Show Job Controls
Bid Cobra

HARRIS US0290 (6385-17-001)

Items: 45

County: HARRIS
Length: N/A
Highway: US0290
District: HOUSTON
Control Number: 6385-17-001
DBE Goal: N/A
Project: RMC - 638517001
Guaranty: N/A
Time: 60 W
Engineer's Estimate: $239,124.42
Date: 10/12/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$239,124.42
$269,955.89
Over/Under Est: 12.89% $30,831.47
Over/Under Est: 24.8% $59,300.92
Amt Left: 10.55% $28,469.45
Over/Under Est: 42.4% $101,396.18
Amt Left: 26.14% $70,564.71
Delta: -14.11% -$42,095.26
Over/Under Est: 52.24% $124,921.58
Amt Left: 34.85% $94,090.11
Delta: -6.91% -$23,525.40
Over/Under Est: 69.89% $167,128.58
Amt Left: 50.49% $136,297.11
Delta: -11.59% -$42,207.00

Bid Items & Bid Tabulations

45 Total 0 of 45
HARRIS  |  US0290  |  HOUSTON  |  6385-17-001  |  10/12/2021  |  $239,124.42  |  RMC - 638517001  |  BRIDGE REPL  |  60 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
FORDE CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
ISI CONTRACTING, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
EXCAVATION (ROADWAY AND CHANNEL)
CY 234.000 $40.000 $19.550 $25.000 $25.000 $80.000 $20.000
SUBGRADE WIDENING (DENS CONT)
STA 2.000 $1,200.000 $920.000 $3,350.000 $4,000.000 $6,000.000 $5,000.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 112.000 $75.000 $20.700 $50.000 $60.000 $100.000 $25.000
BACKFILL (TY A)
STA 6.000 $250.000 $575.000 $645.000 $300.000 $500.000 $3,250.000
COMPOST MANUF TOPSOIL (4")
SY 1,940.000 $6.000 $4.000 $1.650 $2.000 $1.000 $10.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,940.000 $0.400 $2.250 $0.340 $0.800 $1.000 $0.650
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,940.000 $2.000 $2.250 $0.520 $0.800 $1.000 $0.650
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,940.000 $0.290 $1.380 $0.340 $0.800 $1.000 $0.700
FERTILIZER
AC 0.040 $860.000 $1,035.000 $24,375.000 $25,000.000 $27,500.000 $1,750.000
VEGETATIVE WATERING
MG 5.000 $60.000 $74.750 $450.000 $100.000 $14.000 $97.000
CEMENT TREAT (NEW BASE)(12")
SY 125.000 $4.000 $32.200 $60.000 $75.000 $81.000 $30.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 15.000 $320.000 $97.750 $335.000 $250.000 $712.000 $150.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 185.000 $120.000 $210.000 $140.000 $190.000 $198.000 $150.000
TACK COAT
GAL 185.000 $5.000 $11.500 $2.750 $10.000 $3.000 $15.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 200.000 $60.000 $79.000 $60.000 $70.000 $155.000 $40.000
PLANE ASPH CONC PAV (2")
SY 1,571.000 $2.500 $10.250 $3.250 $10.000 $8.000 $15.000
CEM STABIL BKFL
CY 65.000 $166.000 $197.000 $45.000 $120.000 $100.000 $80.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $550.000 $422.500 $1,150.000 $500.000 $790.000 $750.000
CONC BOX CULV (8 FT X 4 FT)
LF 52.000 $1,000.000 $800.000 $1,050.000 $1,100.000 $825.000 $1,300.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $10,000.000 $18,000.000 $20,000.000 $28,000.000 $30,000.000 $31,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $15,000.000 $9,250.000 $10,000.000 $20,000.000 $12,414.000 $20,500.000
MOBILIZATION
LS 1.000 $15,000.000 $25,500.000 $30,000.000 $30,000.000 $35,000.000 $35,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $2,000.000 $920.000 $2,500.000 $1,500.000 $2,440.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 36.000 $25.000 $25.300 $65.000 $50.000 $26.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 36.000 $12.000 $17.250 $65.000 $5.000 $9.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 288.000 $2.000 $4.313 $2.050 $5.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 288.000 $2.000 $2.120 $1.100 $1.000 $3.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 102.000 $30.000 $28.750 $32.000 $30.000 $35.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 65.000 $30.000 $32.200 $65.000 $45.000 $64.000 $50.000
SHORT RADIUS
LF 70.000 $40.000 $40.250 $225.000 $170.000 $51.000 $55.000
REMOVE METAL BEAM GUARD FENCE
LF 80.000 $5.000 $17.250 $1.500 $5.000 $1.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $275.000 $138.000 $173.000 $250.000 $1.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $1,184.500 $3,600.000 $3,200.000 $2,200.000 $2,750.000
ALUMINUM SIGNS (TY A)
SF 75.000 $35.000 $36.800 $21.000 $25.000 $27.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,000.000 $253.000 $700.000 $650.000 $686.000 $450.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $750.000 $287.500 $1,000.000 $850.000 $1,104.000 $470.000
REMOVE SM RD SN SUP&AM
EA 4.000 $120.000 $97.750 $65.000 $85.000 $167.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $17.000 $17.250 $45.000 $20.000 $14.000 $420.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 382.000 $0.250 $0.460 $0.550 $0.800 $1.000 $4.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 20.000 $4.000 $2.185 $5.000 $10.000 $2.000 $4.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,410.000 $0.280 $0.805 $0.550 $0.800 $1.000 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 20.000 $4.200 $5.520 $8.000 $14.000 $11.000 $26.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 382.000 $0.410 $0.920 $1.120 $1.500 $2.000 $7.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,410.000 $0.400 $2.185 $1.120 $1.500 $1.000 $7.000
REFL PAV MRKR TY II-A-A
EA 36.000 $3.000 $5.980 $10.000 $25.000 $6.000 $120.000
Totals: $239,124.420 $269,955.894 $298,425.340 $340,520.600 $364,046.000 $406,253.000