Engineer's Estimate
$5,785,701.59
$7,086,132.00
Over/Under Est: 22.48% $1,300,430.41
Over/Under Est: 28.11% $1,626,605.21
Amt Left: 4.6% $326,174.80
Over/Under Est: 72.57% $4,198,798.41
Amt Left: 40.9% $2,898,368.00
Delta: -34.70% -$2,572,193.20

Bid Items & Bid Tabulations

217 Total 0 of 217
HARRIS  |  IH0610  |  HOUSTON  |  6391-00-001  |  06/02/2023  |  $5,785,701.59  |  RMC - 639100001  |  TOTAL MAINT  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
BLADING
STA 100.000 $77.500 $400.000 $150.000 $350.000
BLADING
LF 50,000.000 $4.500 $1.500 $1.500 $1.000
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 15.000 $50.000 $500.000 $750.000 $1,200.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 40.000 $117.500 $125.000 $175.000 $350.000
CONC STR REPAIR (STANDARD)
SF 50.000 $195.000 $150.000 $150.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $345.000 $300.000 $480.000 $750.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,000.000 $20.500 $32.000 $75.000 $75.000
CLEANING EXISTING JOINTS
LF 1,000.000 $6.500 $17.000 $10.000 $25.000
MOBILIZATION (CALLOUT)
EA 100.000 $250.000 $250.000 $3,000.000 $2,500.000
MOBILIZATION (EMERGENCY)
EA 100.000 $250.000 $600.000 $3,500.000 $1,000.000
PORT CTB (DES SOURCE)(SAFETY SH)
LF 150.000 $17.500 $28.000 $30.000 $50.000
PORT CTB (MOVE)(SAFETY SH)
LF 2,400.000 $25.000 $3.000 $15.000 $25.000
PORT CTB (STKPL)(SAFETY SH)
LF 150.000 $15.000 $28.000 $30.000 $50.000
LANDSCAPE PAVERS
SY 150.000 $62.000 $50.000 $50.000 $100.000
REMOVE AND RELAY PAVERS
SY 200.000 $40.000 $25.000 $30.000 $200.000
CONC CURB (DOWEL)
LF 50.000 $11.750 $20.000 $100.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,549.000 $2,000.000 $1,750.000 $5,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,100.000 $1,800.000 $1,500.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $1.000 $2.000 $2.880 $10.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $18.000 $20.000 $25.000 $50.000
CHAIN LINK FENCE (REPAIR) (6')
LF 500.000 $17.500 $15.000 $17.500 $15.000
CHAIN LINK FENCE (REMOVE)
LF 500.000 $2.430 $1.000 $5.000 $15.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $635.000 $1,000.000 $2,000.000 $2,500.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 1.000 $635.000 $1,000.000 $750.000 $2,000.000
GATE (REMOVE)
EA 1.000 $185.000 $185.000 $500.000 $1,500.000
CHAIN LINK FENCE (INSTALL) (8')
LF 300.000 $35.000 $26.000 $25.000 $75.000
GATE (INSTALL)(SINGLE)(6' X 24')
EA 1.000 $925.000 $1,100.000 $1,600.000 $5,000.000
GATE (INSTALL)(DOUBLE)(6' X 16')
EA 1.000 $1,350.000 $900.000 $2,000.000 $8,000.000
GATE (REPAIR)(SINGLE)(6' X 24')
EA 1.000 $655.000 $450.000 $750.000 $3,500.000
GATE (REPAIR)(DOUBLE)(6' X 16')
EA 1.000 $655.000 $450.000 $750.000 $6,000.000
ALUMINUM SIGNS (TY A)
SF 5,000.000 $20.000 $20.000 $30.000 $50.000
ALUMINUM SIGNS (TY G)
SF 2,000.000 $23.000 $20.000 $30.000 $40.000
ALUMINUM SIGNS (TY O)
SF 65.000 $18.000 $45.000 $75.000 $40.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 10.000 $500.000 $3,000.000 $2,400.000 $3,500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 10.000 $500.000 $3,000.000 $2,400.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 100.000 $75.000 $75.000 $150.000 $35.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,000.000 $12.000 $6.000 $9.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 1,000.000 $13.000 $35.000 $9.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $9.750 $6.000 $9.000 $250.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 1,000.000 $13.000 $13.000 $9.000 $20.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,500.000 $0.610 $1.650 $3.680 $3.000
