.000 $1,306.000 $1,000.000
FULL - DEPTH REPAIR CRCP (14")
CY 80.000 $1,700.000 $1,234.000 $1,000.000
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
CY 40.000 $2,100.000 $520.000 $1,500.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 25.000 $88.000 $25.000 $250.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 12.000 $158.000 $25.000 $400.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 200.000 $160.000 $175.000 $175.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 50.000 $210.000 $175.000 $350.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 200.000 $174.000 $71.610 $250.000
CONC STR REPAIR (STANDARD)
SF 600.000 $150.000 $113.850 $150.000
RIPRAP (CONC)(5 IN)
CY 50.000 $550.000 $455.000 $650.000
RIPRAP (MOW STRIP)(5 IN)
CY 50.000 $550.000 $250.000 $650.000
CLEANING AND SEALING EXISTING JOINTS
LF 300.000 $49.000 $40.340 $100.000
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $3,000.000 $250.000
MOBILIZATION (EMERGENCY)
EA 20.000 $2,000.000 $5,000.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $150.000 $208.780 $150.000
TMA (STATIONARY)
DAY 200.000 $400.000 $500.000 $400.000
TMA (MOBILE OPERATION)
HR 2,000.000 $68.000 $81.520 $80.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 30.000 $10.000 $8.680 $50.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 120.000 $15.000 $2.140 $50.000
PORT CTB (REMOVE)(SAFETY SH)(TY 2)
LF 30.000 $15.000 $1.030 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,100.000 $3,396.440 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,500.000 $2,000.730 $800.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $2,000.000 $1,392.610 $2,000.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $2,000.000 $567.030 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $2,000.000 $567.030 $3,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 10.000 $26,500.000 $24,250.000 $23,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 6.000 $37,000.000 $34,150.000 $30,000.000
ALUMINUM SIGNS (TY A)
SF 700.000 $41.000 $34.670 $35.000
ALUMINUM SIGNS (TY G)
SF 350.000 $32.000 $100.030 $50.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 300.000 $35.000 $34.670 $50.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 5.000 $1,800.000 $3,824.000 $3,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 5.000 $1,900.000 $3,858.000 $3,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 100.000 $950.000 $626.140 $650.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 2,000.000 $17.000 $11.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 300.000 $32.000 $18.030 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 2,000.000 $15.000 $13.890 $10.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 300.000 $3.090 $3.100 $2.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,000.000 $1.300 $2.020 $1.500
REFL PAV MRK TY I (W)18"(SLD)(090MIL)
LF 1,000.000 $3.810 $6.980 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 5,000.000 $7.100 $8.220 $5.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 20.000 $165.000 $258.460 $170.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 20.000 $196.000 $284.300 $205.000
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
EA 1.000 $265.000 $465.230 $305.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 20.000 $185.000 $258.460 $205.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 25.000 $205.000 $284.300 $205.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 20.000 $669.500 $723.680 $645.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 20.000 $669.500 $723.680 $695.000
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
SF 1.000 $10.300 $15.510 $500.000
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
EA 20.000 $360.500 $465.230 $200.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 1.000 $262.000 $723.680 $180.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 1,000.000 $1.250 $2.020 $0.950
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 100.000 $4.640 $4.140 $3.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 50.000 $9.270 $8.270 $6.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 5.000 $515.000 $594.450 $205.000
