REMOVING CONC (CURB)
|
LF
|
50.000
|
$2.500
|
$2.000
|
$10.000
|
|
|
BLADING
|
STA
|
450.000
|
$77.500
|
$0.400
|
$150.000
|
|
|
BLADING
|
LF
|
50,000.000
|
$4.500
|
$1.000
|
$1.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
500.000
|
$35.000
|
$54.000
|
$73.000
|
|
|
FULL - DEPTH REPAIR CRCP (7")
|
SY
|
20.000
|
$315.000
|
$321.000
|
$620.000
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
20.000
|
$280.000
|
$332.000
|
$635.000
|
|
|
FULL - DEPTH REPAIR CRCP (9")
|
SY
|
160.000
|
$214.000
|
$300.000
|
$665.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
30.000
|
$287.000
|
$450.000
|
$685.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
50.000
|
$321.000
|
$500.000
|
$710.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
25.000
|
$332.500
|
$525.000
|
$720.000
|
|
|
FULL - DEPTH REPAIR CRCP (15")
|
SY
|
25.000
|
$355.500
|
$550.000
|
$730.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
500.000
|
$120.000
|
$68.000
|
$185.000
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
40.000
|
$117.500
|
$68.000
|
$195.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
50.000
|
$195.000
|
$64.000
|
$175.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$475.000
|
$530.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
75.000
|
$345.000
|
$447.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
125.000
|
$20.500
|
$21.600
|
$50.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
500.000
|
$6.500
|
$16.700
|
$20.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
24.000
|
$250.000
|
$69.400
|
$500.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
150.000
|
$250.000
|
$180.000
|
$500.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
1.000
|
$2,000.000
|
$4,298.000
|
$3,000.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
1.000
|
$5,190.000
|
$2,855.000
|
$3,000.000
|
|
|
INLET (STG II)(TY C)
|
EA
|
1.000
|
$1,190.000
|
$2,966.000
|
$3,000.000
|
|
|
MANH (STG II)(TY A)
|
EA
|
1.000
|
$1,190.000
|
$3,743.000
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$300.000
|
$311.000
|
$1,000.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$235.000
|
$443.000
|
$1,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
100.000
|
$250.000
|
$250.000
|
$500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
100.000
|
$250.000
|
$550.000
|
$1,000.000
|
|
|
PORT CTB (DES SOURCE)(SAFETY SH)
|
LF
|
150.000
|
$17.500
|
$22.920
|
$20.000
|
|
|
PORT CTB (MOVE)(SAFETY SH)
|
LF
|
2,400.000
|
$25.000
|
$1.980
|
$7.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
150.000
|
$15.000
|
$22.900
|
$5.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
150.000
|
$62.000
|
$138.000
|
$80.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
200.000
|
$40.000
|
$109.000
|
$40.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
50.000
|
$10.750
|
$4.900
|
$25.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
50.000
|
$10.750
|
$4.900
|
$25.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
50.000
|
$8.750
|
$143.000
|
$45.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
50.000
|
$11.750
|
$8.300
|
$45.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
50.000
|
$62.500
|
$129.000
|
$65.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,750.000
|
$5,000.000
|
$3,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$1,825.000
|
$5,000.000
|
$3,500.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,549.000
|
$2,400.000
|
$2,050.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,100.000
|
$1,574.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
50.000
|
$1.000
|
$1.000
|
$3.500
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
500.000
|
$18.000
|
$25.000
|
$15.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
1,000.000
|
$17.500
|
$16.000
|
$15.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
500.000
|
$2.430
|
$1.000
|
$2.500
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$635.000
|
$772.000
|
$2,000.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$635.000
|
$437.000
|
$750.000
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$185.000
|
$167.000
|
$500.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
300.000
|
$35.000
|
$25.000
|
$17.500
|
|
|
GATE (INSTALL)(SINGLE)(6' X 24')
|
EA
|
1.000
|
$925.000
|
$1,080.000
|
$1,500.000
|
|
|
GATE (INSTALL)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$1,350.000
|
$978.000
|
$2,000.000
|
|
|
GATE (REPAIR)(SINGLE)(6' X 24')
|
EA
|
1.000
|
$655.000
|
$509.000
|
$1,000.000
|
|
|