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 2,500.000 $0.940 $1.000 $1.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 25,000.000 $0.940 $2.000 $1.320 $2.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 20,000.000 $2.650 $5.000 $2.630 $3.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 20,000.000 $2.640 $5.000 $4.200 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 10,000.000 $4.170 $8.000 $8.400 $12.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 300.000 $132.500 $200.000 $262.500 $250.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 100.000 $136.050 $200.000 $367.500 $275.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 50.000 $127.000 $150.000 $357.000 $325.000
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 25.000 $121.500 $150.000 $346.500 $500.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 10.000 $121.500 $150.000 $420.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 150.000 $131.000 $200.000 $315.000 $300.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $520.000 $750.000 $892.500 $1,000.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 18.000 $520.000 $750.000 $892.500 $1,000.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 20.000 $384.000 $400.000 $892.500 $1,000.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 1.000 $122.500 $125.000 $367.500 $2,500.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 1.000 $50.500 $150.000 $210.000 $2,000.000
RFL PAV MRK TY I(W)BIKE RR XING(100MIL)
EA 1.000 $50.500 $150.000 $210.000 $2,500.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 1.000 $50.500 $150.000 $210.000 $400.000
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
EA 1.000 $50.500 $150.000 $210.000 $500.000
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
EA 1.000 $50.510 $5.000 $10.500 $500.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 4,500.000 $0.760 $1.500 $2.100 $2.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 5,000.000 $1.930 $2.250 $4.200 $5.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 500.000 $5.190 $7.000 $8.400 $10.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,000.000 $0.910 $1.100 $1.320 $2.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 50.000 $22.500 $20.000 $26.250 $50.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 50.000 $38.750 $30.000 $68.250 $50.000
PAVEMENT SEALER 6"
LF 37,500.000 $0.050 $0.030 $0.110 $0.500
PAVEMENT SEALER 8"
LF 32,000.000 $0.090 $0.050 $0.110 $0.750
PAVEMENT SEALER 12"
LF 45,000.000 $0.170 $0.200 $0.530 $1.500
PAVEMENT SEALER 24"
LF 10,500.000 $0.320 $0.500 $1.050 $2.500
PAVEMENT SEALER (ARROW)
EA 300.000 $6.330 $10.000 $15.750 $75.000
PAVEMENT SEALER (WORD)
EA 150.000 $6.300 $10.000 $15.750 $200.000
PAVEMENT SEALER (DBL ARROW)
EA 100.000 $8.910 $10.000 $23.100 $100.000
PAVEMENT SEALER (UTURN ARROW)
EA 50.000 $8.650 $16.000 $34.650 $75.000
PAVEMENT SEALER (LNDP ARROW)
EA 10.000 $6.300 $16.000 $23.100 $250.000
PAVEMENT SEALER (U-L ARROW)
EA 25.000 $6.120 $20.000 $80.850 $250.000
PAVEMENT SEALER (ENTR GORE)
EA 18.000 $45.000 $33.000 $80.850 $250.000
PAVEMENT SEALER (EXIT GORE)
EA 18.000 $43.500 $33.000 $80.850 $500.000
PAVEMENT SEALER (SYMBOL)
EA 1.000 $6.120 $33.000 $69.300 $600.000
PAVEMENT SEALER (RR XING)
EA 20.000 $43.500 $5.000 $84.000 $100.000
PAVEMENT SEALER (YLD TRI)
EA 100.000 $6.120 $6.250 $8.400 $25.000
PAVEMENT SEALER (BIKE ARROW)
EA 1.000 $6.120 $20.000 $63.000 $1,000.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 1.000 $6.120 $20.000 $63.000 $1,000.000
PAVEMENT SEALER (BIKE WORD)
