REMOV CONC (RIPRAP)
|
CY
|
50.000
|
$50.000
|
$10.440
|
$50.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
60.000
|
$10.000
|
$2.000
|
$75.000
|
|
|
BLADING
|
LF
|
1,500.000
|
$10.000
|
$1.870
|
$15.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
CY
|
100.000
|
$2,100.000
|
$1,327.000
|
$900.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
CY
|
50.000
|
$1,800.000
|
$1,306.000
|
$1,000.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
CY
|
80.000
|
$1,700.000
|
$1,234.000
|
$1,000.000
|
|
|
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
|
CY
|
40.000
|
$2,100.000
|
$520.000
|
$1,500.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
25.000
|
$88.000
|
$25.000
|
$250.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
12.000
|
$158.000
|
$25.000
|
$400.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
200.000
|
$160.000
|
$175.000
|
$175.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
50.000
|
$210.000
|
$175.000
|
$350.000
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
200.000
|
$174.000
|
$71.610
|
$250.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
600.000
|
$150.000
|
$113.850
|
$150.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
50.000
|
$550.000
|
$455.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
50.000
|
$550.000
|
$250.000
|
$650.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
300.000
|
$49.000
|
$40.340
|
$100.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$500.000
|
$3,000.000
|
$250.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
20.000
|
$2,000.000
|
$5,000.000
|
$2,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$150.000
|
$208.780
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$400.000
|
$500.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$68.000
|
$81.520
|
$80.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
30.000
|
$10.000
|
$8.680
|
$50.000
|
|
|
PORT CTB (MOVE)(SAFETY SH)(TY 2)
|
LF
|
120.000
|
$15.000
|
$2.140
|
$50.000
|
|
|
PORT CTB (REMOVE)(SAFETY SH)(TY 2)
|
LF
|
30.000
|
$15.000
|
$1.030
|
$50.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,100.000
|
$3,396.440
|
$1,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,500.000
|
$2,000.730
|
$800.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$2,000.000
|
$1,392.610
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$2,000.000
|
$567.030
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$2,000.000
|
$567.030
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
10.000
|
$26,500.000
|
$24,250.000
|
$23,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
6.000
|
$37,000.000
|
$34,150.000
|
$30,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
700.000
|
$41.000
|
$34.670
|
$35.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
350.000
|
$32.000
|
$100.030
|
$50.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
300.000
|
$35.000
|
$34.670
|
$50.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
5.000
|
$1,800.000
|
$3,824.000
|
$3,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
5.000
|
$1,900.000
|
$3,858.000
|
$3,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
100.000
|
$950.000
|
$626.140
|
$650.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
2,000.000
|
$17.000
|
$11.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
300.000
|
$32.000
|
$18.030
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
2,000.000
|
$15.000
|
$13.890
|
$10.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
300.000
|
$3.090
|
$3.100
|
$2.350
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,000.000
|
$1.300
|
$2.020
|
$1.500
|
|
REFL PAV MRK TY I (W)18"(SLD)(090MIL)
|
LF
|
1,000.000
|
$3.810
|
$6.980
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
5,000.000
|
$7.100
|
$8.220
|
$5.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$165.000
|
$258.460
|
$170.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
20.000
|
$196.000
|
$284.300
|
$205.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$265.000
|
$465.230
|
$305.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
20.000
|
$185.000
|
$258.460
|
$205.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
25.000
|
$205.000
|
$284.300
|
$205.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
20.000
|
$669.500
|
$723.680
|
$645.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
20.000
|
$669.500
|
$723.680
|
$695.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
1.000
|
$10.300
|
$15.510
|
$500.000
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
20.000
|
$360.500
|
$465.230
|
$200.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$262.000
|
$723.680
|
$180.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.250
|
$2.020
|
$0.950
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
100.000
|
$4.640
|
$4.140
|
$3.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
50.000
|
$9.270
|
$8.270
|