RE PM TY III (W)(6")(SLD)
LF 5,000.000 $0.790 $1.910 $0.750
RE PM TY III (W)(6")(BRK)
LF 2,500.000 $0.870 $2.120 $0.750
RE PM TY III (W)(12")(SLD)
LF 500.000 $6.650 $8.270 $4.000
RE PM TY III (Y)(6")(SLD)
LF 5,000.000 $0.870 $1.910 $0.750
RE PM TY III (Y)(6")(BRK)
LF 100.000 $1.100 $2.580 $1.500
RE PM TY III (BLK)(6")(SHADOW)
LF 2,500.000 $0.900 $2.580 $1.000
PAVEMENT SLER 6"
LF 1,300.000 $0.250 $0.520 $1.000
PAVEMENT SLER 8"
LF 5,000.000 $0.250 $0.830 $1.250
PAVEMENT SLER 12"
LF 1,000.000 $0.770 $1.030 $1.500
PAVEMENT SLER 24"
LF 5,000.000 $1.550 $2.480 $2.000
PAVEMENT SLER (ARROW)
EA 20.000 $41.200 $25.850 $40.000
PAVEMENT SLER (WORD)
EA 25.000 $41.200 $25.850 $40.000
PAVEMENT SLER (MED NOSE)
EA 20.000 $103.000 $129.230 $100.000
PAVEMENT SLER (DBL ARROW)
EA 20.000 $77.250 $25.850 $60.000
PAVEMENT SLER (TPL ARROW)
EA 1.000 $82.400 $103.380 $500.000
PAVEMENT SLER (UTURN ARROW)
EA 20.000 $82.400 $25.850 $40.000
PAVEMENT SLER (ENTR GORE)
EA 20.000 $154.500 $258.460 $130.000
PAVEMENT SLER (EXIT GORE)
EA 20.000 $154.500 $258.460 $130.000
PAVEMENT SLER (SYMBOL)
EA 1.000 $180.250 $51.690 $50.000
PAVEMENT SLER (ISLAND)
SF 1.000 $30.900 $5.170 $300.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 500.000 $1.000 $1.140 $1.100
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 500.000 $1.000 $1.140 $1.100
PREFAB PM TY C (W)(WORD)
EA 2.000 $318.000 $356.670 $305.000
REFL PAV MRKR TY I-A
EA 25.000 $6.530 $8.270 $8.000
REFL PAV MRKR TY I-C
EA 100.000 $6.000 $8.270 $8.000
REFL PAV MRKR TY I-R
EA 100.000 $6.960 $10.340 $12.000
REFL PAV MRKR TY II-A-A
EA 200.000 $6.070 $8.270 $8.000
REFL PAV MRKR TY II-C-R
EA 1,000.000 $10.000 $7.240 $10.000
ELIM EXT PM & MRKS (6")
LF 1,300.000 $0.520 $0.980 $1.000
ELIM EXT PM & MRKS (8")
LF 5,000.000 $1.030 $1.550 $1.500
ELIM EXT PM & MRKS (12")
LF 1,000.000 $2.060 $2.070 $3.000
ELIM EXT PM & MRKS (24")
LF 5,000.000 $4.000 $4.140 $4.250
ELIM EXT PM & MRKS (ARROW)
EA 20.000 $80.000 $103.380 $60.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 20.000 $80.000 $129.230 $70.000
ELIM EXT PM & MRKS (TPL ARROW)
EA 1.000 $79.000 $129.230 $80.000
ELIM EXT PM & MRKS (UTURN ARROW)
EA 20.000 $72.100 $77.540 $80.000
ELIM EXT PM & MRKS (WORD)
EA 25.000 $79.000 $129.230 $60.000
ELIM EXT PM & MRKS (ENTR GORE)
EA 20.000 $654.050 $465.230 $255.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 20.000 $654.050 $465.230 $255.000
ELIM EXT PM & MRKS (SYMBOL)
EA 1.000 $79.000 $129.230 $300.000
ELIM EXT PM & MRKS (MED NOSE)
EA 20.000 $283.250 $258.460 $105.000
PAV SURF PREP FOR MRK (6")
LF 1,300.000 $0.100 $0.020 $1.000
PAV SURF PREP FOR MRK (8")
LF 5,000.000 $0.020 $0.040 $1.250
PAV SURF PREP FOR MRK (12")
LF 1,000.000 $0.520 $0.060 $1.500
PAV SURF PREP FOR MRK (24")
LF 5,000.000 $0.080 $0.120 $2.500
PAV SURF PREP FOR MRK (ARROW)
EA 20.000 $6.560 $5.170 $20.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 20.000 $7.180 $10.340 $20.000
PAV SURF PREP FOR MRK (TPL ARROW)
EA 1.000 $7.180 $15.510 $20.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 20.000 $7.180 $10.340 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 25.000 $7.180 $10.340 $20.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 20.000 $15.000 $51.690 $30.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 20.000 $15.000 $51.690 $30.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 1.000 $7.180 $10.340 $30.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 20.000 $7.180 $51.690 $30.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 500.000 $13.000 $2.300 $10.000
SPOT MOWING
AC 300.000 $133.000 $10.000 $75.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 75.000 $350.000 $100.000 $650.000
LITTER REMOVAL (SPOT)
AC 4.000 $100.000 $117.500 $1,500.000
LITTER REMOVAL - TRACT (1)
CYC 48.000 $5,600.000 $7,200.000 $5,500.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 48.000 $1,500.000 $80.000 $2,500.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
