Show Job Controls
Bid Cobra

HARRIS IH0610 (6382-76-001)

Items: 52

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6382-76-001
DBE Goal: N/A
Project: RMC - 638276001
Guaranty: N/A
Time: 340 CALENDAR DAYS
Engineer's Estimate: $1,055,061.88
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: COMMUNICATION CABLE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,055,061.88
$685,626.80
Over/Under Est: -35.02% -$369,435.08
Over/Under Est: -21.08% -$222,356.88
Amt Left: 21.45% $147,078.20
Over/Under Est: -12.73% -$134,281.15
Amt Left: 34.3% $235,153.93
Delta: -10.58% -$88,075.73

Bid Items & Bid Tabulations

52 Total 0 of 52
HARRIS  |  IH0610  |  HOUSTON  |  6382-76-001  |  09/01/2021  |  $1,055,061.88  |  RMC - 638276001  |  COMMUNICATION CABLE  |  340 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRAF-TEX, INC.
THIRD COAST SERVICES LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
MOBILIZATION (CALLOUT)
EA 9.000 $1,309.410 $202.000 $2,500.000 $3,886.670
MOBILIZATION (EMERGENCY)
EA 4.000 $1,736.370 $365.000 $500.000 $4,603.190
CONDT (PVC) (SCH 80) (2")
LF 1,920.000 $11.900 $10.390 $10.000 $13.110
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,920.000 $19.410 $15.500 $12.000 $18.350
CONDT (PVC) (SCH 80) (3")
LF 480.000 $11.370 $19.160 $11.000 $19.080
CONDT (PVC) (SCH 80) (3") (BORE)
LF 480.000 $20.460 $20.590 $15.000 $26.720
CONDT (PVC) (SCH 80) (4")
LF 200.000 $15.320 $27.200 $16.000 $23.970
CONDT (PVC) (SCH 80) (4") (BORE)
LF 200.000 $23.150 $32.440 $20.000 $31.510
CONDT (RM) (2")
LF 100.000 $21.950 $25.540 $20.000 $24.200
CONDT (RM) (2") (BORE)
LF 175.000 $17.340 $29.180 $20.000 $31.020
CONDT (RM) (3")
LF 96.000 $34.090 $44.670 $22.000 $46.010
CONDT (RM) (3") (BORE)
LF 96.000 $34.610 $46.730 $22.000 $47.900
ELEC CONDR (NO.14) BARE
LF 28,800.000 $1.500 $0.570 $1.000 $0.630
ELEC CONDR (NO.6) BARE
LF 28,800.000 $1.380 $1.240 $1.500 $1.320
GROUND BOX TY D (162922)W/APRON
EA 25.000 $955.040 $727.000 $900.000 $953.000
REMOVE GROUND BOX
EA 25.000 $191.150 $101.600 $50.000 $194.930
INSTALL UNDERGROUND CONDUIT
LF 2,880.000 $8.540 $11.760 $3.750 $15.130
COMM CABLE (AERIAL)(22 AWG)(6 PAIR)
LF 9,600.000 $2.390 $2.700 $2.750 $2.350
COMM CABLE (UNDRGRND)(19 AWG)(6 PAIR)
LF 9,600.000 $1.850 $1.150 $2.000 $2.220
ITS COM CBL (ETHERNET)
LF 4,800.000 $2.400 $2.350 $2.500 $1.240
ITS COM CBL CONNECTOR
EA 500.000 $8.390 $5.000 $10.000 $1.490
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 1,920.000 $2.790 $2.780 $2.500 $2.590
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 28,800.000 $3.210 $2.320 $2.950 $1.880
FIBER OPTIC PIGTAIL (12 FIBER)
LF 280.000 $4.750 $7.030 $30.000 $10.600
FIBER OPTIC SPLICE ENCLOSURE
EA 25.000 $967.090 $967.520 $1,000.000 $924.720
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 20.000 $1,493.890 $369.610 $2,200.000 $283.500
FIBER OPTIC FUSION SPLICE
EA 192.000 $55.140 $30.000 $50.000 $40.050
CONDUIT (PREPARE)
LF 25,500.000 $2.470 $0.600 $1.250 $1.100
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 20.000 $3,861.330 $2,147.000 $3,500.000 $3,328.650
ITS RADIO (INSTALL ONLY)
EA 96.000 $939.930 $568.000 $825.000 $892.520
RELOCATE ITS RADIO
EA 35.000 $1,437.500 $593.000 $400.000 $906.490
REMOVE ITS RADIO
EA 35.000 $635.230 $126.640 $200.000 $189.760
VIVDS MULTI CON COM CAX CBL(3COND16AWG)
LF 960.000 $2.020 $4.710 $2.750 $1.890
WIRELESS ETHERNET RADIO (LOCAL) LINK
EA 5.000 $4,681.140 $2,265.000 $2,800.000 $6,397.180
WIRE SPLICES
EA 20.000 $55.110 $31.000 $25.000 $138.170
OVERHEAD CABLE PLACEMENT
LF 960.000 $2.210 $1.160 $2.850 $2.540
JACKING AND BORING
LF 1,920.000 $12.000 $15.210 $7.000 $21.870
TRENCHING AND INSTALLATION OF CONDUIT
LF 2,900.000 $7.170 $11.760 $3.750 $15.090
ETHERNET SWITCH (INSTALL ONLY)
EA 196.000 $212.170 $189.000 $100.000 $82.780
REMOVE EXISTING CABLES (FIBER)
LF 960.000 $0.810 $0.930 $0.500 $0.560
REMOVE EXISTING CABLES (POWER)
LF 960.000 $0.780 $0.940 $0.500 $0.700
REMOVE EXISTING CABLES (COMMUNICATION)
LF 25,000.000 $0.810 $0.310 $0.500 $0.560
TMA (STATIONARY)
DAY 75.000 $253.730 $141.000 $375.000 $204.830
TMA (MOBILE OPERATION)
DAY 50.000 $200.900 $140.000 $375.000 $435.980
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 10.000 $576.340 $569.310 $500.000 $347.690
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 40.000 $569.930 $208.000 $500.000 $498.220
RVDS(PRES AND ADV DET)(INSTALL ONLY)
EA 30.000 $640.380 $208.000 $500.000 $796.810
RELOCATE RVDS
EA 1.000 $756.370 $238.000 $500.000 $764.110
REMOVE RVDS
EA 1.000 $301.790 $235.000 $100.000 $172.830
INSTALL OF ETHERNET SURGE PROTECT
EA 100.000 $120.060 $46.000 $150.000 $132.130
INSTALLATION OF CELLULAR MODEM
EA 34.000 $1,154.730 $200.000 $150.000 $57.310
CELLULAR ROUTER
EA 5.000 $3,420.830 $230.000 $750.000 $809.090
Totals: $1,055,061.880 $685,626.800 $832,705.000 $920,780.730