Show Job Controls
Bid Cobra

HARRIS IH0610 (6418-65-001)

Items: 180

County: HARRIS
Length: 0.0100 MILES
Highway: IH0610
District: HOUSTON
Control Number: 6418-65-001
DBE Goal: N/A
Project: RMC - A00190666
Guaranty: $100,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $8,414,516.50
Date: 06/04/2025 (1 year ago) Changed
Contract Number: 6254004
Type: TOTAL MAINTENANCE
Project ID: A00190666
Project Description: GENERAL MAINTENANCE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMAL ELAHI
VANESSA BOSQUES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,414,516.50
$7,981,348.60
Over/Under Est: -5.15% -$433,167.90
$9,290,684.57
Over/Under Est: 10.41% $876,168.07
Amt Left: 16.4% $1,309,335.97
Over/Under Est: 39.91% $3,358,348.50
Amt Left: 47.5% $3,791,516.40
Delta: -26.72% -$2,482,180.43
Subcontractor Percentage Amount
REPUBLIC TRAFFIC SAFETY, INC. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

180 Total 0 of 180
HARRIS  |  IH0610  |  HOUSTON  |  6418-65-001  |  06/04/2025  |  $8,414,516.50  |  RMC - A00190666  |  TOTAL MAINT  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAZMAT INTERNATIONAL, INC.
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
BLADING
STA 100.000 $200.000 $200.000 $280.000 $350.000
BLADING
LF 50,000.000 $1.300 $0.250 $1.500 $2.000
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 15.000 $500.000 $200.000 $1,260.000 $3,000.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 40.000 $125.000 $50.000 $85.000 $300.000
CONC STR REPAIR (STANDARD)
SF 50.000 $150.000 $50.000 $85.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $300.000 $150.000 $300.000 $1,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 10,000.000 $32.000 $32.000 $23.000 $70.000
CLEANING EXISTING JOINTS
LF 10,000.000 $15.000 $15.000 $17.000 $30.000
MOBILIZATION (CALLOUT)
EA 100.000 $250.000 $1.000 $350.000 $100.000
MOBILIZATION (EMERGENCY)
EA 150.000 $600.000 $1,000.000 $700.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 365.000 $75.000 $25.000 $250.000 $200.000
TMA (STATIONARY)
DAY 750.000 $150.000 $300.000 $200.000 $200.000
TMA (MOBILE OPERATION)
DAY 750.000 $150.000 $300.000 $315.000 $200.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 150.000 $26.000 $26.000 $19.600 $50.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 2,400.000 $3.000 $20.000 $3.000 $20.000
PORT CTB (STKPL)(SAFETY SH)(TY 2)
LF 150.000 $26.000 $26.000 $19.600 $50.000
LANDSCAPE PAVERS
SY 100.000 $40.000 $1.500 $35.000 $100.000
REMOVE AND RELAY PAVERS
SY 100.000 $24.000 $1.000 $17.500 $100.000
CONC CURB (DOWELED)
LF 50.000 $18.000 $5.000 $14.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,800.000 $1,800.000 $2,000.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,800.000 $1,800.000 $1,800.000 $2,750.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $10.000 $100.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $20.000 $20.000 $25.000 $50.000
CHAIN LINK FENCE (REPAIR) (6')
LF 500.000 $15.000 $25.000 $20.000 $50.000
CHAIN LINK FENCE (INSTALL) (8')
LF 300.000 $24.000 $20.000 $18.200 $50.000
CHAIN LINK FENCE (REMOVE)
LF 500.000 $1.000 $1.000 $3.000 $50.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $800.000 $800.000 $1,700.000 $3,000.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 1.000 $800.000 $1.000 $1,000.000 $3,000.000
GATE (INSTALL)(6'X16')
EA 1.000 $800.000 $800.000 $1,758.770 $3,000.000
GATE (REMOVE)
EA 1.000 $150.000 $1.000 $105.000 $5,000.000
GATE (INSTALL)(6'X24')
EA 1.000 $1,200.000 $300.000 $1,750.000 $5,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 5.000 $1,500.000 $1,000.000 $2,100.000 $3,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 5.000 $1,500.000 $1,000.000 $2,100.000 $3,000.000
RELOCATE BRDG MNT CLEARANCE SGN ASSM