CYC 36.000 $1,000.000 $80.000 $2,500.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 36.000 $800.000 $80.000 $1,500.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 36.000 $750.000 $80.000 $1,500.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 48.000 $3,500.000 $187.000 $3,600.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 48.000 $3,500.000 $187.000 $3,600.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 36.000 $4,750.000 $187.000 $4,900.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 48.000 $2,650.000 $187.000 $2,900.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 48.000 $1,350.000 $187.000 $1,400.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 48.000 $1,650.000 $187.000 $1,400.000
CLEANING / SWEEPING (HANDWORK)
SY 20,000.000 $0.970 $1.050 $1.000
DRAIN INLET CLEANING
EA 300.000 $50.000 $53.320 $65.000
DOWNSPOUT CLEANING
EA 75.000 $50.000 $79.990 $75.000
STORM SEWER CLEANING (PIPE) (<12" DIA)
LF 50.000 $5.000 $2.670 $3.500
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 3,000.000 $5.000 $3.200 $4.500
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 5,000.000 $7.000 $3.730 $4.500
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 10,000.000 $8.000 $5.070 $5.250
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 10,000.000 $10.000 $6.130 $6.250
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 5,000.000 $11.500 $7.200 $7.500
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 850.000 $17.500 $10.660 $12.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 4,000.000 $18.500 $13.600 $13.500
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 2,000.000 $19.500 $16.000 $16.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,700.000 $26.000 $25.330 $14.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $34.000 $33.040 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $50.000 $1,075.820 $300.000
REPLACE TIMBER POST W/O CONC FND
EA 80.000 $28.000 $113.480 $65.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $78.500 $147.610 $75.000
REPLACE TIMBER POST W/ CONC FND
EA 100.000 $36.000 $259.910 $100.000
REPLACE STEEL POST W/ CONC FND
EA 150.000 $105.000 $294.030 $75.000
REALIGN POSTS
EA 100.000 $15.000 $12.370 $75.000
REM OBSOLETE GET & REPL W/ SGT
EA 10.000 $3,400.000 $2,645.140 $2,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,250.000 $1,486.450 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $33.000 $37.740 $34.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 300.000 $100.000 $46.470 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 3.000 $325.000 $202.130 $750.000
RESET SGT IMPACT HEAD
EA 20.000 $500.000 $579.440 $300.000
REPLACE SGT OBJECT MARKER
EA 50.000 $40.000 $29.760 $100.000
REPLACE SGT CABLE ANCHOR
EA 50.000 $100.000 $116.720 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 50.000 $100.000 $181.740 $100.000
REPLACE SGT STRUT
EA 25.000 $100.000 $110.520 $100.000
RAISE RAIL
LF 500.000 $11.000 $15.120 $15.000
REPAIR (SMTC) NARROW
LF 440.000 $200.000 $148.780 $250.000
REPAIR (SMTC) WIDE
LF 224.000 $200.000 $148.780 $275.000
REPAIR (REACT)(M)
LF 176.000 $100.000 $148.780 $50.000
REPAIR (REACT) WIDE
LF 88.000 $450.000 $45.360 $50.000
REPAIR (STL PIPE PED RAIL)(PR1)
LF 15.000 $200.000 $460.610 $300.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 200.000 $349.000 $1,138.000 $350.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 50.000 $1,200.000 $2,247.000 $700.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 250.000 $60.000 $155.130 $100.000
SNOW AND ICE CONTROL (TRUCK)
HR 100.000 $110.000 $75.000 $200.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 400.000 $100.000 $1.000 $80.000
SNOW AND ICE CONTROL (LOADER)
HR 25.000 $150.000 $50.000 $150.000
SNOW AND ICE CONTROL (SEASON)
MO 6.000 $15,000.000 $100,000.000 $20,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $110.000 $175.000 $50.000
REPAIR LARGE RDSD SIGN SUPT & ASSEM
EA 25.000 $1,500.000 $1,630.000 $1,250.000
STORM SEWER (TELEVISION INSPECTION)
LF 300.000 $100.000 $1.030 $30.000
Totals: $4,692,811.460 $4,290,486.280 $4,410,005.000