EA 1.000 $6.120 $20.000 $63.000 $1,000.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 10,000.000 $0.700 $1.100 $1.200 $1.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 20,000.000 $1.020 $1.150 $1.500 $1.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,000.000 $0.710 $1.000 $0.890 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 20,000.000 $1.120 $1.100 $1.500 $1.250
PAVEMENT SEALER (BIKE RRX)
EA 1.000 $6.150 $25.000 $157.500 $2,500.000
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 8.000 $1,000.000 $850.000 $2,625.000 $5,000.000
REFL PAV MRKR TY I-C
EA 10.000 $6.000 $5.500 $4.000 $7.500
REFL PAV MRKR TY I-R
EA 2,000.000 $4.770 $1.000 $4.000 $15.000
REFL PAV MRKR TY II-A-A
EA 1,750.000 $4.750 $3.000 $4.500 $10.000
REFL PAV MRKR TY II-C-R
EA 2,550.000 $4.790 $5.250 $6.000 $10.000
ELIM EXT PAV MRK & MRKS (6")
LF 37,500.000 $0.200 $0.160 $0.480 $1.250
ELIM EXT PAV MRK & MRKS (8")
LF 32,000.000 $0.290 $0.300 $0.950 $2.000
ELIM EXT PAV MRK & MRKS (12")
LF 45,000.000 $0.690 $0.640 $1.050 $3.000
ELIM EXT PAV MRK & MRKS (24")
LF 10,500.000 $1.380 $1.100 $2.100 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 300.000 $14.020 $27.000 $46.200 $100.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 100.000 $21.300 $27.000 $60.900 $150.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 150.000 $14.090 $28.000 $46.200 $100.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 18.000 $127.500 $110.000 $299.250 $350.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 18.000 $127.500 $110.000 $299.250 $350.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 20.000 $22.000 $50.000 $183.750 $250.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 1.000 $24.620 $50.000 $92.400 $250.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 8.000 $2.000 $30.000 $92.400 $500.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 1.000 $5.020 $10.000 $26.250 $100.000
ELIM EXT PAV MRK & MARKS (BIKE RR XING)
EA 1.000 $5.020 $10.000 $26.250 $500.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 1.000 $5.020 $10.000 $26.250 $200.000
ELIM EXT PAV MRK & MARKS (BIKE WORD)
EA 1.000 $5.020 $10.000 $26.250 $300.000
ELIM EXT PAV MRK & MARKS (BIKE DOT)
EA 1.000 $5.020 $1.000 $1.050 $250.000
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 50.000 $13.620 $65.000 $52.500 $100.000
ELIM EXT PAV MRK & MRKS (UTRN/LT ARR)
EA 25.000 $13.620 $50.000 $52.500 $50.000
PAV SURF PREP FOR MRK (6")
LF 37,500.000 $0.150 $0.020 $1.000 $0.500
PAV SURF PREP FOR MRK (8")
LF 32,000.000 $0.100 $0.050 $0.400 $0.750
PAV SURF PREP FOR MRK (12")
LF 45,000.000 $0.190 $0.220 $0.400 $1.000
PAV SURF PREP FOR MRK (24")
LF 10,500.000 $0.250 $0.400 $0.120 $1.500
PAV SURF PREP FOR MRK (ARROW)
EA 300.000 $6.360 $8.000 $5.250 $50.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 100.000 $6.330 $8.000 $5.250 $50.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 50.000 $6.300 $8.000 $5.250 $50.000
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 25.000 $6.360 $8.000 $5.250 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 150.000 $6.330 $8.000 $5.250 $50.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 18.000 $34.490 $8.000 $10.500 $150.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 18.000 $34.820 $9.000 $10.500 $50.000
PAV SURF PREP FOR MRK (RR XING)
EA 20.000 $33.000 $9.000 $5.250 $300.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 50.000 $6.120 $2.000 $5.250 $50.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 50.000 $6.120 $5.000 $5.250 $100.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 8.000 $5.050 $8.000 $10.500 $50.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 1.000 $5.050 $5.000 $5.250 $500.000