$6.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$515.000
|
$594.450
|
$205.000
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
5,000.000
|
$0.790
|
$1.910
|
$0.750
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
2,500.000
|
$0.870
|
$2.120
|
$0.750
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
500.000
|
$6.650
|
$8.270
|
$4.000
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
5,000.000
|
$0.870
|
$1.910
|
$0.750
|
|
RE PM TY III (Y)(6")(BRK)
|
LF
|
100.000
|
$1.100
|
$2.580
|
$1.500
|
|
RE PM TY III (BLK)(6")(SHADOW)
|
LF
|
2,500.000
|
$0.900
|
$2.580
|
$1.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,300.000
|
$0.250
|
$0.520
|
$1.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
5,000.000
|
$0.250
|
$0.830
|
$1.250
|
|
|
PAVEMENT SLER 12"
|
LF
|
1,000.000
|
$0.770
|
$1.030
|
$1.500
|
|
|
PAVEMENT SLER 24"
|
LF
|
5,000.000
|
$1.550
|
$2.480
|
$2.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
20.000
|
$41.200
|
$25.850
|
$40.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
25.000
|
$41.200
|
$25.850
|
$40.000
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
20.000
|
$103.000
|
$129.230
|
$100.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
20.000
|
$77.250
|
$25.850
|
$60.000
|
|
|
PAVEMENT SLER (TPL ARROW)
|
EA
|
1.000
|
$82.400
|
$103.380
|
$500.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
20.000
|
$82.400
|
$25.850
|
$40.000
|
|
|
PAVEMENT SLER (ENTR GORE)
|
EA
|
20.000
|
$154.500
|
$258.460
|
$130.000
|
|
|
PAVEMENT SLER (EXIT GORE)
|
EA
|
20.000
|
$154.500
|
$258.460
|
$130.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
1.000
|
$180.250
|
$51.690
|
$50.000
|
|
|
PAVEMENT SLER (ISLAND)
|
SF
|
1.000
|
$30.900
|
$5.170
|
$300.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
500.000
|
$1.000
|
$1.140
|
$1.100
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
500.000
|
$1.000
|
$1.140
|
$1.100
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$318.000
|
$356.670
|
$305.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$6.530
|
$8.270
|
$8.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
100.000
|
$6.000
|
$8.270
|
$8.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
100.000
|
$6.960
|
$10.340
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
200.000
|
$6.070
|
$8.270
|
$8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$10.000
|
$7.240
|
$10.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
1,300.000
|
$0.520
|
$0.980
|
$1.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
5,000.000
|
$1.030
|
$1.550
|
$1.500
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,000.000
|
$2.060
|
$2.070
|
$3.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
5,000.000
|
$4.000
|
$4.140
|
$4.250
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
20.000
|
$80.000
|
$103.380
|
$60.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
20.000
|
$80.000
|
$129.230
|
$70.000
|
|
|
ELIM EXT PM & MRKS (TPL ARROW)
|
EA
|
1.000
|
$79.000
|
$129.230
|
$80.000
|
|
|
ELIM EXT PM & MRKS (UTURN ARROW)
|
EA
|
20.000
|
$72.100
|
$77.540
|
$80.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
25.000
|
$79.000
|
$129.230
|
$60.000
|
|
|
ELIM EXT PM & MRKS (ENTR GORE)
|
EA
|
20.000
|
$654.050
|
$465.230
|
$255.000
|
|
|
ELIM EXT PM & MRKS (EXIT GORE)
|
EA
|
20.000
|
$654.050
|
$465.230
|
$255.000
|
|
|
ELIM EXT PM & MRKS (SYMBOL)
|
EA
|
1.000
|
$79.000
|
$129.230
|
$300.000
|
|
|
ELIM EXT PM & MRKS (MED NOSE)
|
EA
|
20.000
|
$283.250
|
$258.460
|
$105.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,300.000
|
$0.100
|
$0.020
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,000.000
|
$0.020
|
$0.040
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,000.000
|
$0.520
|
$0.060
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,000.000
|
$0.080
|
$0.120
|
$2.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$6.560
|
$5.170
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
20.000
|
$7.180
|
$10.340
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$7.180
|
$15.510
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$7.180
|
$10.340
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$7.180
|
$10.340
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
20.000
|
$15.000
|
$51.690
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
20.000
|
$15.000
|
$51.690
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$7.180
|
$10.340
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
20.000
|
$7.180
|
$51.690
|
$30.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
500.000
|
$13.000
|
$2.300
|
$10.000
|
|
|
SPOT MOWING
|
AC
|
300.000
|
$133.000
|
$10.000
|
$75.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
75.000
|
$350.000
|
$100.000
|
$650.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
4.000
|
$100.000
|
$117.500
|
$1,500.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$5,600.000
|
$7,200.000
|