EA 5.000 $1,500.000 $250.000 $1,833.890 $3,000.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 5.000 $1,500.000 $250.000 $1,833.890 $3,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 50.000 $100.000 $100.000 $75.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 15,000.000 $7.000 $7.000 $6.000 $7.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 1,000.000 $10.000 $1.000 $25.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 5,000.000 $7.000 $7.000 $6.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 10,000.000 $7.000 $7.500 $26.670 $8.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 1,000.000 $10.000 $1.000 $13.000 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 5,000.000 $1.000 $1.500 $1.570 $1.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 40,000.000 $2.000 $2.150 $2.090 $1.300
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 5,000.000 $5.000 $5.500 $5.220 $4.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 20,000.000 $5.000 $6.050 $5.790 $4.050
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 20,000.000 $6.000 $7.250 $7.460 $7.050
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 400.000 $200.000 $210.000 $214.000 $155.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 200.000 $255.000 $260.000 $245.310 $170.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 50.000 $235.000 $250.000 $234.870 $160.000
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 25.000 $310.000 $250.000 $234.870 $200.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 50.000 $400.000 $100.000 $234.870 $155.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 200.000 $210.000 $220.000 $208.780 $225.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 50.000 $1,600.000 $1,700.000 $1,565.820 $1,100.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 50.000 $1,600.000 $1,700.000 $1,565.820 $1,100.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 10.000 $275.000 $100.000 $730.720 $500.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 5,000.000 $1.400 $2.100 $2.040 $2.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 10,000.000 $3.200 $3.550 $3.600 $3.050
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 100,000.000 $1.200 $1.500 $1.250 $1.250
RE PM TY II (W) 18" (YLD TRI)
EA 500.000 $35.000 $20.000 $46.970 $15.000
RE PM TY II (W) 36" (YLD TRI)
EA 250.000 $50.000 $70.000 $67.850 $30.000
PAVEMENT SLER 6"
LF 405,000.000 $0.050 $0.060 $0.010 $0.110
PAVEMENT SLER 8"
LF 45,000.000 $0.100 $0.170 $0.160 $0.220
PAVEMENT SLER 12"
LF 35,000.000 $0.200 $0.250 $0.260 $0.550
PAVEMENT SLER 24"
LF 20,000.000 $0.200 $0.450 $0.260 $1.100
PAVEMENT SLER (ARROW)
EA 400.000 $5.000 $6.000 $5.220 $15.000
PAVEMENT SLER (WORD)
EA 200.000 $5.000 $6.000 $5.220 $15.000
PAVEMENT SLER (DBL ARROW)
EA 200.000 $5.000 $6.000 $5.220 $19.000
PAVEMENT SLER (UTURN ARROW)
EA 50.000 $5.000 $11.000 $10.440 $27.000
PAVEMENT SLER (LN REDUCT ARROW)
EA 50.000 $5.000 $5.000 $10.440 $27.000
PAVEMENT SLER (U-L ARROW)
EA 25.000 $5.000 $11.000 $10.440 $27.000
PAVEMENT SLER (ENTR GORE)
EA 50.000 $5.000 $11.000 $10.440 $100.000
PAVEMENT SLER (EXIT GORE)
EA 50.000 $5.000 $11.000 $10.440 $185.000
PAVEMENT SLER (RR XING)
EA 10.000 $5.000 $5.000 $10.440 $49.000
PAVEMENT SLER (YLD TRI)
EA 750.000 $5.000 $10.000 $5.220 $3.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 100,000.000 $1.150 $1.200 $1.100 $1.100
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 100,000.000 $1.150 $1.200 $1.100 $1.100
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 100,000.000 $1.150 $1.200 $1.100 $1.100
PREFAB PM TY C (MULTI)(SHIELD)
EA 30.000 $3,800.000 $4,000.000 $3,131.650 $3,550.000
REFL PAV MRKR TY I-R
EA 1,400.000 $8.000 $8.000 $7.830 $10.000
REFL PAV MRKR TY II-A-A
EA 250.000 $7.000 $7.000 $6.260 $10.000
REFL PAV MRKR TY II-C-R
EA 2,500.000 $15.000 $15.000 $6.260 $15.000
ELIM EXT PM & MRKS (6")
LF 40,500.000 $0.260 $0.350 $0.370 $0.350