PAV SURF PREP FOR MRK (BIKE RR XING)
EA 1.000 $5.050 $5.000 $5.250 $500.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 1.000 $5.050 $5.000 $5.250 $500.000
PAV SURF PREP FOR MRK (BIKE WORD)
EA 1.000 $5.050 $5.000 $5.250 $500.000
PAV SURF PREP FOR MRK (BIKE DOT)
EA 1.000 $5.050 $5.000 $5.250 $500.000
POTHOLE REPAIR (STANDARD)
LB 20,000.000 $6.000 $4.000 $4.000 $0.500
SPOT MOWING
AC 500.000 $53.800 $300.000 $100.000 $25.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 300.000 $250.000 $160.000 $265.000 $625.000
LITTER REMOVAL (SPOT)
AC 150.000 $60.000 $30.000 $250.000 $50.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 150.000 $60.000 $75.000 $250.000 $750.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $150.000 $200.000 $250.000 $500.000
CLEANING / SWEEPING (HANDWORK)
SY 500,000.000 $0.500 $1.000 $0.300 $0.650
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
LS 1.000 $100,000.000 $80,000.000 $35,000.000 $100,000.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 5,000.000 $2.000 $1.200 $1.750 $50.000
GRAFFITI REMOVAL (PAINTING)
SF 200,000.000 $1.000 $0.900 $1.250 $2.500
TREE TRIMMING / BRUSH REMOVAL
MI 50.000 $1,700.000 $1,000.000 $2,150.000 $3,500.000
TREE REMOVAL (4" - 12" DIA)
EA 500.000 $105.000 $175.000 $80.000 $375.000
TREE REMOVAL (12" - 18" DIA)
EA 250.000 $130.000 $250.000 $80.000 $500.000
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $167.500 $250.000 $120.000 $750.000
TREE REMOVAL (24" - 30" DIA)
EA 10.000 $167.500 $500.000 $200.000 $750.000
TREE REMOVAL (30" - 36" DIA)
EA 10.000 $195.000 $525.000 $500.000 $1,000.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $300.000 $1,000.000 $450.000 $1,000.000
TREE REMOVAL (42" - 48" DIA)
EA 1.000 $300.000 $1,000.000 $1,000.000 $2,500.000
TREE REMOVAL (48" - 60" DIA)
EA 1.000 $475.000 $1,200.000 $1,500.000 $5,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 1,000.000 $4.500 $6.250 $1.500 $25.000
DRAIN INLET CLEANING
EA 2,000.000 $66.000 $32.000 $65.000 $65.000
PUMP STATION WELL CLEANING
EA 44.000 $1,850.000 $1,800.000 $1,785.000 $500.000
BASKET AND INLET PIPE CLEANING
EA 62.000 $325.000 $350.000 $350.000 $500.000
DOWNSPOUT CLEANING
EA 250.000 $240.000 $330.000 $125.000 $150.000
SUMP CLEANING
EA 44.000 $315.000 $350.000 $367.500 $500.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 5,000.000 $3.900 $4.000 $4.500 $6.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 5,000.000 $4.800 $4.750 $4.600 $7.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 1,000.000 $5.750 $5.500 $5.500 $10.000
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 1,000.000 $6.650 $7.500 $6.300 $12.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 100.000 $6.450 $8.500 $7.350 $15.000
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 100.000 $7.370 $10.500 $9.450 $20.000
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 100.000 $10.750 $11.500 $10.500 $25.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $12.000 $13.500 $12.080 $35.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 100.000 $15.000 $17.500 $15.230 $50.000
SLOTTED DRAIN CLEANING
LF 2,000.000 $4.500 $4.200 $3.680 $2.500
STORM SEWER CLEAN X LRG PUMP STAT WELL
EA 16.000 $7,875.000 $8,000.000 $7,875.000 $2,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 7,500.000 $16.500 $16.000 $20.000 $30.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $7.500 $1.100 $20.000 $750.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 125.000 $15.000 $1.100 $20.000 $6.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 350.000 $34.500 $33.000 $40.000 $75.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 300.000 $48.500 $50.000 $65.000 $100.000
