Show Job Controls
Bid Cobra

HARRIS IH0610 (6424-32-001)

Items: 64

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6424-32-001
DBE Goal: N/A
Project: RMC - 642432001
Guaranty: N/A
Time: 731 CALENDAR DAYS
Engineer's Estimate: $3,003,589.36
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: ILLUMINATION MAINTENANCE
Mail/Deliver Bids To: N/A
ROBBIE PUGH
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$3,003,589.36
$2,277,980.00
Over/Under Est: -24.16% -$725,609.36
$3,823,923.50
Over/Under Est: 27.31% $820,334.14
Amt Left: 67.86% $1,545,943.50
Over/Under Est: 76.84% $2,307,954.14
Amt Left: 133.17% $3,033,563.50
Delta: -38.90% -$1,487,620.00

Bid Items & Bid Tabulations

64 Total 0 of 64
HARRIS  |  IH0610  |  HOUSTON  |  6424-32-001  |  08/02/2023  |  $3,003,589.36  |  RMC - 642432001  |  ILLUM MAINT  |  731 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LINDSEY ELECTRIC, L.P.
TRAF-TEX, INC.
THIRD COAST SERVICES LLC
MOBILIZATION (CALLOUT)
EA 30.000 $441.810 $25.000 $552.000 $2,782.000
MOBILIZATION (EMERGENCY)
EA 3.000 $619.400 $25.000 $1,062.000 $2,782.000
REMOVE RD IL ASM (U/P)
EA 100.000 $120.240 $50.000 $43.000 $440.000
IN RD IL (U/P) (TY 2) (250W EQ) LED
EA 200.000 $710.600 $600.000 $893.000 $1,128.000
RELOCATE ELECTRICAL SERVICES
EA 25.000 $669.150 $100.000 $1,428.000 $2,771.000
REMOVE ELECTRICAL SERVICES
EA 25.000 $328.860 $100.000 $545.000 $440.000
INSTALL OF CONDUIT BY TRENCHING
LF 1,000.000 $10.950 $10.000 $21.000 $16.770
INSTALL OF ELECTRICAL SERVICE
EA 30.000 $2,790.820 $3,500.000 $7,163.000 $7,586.000
INSTALL ABOVE-GROUND CONDUIT
LF 400.000 $23.450 $5.000 $45.000 $31.000
REPLACE ABOVE-GROUND CONDUIT
LF 5,000.000 $19.650 $8.000 $45.330 $34.000
INSTALL UNDERGROUND CONDUIT
LF 400.000 $10.110 $8.000 $21.330 $18.000
REPLACE UNDERGROUND CONDUIT
LF 3,550.000 $10.590 $8.000 $29.640 $23.000
REMOVE CONDUCTOR
LF 30,000.000 $0.600 $1.000 $0.450 $0.550
REPLACE TRAY CABLE
LF 10,000.000 $1.510 $0.250 $3.700 $3.250
INSTALL ELECTRICAL SPLICE
EA 2,000.000 $69.400 $25.000 $38.450 $75.000
ROAD BORE
LF 2,000.000 $17.680 $16.000 $26.650 $34.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 100.000 $3,614.880 $4,000.000 $7,405.000 $8,659.000
REPLACE UNDERPASS LUMINAIRE (LED)
EA 50.000 $427.640 $500.000 $981.000 $1,160.000
REPLACE LUMINAIRE FIXTURE (LED)
EA 350.000 $371.730 $400.000 $560.000 $655.000
REPLACE HIGH MAST LUMINAIRES
EA 35.000 $352.680 $1.000 $1,044.700 $1,428.000
REPLACE LUMINAIRE ARMS
EA 5.000 $681.330 $1.000 $862.000 $1,089.000
SCHEDULE PREV MAINT (HIGH MAST ASSM)
EA 500.000 $465.900 $400.000 $500.000 $1,255.000
REPLACE TIMBER SERVICE POLE
EA 5.000 $545.470 $500.000 $1,641.000 $1,226.000
INSTALL GROUND BOX W/APRON
EA 45.000 $918.030 $575.000 $1,028.000 $1,226.000
INSTALL FOUNDATION
EA 20.000 $1,820.540 $1,200.000 $207.000 $1,589.000
REMOVE FOUNDATION
EA 20.000 $413.140 $200.000 $1,379.000 $440.000