$5,500.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
48.000
|
$1,500.000
|
$80.000
|
$2,500.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
36.000
|
$1,000.000
|
$80.000
|
$2,500.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
36.000
|
$800.000
|
$80.000
|
$1,500.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
36.000
|
$750.000
|
$80.000
|
$1,500.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
48.000
|
$3,500.000
|
$187.000
|
$3,600.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
48.000
|
$3,500.000
|
$187.000
|
$3,600.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
36.000
|
$4,750.000
|
$187.000
|
$4,900.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
48.000
|
$2,650.000
|
$187.000
|
$2,900.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
48.000
|
$1,350.000
|
$187.000
|
$1,400.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
48.000
|
$1,650.000
|
$187.000
|
$1,400.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
20,000.000
|
$0.970
|
$1.050
|
$1.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
300.000
|
$50.000
|
$53.320
|
$65.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
75.000
|
$50.000
|
$79.990
|
$75.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
50.000
|
$5.000
|
$2.670
|
$3.500
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
3,000.000
|
$5.000
|
$3.200
|
$4.500
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
5,000.000
|
$7.000
|
$3.730
|
$4.500
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
10,000.000
|
$8.000
|
$5.070
|
$5.250
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
10,000.000
|
$10.000
|
$6.130
|
$6.250
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
5,000.000
|
$11.500
|
$7.200
|
$7.500
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
850.000
|
$17.500
|
$10.660
|
$12.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
4,000.000
|
$18.500
|
$13.600
|
$13.500
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
2,000.000
|
$19.500
|
$16.000
|
$16.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
1,700.000
|
$26.000
|
$25.330
|
$14.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
25.000
|
$34.000
|
$33.040
|
$100.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
5.000
|
$50.000
|
$1,075.820
|
$300.000
|
|
|
REPLACE TIMBER POST W/O CONC FND
|
EA
|
80.000
|
$28.000
|
$113.480
|
$65.000
|
|
|
REPLACE STEEL POST W/O CONC FND
|
EA
|
50.000
|
$78.500
|
$147.610
|
$75.000
|
|
|
REPLACE TIMBER POST W/ CONC FND
|
EA
|
100.000
|
$36.000
|
$259.910
|
$100.000
|
|
|
REPLACE STEEL POST W/ CONC FND
|
EA
|
150.000
|
$105.000
|
$294.030
|
$75.000
|
|
|
REALIGN POSTS
|
EA
|
100.000
|
$15.000
|
$12.370
|
$75.000
|
|
|
REM OBSOLETE GET & REPL W/ SGT
|
EA
|
10.000
|
$3,400.000
|
$2,645.140
|
$2,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$1,250.000
|
$1,486.450
|
$1,000.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,000.000
|
$33.000
|
$37.740
|
$34.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
300.000
|
$100.000
|
$46.470
|
$60.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$325.000
|
$202.130
|
$750.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
20.000
|
$500.000
|
$579.440
|
$300.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$40.000
|
$29.760
|
$100.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
50.000
|
$100.000
|
$116.720
|
$100.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
50.000
|
$100.000
|
$181.740
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$100.000
|
$110.520
|
$100.000
|
|
|
RAISE RAIL
|
LF
|
500.000
|
$11.000
|
$15.120
|
$15.000
|
|
|
REPAIR (SMTC) NARROW
|
LF
|
440.000
|
$200.000
|
$148.780
|
$250.000
|
|
|
REPAIR (SMTC) WIDE
|
LF
|
224.000
|
$200.000
|
$148.780
|
$275.000
|
|
|
REPAIR (REACT)(M)
|
LF
|
176.000
|
$100.000
|
$148.780
|
$50.000
|
|
|
REPAIR (REACT) WIDE
|
LF
|
88.000
|
$450.000
|
$45.360
|
$50.000
|
|
|
REPAIR (STL PIPE PED RAIL)(PR1)
|
LF
|
15.000
|
$200.000
|
$460.610
|
$300.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
200.000
|
$349.000
|
$1,138.000
|
$350.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
50.000
|
$1,200.000
|
$2,247.000
|
$700.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
250.000
|
$60.000
|
$155.130
|
$100.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
100.000
|
$110.000
|
$75.000
|
$200.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
400.000
|
$100.000
|
$1.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
25.000
|
$150.000
|
$50.000
|
$150.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$15,000.000
|
$100,000.000
|
$20,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$110.000
|
$175.000
|
$50.000
|
|
|
REPAIR LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$1,500.000
|
$1,630.000
|
$1,250.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
300.000
|
$100.000
|
$1.030
|
$30.000
|
|
Totals: |
$4,692,811.460
|
$4,290,486.280
|
$4,410,005.000
|