GATE (REPAIR)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$655.000
|
$509.000
|
$1,250.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
5,000.000
|
$20.000
|
$20.000
|
$37.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,000.000
|
$23.000
|
$20.000
|
$37.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
65.000
|
$18.000
|
$20.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
100.000
|
$75.000
|
$108.670
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1,000.000
|
$12.000
|
$3.950
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
1,000.000
|
$13.000
|
$36.240
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,000.000
|
$9.750
|
$3.950
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
1,000.000
|
$13.000
|
$13.240
|
$10.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,500.000
|
$0.610
|
$1.650
|
$1.680
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
2,500.000
|
$0.940
|
$1.850
|
$1.890
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
25,000.000
|
$0.940
|
$0.970
|
$0.990
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
20,000.000
|
$2.650
|
$2.420
|
$2.470
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
20,000.000
|
$2.640
|
$3.400
|
$3.470
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
10,000.000
|
$4.170
|
$6.790
|
$6.930
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
300.000
|
$132.500
|
$154.350
|
$157.500
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
100.000
|
$136.050
|
$216.090
|
$220.500
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
50.000
|
$127.000
|
$205.800
|
$210.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
25.000
|
$121.500
|
$205.800
|
$210.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
10.000
|
$121.500
|
$205.800
|
$210.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
150.000
|
$131.000
|
$154.350
|
$157.500
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
18.000
|
$520.000
|
$750.000
|
$630.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
18.000
|
$520.000
|
$750.000
|
$630.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
20.000
|
$384.000
|
$463.050
|
$472.500
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$122.500
|
$154.350
|
$157.500
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
1.000
|
$50.500
|
$87.470
|
$89.250
|
|
RFL PAV MRK TY I(W)BIKE RR XING(100MIL)
|
EA
|
1.000
|
$50.500
|
$87.470
|
$89.250
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
1.000
|
$50.500
|
$87.470
|
$89.250
|
|
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
|
EA
|
1.000
|
$50.500
|
$87.470
|
$89.250
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
1.000
|
$50.510
|
$10.290
|
$10.500
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
4,500.000
|
$0.760
|
$1.000
|
$0.790
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
5,000.000
|
$1.930
|
$2.830
|
$2.890
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
500.000
|
$5.190
|
$5.400
|
$5.510
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
5,000.000
|
$0.910
|
$2.000
|
$0.950
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
50.000
|
$22.500
|
$20.580
|
$21.000
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
50.000
|
$38.750
|
$25.730
|
$26.250
|
|
|
PAVEMENT SEALER 6"
|
LF
|
37,500.000
|
$0.050
|
$0.130
|
$0.140
|
|
|
PAVEMENT SEALER 8"
|
LF
|
32,000.000
|
$0.090
|
$0.140
|
$0.150
|
|
|
PAVEMENT SEALER 12"
|
LF
|
45,000.000
|
$0.170
|
$0.660
|
$0.670
|
|
|
PAVEMENT SEALER 24"
|
LF
|
10,500.000
|
$0.320
|
$1.320
|
$1.340
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
300.000
|
$6.330
|
$39.100
|
$39.900
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
150.000
|
$6.300
|
$39.100
|
$39.900
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
100.000
|
$8.910
|
$51.450
|
$52.500
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
50.000
|
$8.650
|
$51.450
|
$52.500
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
10.000
|
$6.300
|
$77.180
|
$78.750
|
|
|
PAVEMENT SEALER (U-L ARROW)
|
EA
|
25.000
|
$6.120
|
$87.470
|
$89.250
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
18.000
|
$45.000
|
$97.760
|
$99.750
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
18.000
|
$43.500
|
$97.760
|
$99.750
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$6.120
|
$66.890
|
$68.250
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
20.000
|
$43.500
|
$133.770
|
$136.500
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
100.000
|
$6.120
|
$22.640
|
$23.100
