Show Job Controls
Bid Cobra

HARRIS IH0610 (6465-82-001)

Items: 37

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6465-82-001
DBE Goal: 0.0%
Project: RMC - 646582001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $3,427,044.80
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: CONCRETE SPALL REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,427,044.80
$5,629,750.00
Over/Under Est: 64.27% $2,202,705.20
$6,190,489.00
Over/Under Est: 80.64% $2,763,444.20
Amt Left: 9.96% $560,739.00

Bid Items & Bid Tabulations

37 Total 0 of 37
HARRIS  |  IH0610  |  HOUSTON  |  6465-82-001  |  07/10/2024  |  $3,427,044.80  |  RMC - 646582001  |  CONC SPALL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MC2 CIVIL, LLC
ISI CONTRACTING, INC.
REMOVING CONC (CURB)
LF 50.000 $4.830 $15.000 $3.500
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 250.000 $425.000 $450.000 $494.000
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 3,000.000 $500.000 $1,100.000 $1,300.000
FLOWABLE BACKFILL
CY 50.000 $300.000 $300.000 $450.000
CONC STR REPAIR (EPOXY MORTAR)
SF 500.000 $87.000 $200.000 $140.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 200.000 $278.510 $150.000 $140.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 300.000 $150.000 $150.000 $140.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 400.000 $200.000 $250.000 $140.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 500.000 $250.000 $250.000 $140.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 2,500.000 $150.000 $150.000 $110.000
CONC STR REPAIR (STANDARD)
SF 500.000 $120.000 $150.000 $110.000
RIPRAP (CONC)(5 IN)
CY 50.000 $450.000 $650.000 $800.000
CLEANING AND SEALING EXISTING JOINTS
LF 3,000.000 $14.000 $25.000 $30.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 500.000 $30.000 $60.000 $45.000
CLEANING EXISTING JOINTS
LF 2,000.000 $8.360 $25.000 $25.000
INLET (COMPL)(TY AZ)
EA 4.000 $4,000.000 $9,500.000 $6,638.000
INLET (COMPL)(EXT TY C)
EA 4.000 $2,500.000 $3,000.000 $1,313.000
INLET (STG II)(TY C)
EA 10.000 $2,966.000 $4,500.000 $2,850.000
MANH (STG II)(TY A)
EA 10.000 $3,800.000 $8,500.000 $5,925.000
ADJUSTING MANHOLES
EA 1.000 $800.000 $250.000 $1,050.000
REMOV STR (INLET)
EA 4.000 $300.000 $1,500.000 $565.000
REMOV STR (MANHOLE)
EA 4.000 $450.000 $1,500.000 $845.000
MOBILIZATION (CALLOUT)
EA 12.000 $350.000 $250.000 $500.000
MOBILIZATION (EMERGENCY)
EA 6.000 $1,250.000 $2,000.000 $6,000.000
CONC CURB (MONO) (TY I)
LF 100.000 $10.500 $40.000 $15.000
CONC CURB (MONO) (TY II)
LF 100.000 $5.730 $40.000 $15.000
CONC CURB (U-TURN)
LF 1,000.000 $125.000 $130.000 $50.000
CONC CURB (DOWEL)
LF 300.000 $1.200 $40.000 $15.000
CONC SIDEWALKS (4")
SY 300.000 $110.000 $70.000 $100.000
CURB RAMPS (TY 1)
EA 1.000 $2,500.000 $2,500.000 $4,250.000
CURB RAMPS (TY 7)
EA 1.000 $2,500.000 $2,500.000 $4,250.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 10,000.000 $1.300 $4.000 $3.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 250.000 $750.000 $850.000 $700.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 250.000 $750.000 $950.000 $700.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 10,000.000 $5.880 $9.000 $7.450
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 365.000 $100.000 $150.000 $418.000
TMA (STATIONARY)
DAY 730.000 $229.710 $200.000 $650.000
Totals: $3,427,044.800 $5,629,750.000 $6,190,489.000