REPLACE TRANSFORMER BASE
EA 20.000 $729.230 $300.000 $1,208.000 $1,356.000
REPLACE TRANSFORMER BASE COVER
EA 30.000 $49.790 $5.000 $145.000 $208.000
REPLACE HAND HOLE COVER
EA 15.000 $47.340 $5.000 $150.000 $214.000
INSTALL GROUND ROD
EA 5.000 $45.980 $25.000 $90.000 $93.000
REPLACE FUSED DISCONNECT
EA 20.000 $509.640 $25.000 $887.000 $900.000
REPLACE FUSE
EA 2,000.000 $41.850 $25.000 $23.000 $39.000
REPLACE BREAKAWAY FUSE HOLDER
EA 500.000 $88.770 $50.000 $72.000 $93.000
REPLACE CONTROL TRANS (HIGH MAST)
EA 5.000 $185.270 $150.000 $718.000 $726.000
REPLACE CONTROL TRANS (ELECT SERVICE)
EA 1.000 $200.880 $65.000 $718.000 $720.000
REPLACE AVIATION WARNING FIXTURE
EA 80.000 $277.120 $50.000 $468.000 $661.000
REPLACE AVIATION WARNING LAMP
EA 200.000 $63.790 $20.000 $291.000 $440.000
REPLACE HAND-OFF-AUTO SWITCH
EA 25.000 $136.200 $50.000 $181.000 $516.000
REPLACE CONTACTOR
EA 20.000 $209.600 $50.000 $269.000 $583.000
REPLACE METER BASE
EA 5.000 $285.200 $25.000 $1,230.000 $621.000
REPLACE CIRCUIT BREAKER
EA 30.000 $194.960 $100.000 $105.000 $149.000
REPLACE FLEX POWER CABLE OR CORD
LF 400.000 $4.650 $1.000 $12.730 $8.670
REPLACE TWIST LOCK CONNECTOR
EA 80.000 $220.310 $150.000 $376.000 $337.000
REPLACE SAFETY LANYARD
LF 25.000 $234.200 $1.000 $500.000 $8.100
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 500.000 $231.540 $1.000 $140.000 $330.000
REPLACE PHOTOCELL
EA 100.000 $40.300 $25.000 $61.000 $144.000
INSTALL SAFETY SWITCH
EA 7.000 $274.950 $25.000 $782.000 $713.000
REPLACE HIGH MAST WINCH
EA 2.000 $1,161.500 $1,000.000 $6,942.000 $6,509.000
REPLACE WIRE ROPE PULLEY
EA 50.000 $702.160 $50.000 $500.000 $525.000
REPLACE ELECTRICAL CABLE PULLEY
EA 2.000 $686.330 $100.000 $500.000 $518.000
INSTALL CONTROL TRANS (HIGH MAST)
EA 2.000 $441.910 $150.000 $718.000 $836.000
REPLACE HIGH MAST LUMINAIRES (LED)
EA 25.000 $1,044.900 $500.000 $976.000 $1,428.000
INSTL HIGH MAST FIXTURE (LED)
EA 500.000 $1,074.160 $850.000 $991.000 $1,208.000
REMOVE HIGH MAST ILLUM FIXTURE
EA 100.000 $50.000 $50.000 $75.000 $55.000
INSTALL LED SHIELDS
EA 100.000 $174.910 $250.000 $228.000 $237.000
INSTALL AVIATION WARNING FIXTURE (LED)
EA 100.000 $383.330 $200.000 $455.000 $276.000
LED SHIELDS FOR HIGH MAST FIXTURES
EA 100.000 $231.910 $125.000 $433.000 $237.000
REPLACE AVIATION WARNING FIXTURE (LED)
EA 300.000 $300.000 $50.000 $463.000 $303.000
REMOVE LED SHIELDS
EA 100.000 $125.000 $50.000 $30.000 $83.000
REMOVE HPS SHIELDS
EA 50.000 $125.000 $50.000 $37.000 $55.000
SCHED PREVENT MAINT (ILLUM SYS)
EA 400.000 $500.000 $250.000 $107.000 $1,294.000
ALUMINUM ELECTRICAL COND (#4 XHHW)
LF 80,000.000 $1.820 $3.000 $2.000 $2.300
TMA (STATIONARY)
DAY 5.000 $389.500 $1,500.000 $442.000 $220.000
TMA (MOBILE OPERATION)
DAY 48.000 $235.450 $750.000 $540.000 $220.000
Totals: $3,003,589.360 $2,277,980.000 $3,823,923.500 $5,311,543.500