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
1.000
|
$6.120
|
$39.100
|
$39.900
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
1.000
|
$6.120
|
$39.100
|
$39.900
|
|
|
PAVEMENT SEALER (BIKE WORD)
|
EA
|
1.000
|
$6.120
|
$39.100
|
$39.900
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
10,000.000
|
$0.700
|
$1.000
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
20,000.000
|
$1.020
|
$1.000
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.710
|
$0.620
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
20,000.000
|
$1.120
|
$1.000
|
$1.500
|
|
|
PAVEMENT SEALER (BIKE RRX)
|
EA
|
1.000
|
$6.150
|
$113.130
|
$115.440
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
8.000
|
$1,000.000
|
$2,572.510
|
$2,625.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
10.000
|
$6.000
|
$5.150
|
$5.250
|
|
REFL PAV MRKR TY I-R
|
EA
|
2,000.000
|
$4.770
|
$5.150
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,750.000
|
$4.750
|
$5.150
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,550.000
|
$4.790
|
$5.600
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
37,500.000
|
$0.200
|
$0.360
|
$0.370
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
32,000.000
|
$0.290
|
$0.640
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
45,000.000
|
$0.690
|
$1.290
|
$1.310
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
10,500.000
|
$1.380
|
$2.570
|
$2.630
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
300.000
|
$14.020
|
$56.600
|
$57.750
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
100.000
|
$21.300
|
$87.470
|
$89.250
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
150.000
|
$14.090
|
$226.380
|
$57.750
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
18.000
|
$127.500
|
$226.380
|
$231.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
18.000
|
$127.500
|
$257.250
|
$231.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
20.000
|
$22.000
|
$128.630
|
$231.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$24.620
|
$128.630
|
$131.250
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
8.000
|
$2.000
|
$51.450
|
$131.250
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
|
EA
|
1.000
|
$5.020
|
$51.450
|
$52.500
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE RR XING)
|
EA
|
1.000
|
$5.020
|
$51.450
|
$52.500
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
|
EA
|
1.000
|
$5.020
|
$51.450
|
$52.500
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE WORD)
|
EA
|
1.000
|
$5.020
|
$51.450
|
$52.500
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE DOT)
|
EA
|
1.000
|
$5.020
|
$2.060
|
$52.500
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
50.000
|
$13.620
|
$87.470
|
$52.500
|
|
|
ELIM EXT PAV MRK & MRKS (UTRN/LT ARR)
|
EA
|
25.000
|
$13.620
|
$87.470
|
$52.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
37,500.000
|
$0.150
|
$0.020
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
32,000.000
|
$0.100
|
$0.020
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
45,000.000
|
$0.190
|
$0.260
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
10,500.000
|
$0.250
|
$0.510
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
300.000
|
$6.360
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
100.000
|
$6.330
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
50.000
|
$6.300
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
25.000
|
$6.360
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
150.000
|
$6.330
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
18.000
|
$34.490
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
18.000
|
$34.820
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
20.000
|
$33.000
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
50.000
|
$6.120
|
$5.150
|
$5.250
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
50.000
|
$6.120
|
$5.150
|
$5.250
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
8.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
1.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (BIKE RR XING)
|
EA
|
1.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
1.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (BIKE WORD)
|
EA
|
1.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (BIKE DOT)
|
EA
|
1.000
|
$5.050
|
$10.290
|
$10.500
|
|
|
POTHOLE REPAIR (STANDARD)
|
LB
|
20,000.000
|
$6.000
|
$4.500
|
$5.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
2,000.000
|
$2.400
|
$2.500
|
$5.000
|
|
|
SPOT MOWING
|
AC
|
500.000
|
$53.800
|
