HARRIS IH0610 (6376-28-001)

Items: 371

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6376-28-001
DBE Goal: N/A
Project: RMC - 637628001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $15,022,605.40
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$15,022,605.40
$13,849,066.55
Over/Under Est: -7.81% -$1,173,538.85
Over/Under Est: -1.67% -$250,188.21
Amt Left: 6.67% $923,350.64

Bid Items & Bid Tabulations

371 Total 0 of 371
HARRIS  |  IH0610  |  HOUSTON  |  6376-28-001  |  06/04/2021  |  $15,022,605.40  |  RMC - 637628001  |  FULL DEPTH CONC REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (SIDEWALKS)
SY 50.000 $10.000 $13.000 $4.900
REMOVING CONC (CURB)
LF 50.000 $1.000 $1.000 $4.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 4.000 $20.000 $8.000 $50.000
BLADING
STA 50.000 $75.000 $75.000 $80.000
BLADING
LF 20,000.000 $4.000 $5.000 $4.000
CEM TRT(PLNT MX) (CL L)(TY C)(GR 1-2)
TON 2.000 $70.000 $60.000 $70.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 400.000 $45.000 $40.000 $30.000
FULL - DEPTH REPAIR CRCP (9")
SY 16,000.000 $315.000 $214.000 $180.000
FULL - DEPTH REPAIR CRCP (10")
SY 300.000 $315.000 $318.000 $256.000
FULL - DEPTH REPAIR CRCP (12")
SY 500.000 $318.000 $372.000 $270.000
FULL - DEPTH REPAIR CRCP (14")
SY 250.000 $350.000 $375.000 $290.000
FULL - DEPTH REPAIR CRCP (15")
SY 250.000 $350.000 $396.000 $315.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 400.000 $100.000 $70.000 $165.000
CONC STR REPAIR (STANDARD)
SF 500.000 $100.000 $75.000 $120.000
RIPRAP (CONC)(5 IN)
CY 10.000 $450.000 $450.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $400.000 $300.000 $390.000
CLEANING AND SEALING EXISTING JOINTS
LF 225.000 $35.000 $21.000 $20.000
CLEANING EXISTING JOINTS
LF 225.000 $35.000 $5.000 $8.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 150.000 $250.000 $200.000 $230.000
INLET (COMPL)(TY AZ)
EA 2.000 $2,000.000 $2,000.000 $1,380.000
INLET (COMPL)(EXT TY C)
EA 4.000 $950.000 $900.000 $1,380.000
INLET (STG II)(TY C)
EA 4.000 $1,000.000 $1,000.000 $1,380.000
MANH (STG II)(TY A)
EA 4.000 $1,000.000 $1,000.000 $1,380.000
REMOV STR (INLET)
EA 4.000 $300.000 $300.000 $380.000
REMOV STR (MANHOLE)
EA 4.000 $200.000 $300.000 $170.000
MOBILIZATION (CALLOUT)
EA 100.000 $250.000 $475.000 $500.000
MOBILIZATION (EMERGENCY)
EA 100.000 $250.000 $550.000 $500.000
PORT CTB (DES SOURCE)(SAFETY SH)
LF 600.000 $5.000 $5.000 $30.000
PORT CTB (MOVE)(SAFETY SH)
LF 2,400.000 $7.000 $10.000 $40.000
PORT CTB (STKPL)(SAFETY SH)
LF 600.000 $5.000 $5.000 $25.000
LANDSCAPE PAVERS
SY 150.000 $88.000 $50.000 $75.000
REMOVE AND RELAY PAVERS
SY 200.000 $55.000 $30.000 $50.000
CONC CURB (MONO) (TY I)
LF 50.000 $3.000 $4.000 $17.500
CONC CURB (MONO) (TY II)
LF 50.000 $3.000 $4.000 $17.500
CONC CURB (U-TURN)
LF 500.000 $40.000 $30.000 $17.500
CONC CURB (DOWEL)
LF 500.000 $12.000 $6.000 $17.500
CONC SIDEWALKS (4")
SY 50.000 $60.000 $50.000 $75.000
CURB RAMPS (TY 1)
EA 2.000 $2,200.000 $1,400.000 $2,100.000
CURB RAMPS (TY 7)
EA 2.000 $2,200.000 $1,400.000 $2,250.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,400.000 $1,800.000 $1,298.440
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,100.000 $1,100.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $1.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $1.000 $1.000 $1.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $20.000 $16.000 $20.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $20.000 $15.000 $20.000
CHAIN LINK FENCE (REMOVE)
LF 500.000 $1.000 $0.950 $3.900
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $500.000 $770.000 $500.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 1.000 $500.000 $770.000 $500.000
GATE (REMOVE)
EA 1.000 $180.000 $190.000 $180.000
GATE (INSTALL)(SINGLE)(6' X 24')
EA 1.000 $800.000 $1,050.000 $800.000
GATE (INSTALL)(DOUBLE)(6' X 16')
EA 1.000 $1,200.000 $1,500.000 $1,200.000
GATE (REPAIR)(SINGLE)(6' X 24')
EA 1.000 $650.000 $660.000 $650.000
GATE (REPAIR)(DOUBLE)(6' X 16')
EA 1.000 $650.000 $660.000 $650.000
ALUMINUM SIGNS (TY A)
SF 5,000.000 $18.000 $18.000 $22.000
ALUMINUM SIGNS (TY G)
SF 2,000.000 $18.000 $18.000 $28.000
ALUMINUM SIGNS (TY O)
SF 65.000 $20.000 $16.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 100.000 $45.000 $70.000 $80.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,000.000 $5.000 $7.000 $17.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 1,000.000 $7.000 $9.000 $17.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $5.000 $7.000 $12.500