ELIM EXT PM & MRKS (8")
LF 45,000.000 $0.350 $0.650 $0.680 $0.600
ELIM EXT PM & MRKS (12")
LF 35,000.000 $1.000 $1.250 $1.300 $1.550
ELIM EXT PM & MRKS (24")
LF 20,000.000 $2.000 $3.000 $3.130 $2.550
ELIM EXT PM & MRKS (ARROW)
EA 400.000 $50.000 $85.000 $78.290 $100.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 200.000 $50.000 $80.000 $78.290 $50.000
ELIM EXT PM & MRKS (UTURN ARROW)
EA 50.000 $50.000 $75.000 $78.290 $100.000
ELIM EXT PM & MRKS (UTRN/LT ARR)
EA 25.000 $55.000 $75.000 $78.290 $55.000
ELIM EXT PM & MRKS (WORD)
EA 200.000 $50.000 $75.000 $78.290 $120.000
ELIM EXT PM & MRKS (ENTR GORE)
EA 50.000 $200.000 $200.000 $208.780 $200.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 50.000 $200.000 $200.000 $208.780 $200.000
ELIM EXT PM & MRKS (RR XING)
EA 10.000 $50.000 $100.000 $104.390 $200.000
ELIM EXT PM & MRKS (SHIELD)
EA 30.000 $60.000 $15.000 $260.970 $200.000
PAV SURF PREP FOR MRK (6")
LF 405,000.000 $0.200 $0.200 $0.010 $0.050
PAV SURF PREP FOR MRK (8")
LF 45,000.000 $0.020 $0.090 $0.080 $0.100
PAV SURF PREP FOR MRK (12")
LF 35,000.000 $0.120 $0.120 $0.130 $0.300
PAV SURF PREP FOR MRK (24")
LF 20,000.000 $0.080 $0.240 $0.250 $0.350
PAV SURF PREP FOR MRK (ARROW)
EA 400.000 $10.000 $10.000 $5.220 $20.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 200.000 $10.000 $10.000 $5.220 $20.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 50.000 $10.000 $6.000 $5.220 $50.000
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 25.000 $10.000 $6.000 $5.220 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 200.000 $10.000 $10.000 $5.220 $50.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 50.000 $10.000 $25.000 $26.100 $100.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 50.000 $10.000 $25.000 $26.100 $100.000
PAV SURF PREP FOR MRK (RR XING)
EA 10.000 $10.000 $10.000 $10.440 $100.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 500.000 $10.000 $5.000 $5.220 $10.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 250.000 $4.000 $5.000 $5.220 $10.000
PAV SURF PREP FOR MRK (SHIELD)
EA 30.000 $15.000 $100.000 $104.390 $20.000
POTHOLE REPAIR (STANDARD)
LB 10,000.000 $4.000 $6.000 $7.000 $10.000
SPOT MOWING
AC 250.000 $285.000 $25.000 $300.000 $150.000
BROADCAST APPLICATION
MI 200.000 $1,000.000 $10.000 $500.000 $500.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 300.000 $150.000 $400.000 $330.000 $700.000
LITTER REMOVAL (SPOT)
AC 150.000 $30.000 $10.000 $30.000 $100.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 100.000 $75.000 $150.000 $300.000 $750.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $200.000 $200.000 $140.000 $400.000
CLEANING / SWEEPING (HANDWORK)
SY 750,000.000 $0.550 $0.050 $0.450 $0.500
GRAFFITI REMOVAL (ABRASIVE CLEAN)
SF 5,000.000 $1.200 $3.000 $1.200 $10.000
GRAFFITI REMOVAL (PAINTING)
SF 250,000.000 $0.800 $3.000 $0.900 $1.000
TREE TRIMMING / BRUSH REMOVAL
MI 50.000 $1,000.000 $750.000 $1,000.000 $2,000.000
TREE REMOVAL (4" - 12" DIA)
EA 250.000 $130.000 $100.000 $175.000 $150.000
TREE REMOVAL (12" - 18" DIA)
EA 75.000 $150.000 $100.000 $250.000 $200.000
TREE REMOVAL (18" - 24" DIA)
EA 5.000 $200.000 $50.000 $250.000 $300.000
TREE REMOVAL (24" - 30" DIA)
EA 5.000 $400.000 $50.000 $350.000 $300.000
TREE REMOVAL (30" - 36" DIA)
EA 10.000 $500.000 $50.000 $525.000 $300.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $1,000.000 $25.000 $1,000.000 $300.000
TREE REMOVAL (42" - 48" DIA)
EA 1.000 $1,000.000 $25.000 $700.000 $300.000
TREE REMOVAL (48" - 60" DIA)
EA 1.000 $1,000.000 $25.000 $840.000 $300.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 500.000 $5.250 $1.000 $6.250 $25.000
DRAIN INLET CLEANING
EA 1,000.000 $32.000 $32.000 $32.000 $75.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 10,000.000 $15.000 $10.000 $18.000 $15.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $1.000 $1.000 $16.800 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 50.000 $1.000 $1.000 $50.000 $500.000