$10.000
|
$85.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
385.400
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
244.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
60.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
60.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
120.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
1,080.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (7)
|
AC
|
32.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (8)
|
AC
|
528.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (9)
|
AC
|
21.600
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (12)
|
AC
|
1,560.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
FULL - WIDTH MOWING - TRACT (14)
|
AC
|
72.000
|
$72.000
|
$94.000
|
$95.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
300.000
|
$250.000
|
$122.200
|
$400.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
150.000
|
$60.000
|
$30.000
|
$150.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
52.000
|
$1,750.000
|
$4,268.000
|
$1,494.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
52.000
|
$620.000
|
$794.000
|
$946.000
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
52.000
|
$570.000
|
$5,233.000
|
$233.000
|
|
|
LITTER REMOVAL - TRACT (4)
|
CYC
|
52.000
|
$570.000
|
$574.000
|
$233.000
|
|
|
LITTER REMOVAL - TRACT (5)
|
CYC
|
52.000
|
$550.000
|
$1,066.000
|
$465.000
|
|
|
LITTER REMOVAL - TRACT (6)
|
CYC
|
52.000
|
$3,400.000
|
$5,982.000
|
$4,185.000
|
|
|
LITTER REMOVAL - TRACT (7)
|
CYC
|
52.000
|
$550.000
|
$356.000
|
$124.000
|
|
|
LITTER REMOVAL - TRACT (8)
|
CYC
|
52.000
|
$1,750.000
|
$5,108.000
|
$2,046.000
|
|
|
LITTER REMOVAL - TRACT (9)
|
CYC
|
52.000
|
$510.000
|
$574.000
|
$84.000
|
|
|
LITTER REMOVAL - TRACT (10)
|
CYC
|
1.000
|
$540.000
|
$5,599.000
|
$1.000
|
|
|
LITTER REMOVAL - TRACT (11)
|
CYC
|
1.000
|
$625.000
|
$5,599.000
|
$1.000
|
|
|
LITTER REMOVAL - TRACT (12)
|
CYC
|
52.000
|
$9,250.000
|
$19,441.000
|
$6,045.000
|
|
|
LITTER REMOVAL - TRACT (14)
|
CYC
|
52.000
|
$1,750.000
|
$446.000
|
$279.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
150.000
|
$60.000
|
$50.000
|
$150.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
750,000.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
|
LS
|
1.000
|
$100,000.000
|
$50,000.000
|
$90,000.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
5,000.000
|
$2.000
|
$1.000
|
$2.500
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
200,000.000
|
$1.000
|
$0.850
|
$1.250
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
50.000
|
$1,700.000
|
$1,020.000
|
$2,750.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
500.000
|
$105.000
|
$166.000
|
$65.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
250.000
|
$130.000
|
$270.000
|
$85.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
10.000
|
$167.500
|
$270.000
|
$200.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
10.000
|
$167.500
|
$305.000
|
$250.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
10.000
|
$195.000
|
$555.000
|
$350.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
5.000
|
$300.000
|
$1,665.000
|
$450.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
1.000
|
$300.000
|
$3,884.000
|
$1,500.000
|
|
|
TREE REMOVAL (48" - 60" DIA)
|
EA
|
1.000
|
$475.000
|
$3,884.000
|
$2,500.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,000.000
|
$4.500
|
$4.400
|
$10.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
2,000.000
|
$66.000
|
$42.000
|
$65.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
44.000
|
$1,850.000
|
$1,805.000
|
$1,800.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
72.000
|
$325.000
|
$340.000
|
$500.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
250.000
|
$240.000
|
$115.000
|
$200.000
|
|
|
SUMP CLEANING
|
EA
|
52.000
|
$315.000
|
$292.000
|
$400.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
5,000.000
|
$3.900
|
$4.000
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
10,000.000
|
$4.800
|
$4.500
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
1,000.000
|
$5.750
|
$5.300
|
$8.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
1,000.000
|
$6.650
|
$6.400
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
100.000
|
$6.450
|
$7.400
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
100.000
|
$7.370
|
$9.600
|
$11.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
100.000
|
$10.750
|
$10.600
|
$12.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$12.000
|
$12.200
|