REALIGN POSTS
EA 200.000 $10.500 $10.000 $10.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,500.000 $27.000 $20.000 $50.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $60.000 $35.000 $65.000 $65.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $2,850.000 $3,500.000 $3,200.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,050.000 $850.000 $1,100.000 $1,250.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $150.000 $75.000 $150.000 $250.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $109.000 $100.000 $100.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 100.000 $88.000 $100.000 $100.000 $75.000
REPLACE SGT STRUT
EA 40.000 $62.000 $120.000 $80.000 $75.000
REPLACE SGT OBJECT MARKER
EA 200.000 $20.000 $22.000 $20.000 $35.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $18,000.000 $32,000.000 $20,000.000 $20,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $30,000.000 $35,000.000 $30,000.000 $25,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 100.000 $1,100.000 $750.000 $850.000 $1,500.000
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $2,900.000 $3,350.000 $2,950.000 $2,000.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,500.000 $250.000 $1,200.000 $2,000.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 25.000 $1,200.000 $800.000 $850.000 $1,500.000
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $2,900.000 $3,400.000 $2,950.000 $2,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 10.000 $18,000.000 $28,000.000 $27,000.000 $10,000.000
REPAIR (SMTC) (N)
EA 500.000 $350.000 $650.000 $1,000.000 $500.000
REMOVE AND REPLACE (SMTC) (W)
EA 10.000 $30,000.000 $33,000.000 $35,000.000 $20,000.000
REPAIR (SMTC) (W)
EA 500.000 $350.000 $650.000 $250.000 $500.000
REPAIR TAU II (N)
LF 250.000 $320.000 $330.000 $150.000 $250.000
REPAIR TAU II (W)
LF 250.000 $50.000 $100.000 $150.000 $350.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 2.000 $2,500.000 $2,000.000 $2,500.000 $2,500.000
REPAIR (SMTC) (W)
LF 500.000 $200.000 $80.000 $125.000 $500.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $200.000 $80.000 $200.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 400.000 $100.000 $110.000 $100.000 $275.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 20.000 $650.000 $1,000.000 $300.000 $750.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 5.000 $360.000 $1,000.000 $750.000 $2,500.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 1.000 $360.000 $250.000 $500.000 $1,500.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 1,500.000 $258.000 $400.000 $300.000 $75.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $225.000 $250.000 $250.000 $250.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 100.000 $85.000 $65.000 $200.000 $100.000
TMA (STATIONARY)
DAY 1,000.000 $200.000 $250.000 $1.000 $350.000
TMA (MOBILE OPERATION)
HR 4,000.000 $60.000 $40.000 $1.000 $75.000
STORM SEWER (TELEVISION INSPECTION)
LF 300.000 $9.500 $12.000 $3.850 $100.000
SNOW AND ICE CONTROL (TRUCK)
HR 1,000.000 $60.000 $20.000 $135.000 $125.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,000.000 $60.000 $25.000 $85.000 $125.000
SNOW AND ICE CONTROL (LOADER)
HR 50.000 $60.000 $75.000 $100.000 $250.000
SNOW AND ICE CONTROL (SEASON)
MO 4.000 $15,000.000 $100,000.000 $115,000.000 $75,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 200.000 $45.000 $750.000 $135.000 $100.000
BRINE SOLUTION (DEL)
GAL 100,000.000 $0.460 $0.500 $0.420 $0.750
Totals: $5,785,722.090 $7,086,132.000 $7,412,306.800 $9,984,500.000