REPLACE TIMBER POST W/O CONC FND
EA 450.000 $50.000 $32.000 $40.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 200.000 $30.000 $32.000 $110.070 $125.000
REPLACE TIMBER POST W/ CONC FND
EA 300.000 $80.000 $75.000 $110.000 $125.000
REPLACE STEEL POST W/ CONC FND
EA 300.000 $30.000 $75.000 $149.200 $150.000
REALIGN POSTS
EA 200.000 $10.000 $10.000 $8.000 $100.000
REM OBSOLETE GET & REPL W/ SGT
EA 30.000 $3,400.000 $2,200.000 $3,700.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $75.000 $900.000 $1,300.000 $2,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,500.000 $22.000 $30.000 $35.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $35.000 $40.000 $45.000 $1.000
RESET SGT IMPACT HEAD
EA 30.000 $75.000 $75.000 $275.000 $1,000.000
REPLACE SGT OBJECT MARKER
EA 150.000 $22.000 $50.000 $27.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $100.000 $100.000 $155.000 $200.000
REPLACE SGT STRUT
EA 40.000 $120.000 $120.000 $100.000 $200.000
RAISE RAIL
LF 2,000.000 $12.000 $5.000 $16.670 $20.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $630.000 $1,800.000 $1,611.750 $4,000.000
REPLACE SINGLE GDRAIL TERM POST (WOOD)
EA 350.000 $35.000 $35.000 $139.390 $100.000
REPLACE SINGLE GDRAIL TERM POST (STEEL)
EA 150.000 $35.000 $35.000 $186.290 $150.000
REMOVE (SMTC) NARROW
EA 20.000 $2,500.000 $0.100 $397.030 $5,000.000
REPLACE (SMTC) NARROW
EA 20.000 $26,000.000 $26,000.000 $28,000.000 $25,000.000
REPAIR (SMTC) NARROW
LF 500.000 $150.000 $200.000 $56.000 $500.000
REMOVE (SMTC) WIDE
EA 20.000 $1,000.000 $0.100 $397.030 $5,000.000
REPLACE (SMTC) WIDE
EA 20.000 $47,000.000 $35,000.000 $34,000.000 $35,000.000
REPAIR (SMTC) WIDE
LF 500.000 $190.000 $200.000 $80.000 $600.000
REMOVE (REACT) WIDE
EA 1.000 $28,000.000 $0.100 $397.030 $5,000.000
REPLACE (REACT) WIDE
EA 1.000 $45,000.000 $250.000 $42,896.720 $45,000.000
REPAIR (REACT) WIDE
LF 100.000 $45.000 $100.000 $165.070 $350.000
REPAIR (REACT)(N)
LF 100.000 $25.500 $100.000 $514.270 $350.000
REPAIR (REACT)(N)(CYLINDER ONLY)
EA 15.000 $2,000.000 $1.000 $2,100.000 $2,000.000
REPAIR (REACT)(W)(CYLINDER ONLY)
EA 15.000 $2,500.000 $1.000 $3,000.000 $2,000.000
SNOW AND ICE CONTROL (TRUCK)
HR 1,000.000 $130.000 $10.000 $75.000 $175.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,000.000 $60.000 $125.000 $50.000 $150.000
SNOW AND ICE CONTROL (LOADER)
HR 50.000 $80.000 $1.000 $75.000 $500.000
SNOW AND ICE CONTROL (SEASON)
MO 4.000 $50,000.000 $40,000.000 $75,000.000 $100,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 1,000.000 $200.000 $100.000 $250.000 $250.000
REPAIR LARGE RDSD SIGN SUPT & ASSEM
EA 50.000 $1,300.000 $1,000.000 $2,200.000 $1,000.000
RELOCATE LARGE RDSD SIGN SUPT & ASSEM
EA 50.000 $120.000 $25.750 $2,200.000 $1,000.000
REPLACE LARGE RDSD SIGN SUPT & ASSEM
EA 50.000 $875.000 $500.000 $4,000.000 $6,000.000
REMOVE LARGE RDSD SIGN SUPT & ASSEM
EA 10.000 $300.000 $250.000 $500.000 $1,000.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 1,000.000 $142.900 $300.000 $500.000 $75.000
RELOCATE SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $100.330 $25.000 $280.000 $100.000
REPLACE SMALL RDSD SIGN SUPT & ASSEM
EA 1,000.000 $346.670 $442.500 $550.000 $500.000
REMOVE SMALL RDSD SIGN SUPT & ASSEM
EA 200.000 $300.000 $25.750 $150.000 $100.000
DELINEATOR/OBJECT MARKER CLEANING
EA 5,000.000 $12.000 $2.500 $1.760 $50.000
REFLECTORS/REFLECTIVE TAPE TAPE INSTALL
EA 1,000.000 $12.000 $0.100 $7.500 $100.000
SIGN CLEANING
EA 2,000.000 $22.000 $5.000 $5.880 $100.000
SIGN STRAIGHTENING
EA 250.000 $18.000 $300.000 $17.650 $350.000
BRINE SOLUTION(DEL)(SITE 1)
GAL 1,000,000.000 $0.500 $0.200 $0.180 $0.500
Totals: $8,414,516.500 $7,981,348.600 $9,290,684.570 $11,772,865.000