$13.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
100.000
|
$15.000
|
$15.400
|
$16.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
2,000.000
|
$4.500
|
$3.700
|
$7.500
|
|
|
STORM SEWER CLEAN X LRG PUMP STAT WELL
|
EA
|
16.000
|
$7,875.000
|
$7,961.000
|
$8,000.000
|
|
|
PUMP STATION WELL CLEANING (LARGE)
|
EA
|
20.000
|
$4,500.000
|
$4,777.000
|
$4,500.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
7,500.000
|
$16.500
|
$22.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
50.000
|
$7.500
|
$26.900
|
$35.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
125.000
|
$15.000
|
$41.600
|
$45.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
350.000
|
$34.500
|
$32.700
|
$70.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
300.000
|
$48.500
|
$89.300
|
$80.000
|
|
|
REALIGN POSTS
|
EA
|
200.000
|
$10.500
|
$5.400
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
4,500.000
|
$27.000
|
$28.900
|
$35.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$60.000
|
$35.800
|
$85.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
30.000
|
$2,850.000
|
$3,948.000
|
$3,800.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
100.000
|
$1,050.000
|
$1,125.000
|
$1,000.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$150.000
|
$107.000
|
$200.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
100.000
|
$109.000
|
$119.000
|
$85.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
100.000
|
$88.000
|
$91.000
|
$85.000
|
|
|
REPLACE SGT STRUT
|
EA
|
40.000
|
$62.000
|
$77.000
|
$50.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
200.000
|
$20.000
|
$22.200
|
$25.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$18,000.000
|
$30,387.000
|
$26,500.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$30,000.000
|
$46,650.000
|
$56,000.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
100.000
|
$1,100.000
|
$941.000
|
$1,000.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
15.000
|
$2,900.000
|
$3,329.000
|
$3,500.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
1.000
|
$1,500.000
|
$276.000
|
$1,000.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
25.000
|
$1,200.000
|
$831.000
|
$1,000.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
10.000
|
$2,900.000
|
$3,329.000
|
$3,500.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
5.000
|
$30,000.000
|
$38,573.000
|
$37,000.000
|
|
|
REPAIR TAU II (N)
|
LF
|
250.000
|
$320.000
|
$82.000
|
$150.000
|
|
|
REPAIR TAU II (W)
|
LF
|
250.000
|
$50.000
|
$82.000
|
$175.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
2.000
|
$2,500.000
|
$2,210.000
|
$3,500.000
|
|
|
REPAIR (SMTC) (W)
|
LF
|
500.000
|
$200.000
|
$214.000
|
$225.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
5.000
|
$20,000.000
|
$26,079.000
|
$24,500.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
LF
|
500.000
|
$200.000
|
$357.000
|
$150.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
2,000.000
|
$7.000
|
$5.800
|
$5.000
|
|
|
TYPE CAC CONCRETE
|
CY
|
2.000
|
$2,300.000
|
$5,000.000
|
$7,100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
400.000
|
$100.000
|
$94.000
|
$250.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
20.000
|
$650.000
|
$951.000
|
$750.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
5.000
|
$360.000
|
$973.000
|
$50.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$360.000
|
$263.000
|
$1,000.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
1,500.000
|
$258.000
|
$300.000
|
$500.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
50.000
|
$225.000
|
$263.000
|
$50.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
100.000
|
$85.000
|
$62.000
|
$50.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,000.000
|
$200.000
|
$50.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
4,000.000
|
$60.000
|
$10.000
|
$55.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
300.000
|
$9.500
|
$11.100
|
$10.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
1,000.000
|
$60.000
|
$59.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
1,000.000
|
$60.000
|
$37.000
|
$90.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
50.000
|
$60.000
|
$64.000
|
$120.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
4.000
|
$15,000.000
|
$50,000.000
|
$100,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
200.000
|
$45.000
|
$34.200
|
$100.000
|
|
|
BRINE SOLUTION (DEL)
|
GAL
|
100,000.000
|
$0.460
|
$0.750
|
$0.350
|
|
Totals: |
$7,109,463.090
|
$8,390,099.870
|
$8,979,399.890
|