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 1,000.000 $7.000 $9.000 $17.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,500.000 $0.650 $0.600 $0.620
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 2,500.000 $0.900 $0.930 $0.960
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 25,000.000 $0.900 $0.930 $0.950
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 20,000.000 $2.400 $2.600 $2.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 20,000.000 $2.400 $2.600 $2.680
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 10,000.000 $3.800 $4.100 $4.240
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 300.000 $126.000 $130.000 $135.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 100.000 $138.000 $133.000 $139.100
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 50.000 $126.000 $124.000 $130.000
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 25.000 $126.000 $123.000 $120.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 10.000 $126.000 $123.000 $120.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 150.000 $126.000 $130.000 $132.500
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $457.000 $510.000 $530.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 18.000 $457.000 $510.000 $530.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 20.000 $485.000 $300.000 $468.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 1.000 $125.000 $124.000 $121.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 1.000 $86.000 $51.000 $50.000
RFL PAV MRK TY I(W)BIKE RR XING(100MIL)
EA 1.000 $86.000 $51.000 $50.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 1.000 $86.000 $51.000 $50.000
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
EA 1.000 $86.000 $51.000 $50.000
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
EA 1.000 $86.000 $51.000 $50.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 4,500.000 $0.750 $0.750 $0.780
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 5,000.000 $1.900 $1.900 $1.950
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 500.000 $3.700 $3.650 $3.730
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,000.000 $0.900 $0.910 $0.900
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 50.000 $23.000 $23.000 $22.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 50.000 $40.000 $39.000 $38.500
PAVEMENT SEALER 6"
LF 37,500.000 $0.050 $0.050 $0.050
PAVEMENT SEALER 8"
LF 32,000.000 $0.100 $0.090 $0.100
PAVEMENT SEALER 12"
LF 45,000.000 $0.200 $0.170 $0.180
PAVEMENT SEALER 24"
LF 10,500.000 $0.320 $0.320 $0.330
PAVEMENT SEALER (ARROW)
EA 300.000 $6.300 $6.200 $6.470
PAVEMENT SEALER (WORD)
EA 150.000 $6.300 $6.200 $6.410
PAVEMENT SEALER (DBL ARROW)
EA 100.000 $8.800 $8.700 $9.130
PAVEMENT SEALER (UTURN ARROW)
EA 50.000 $8.800 $8.700 $8.600
PAVEMENT SEALER (LNDP ARROW)
EA 10.000 $6.300 $6.200 $6.410
PAVEMENT SEALER (U-L ARROW)
EA 25.000 $6.300 $6.200 $6.050
PAVEMENT SEALER (ENTR GORE)
EA 18.000 $45.000 $44.000 $46.010
PAVEMENT SEALER (EXIT GORE)
EA 18.000 $45.000 $44.000 $43.000
PAVEMENT SEALER (SYMBOL)
EA 1.000 $6.300 $6.200 $6.100
PAVEMENT SEALER (RR XING)
EA 20.000 $45.000 $44.000 $43.000
PAVEMENT SEALER (YLD TRI)
EA 100.000 $6.300 $6.200 $6.050
PAVEMENT SEALER (BIKE ARROW)
EA 1.000 $6.300 $6.200 $6.050
PAVEMENT SEALER (BIKE SYMBOL)
EA 1.000 $6.300 $6.200 $6.050
PAVEMENT SEALER (BIKE WORD)
EA 1.000 $6.300 $6.200 $6.050
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 10,000.000 $0.700 $1.250 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 20,000.000 $0.700 $1.250 $0.800
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,000.000 $0.650 $0.700 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 20,000.000 $0.650 $1.250 $1.000
PAVEMENT SEALER (BIKE RRX)
EA 1.000 $6.300 $6.200 $6.100
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 8.000 $3,600.000 $1,000.000 $1,000.000
REFL PAV MRKR TY I-C
EA 10.000 $4.500 $5.000 $7.000
REFL PAV MRKR TY I-R
EA 2,000.000 $4.500 $5.000 $4.550
REFL PAV MRKR TY II-A-A
EA 1,750.000 $4.500 $5.000 $4.510
REFL PAV MRKR TY II-C-R
EA 2,550.000 $4.500 $5.000 $4.590
ELIM EXT PAV MRK & MRKS (6")
LF 37,500.000 $0.250 $0.200 $0.210
ELIM EXT PAV MRK & MRKS (8")
LF 32,000.000 $0.300 $0.290 $0.300
ELIM EXT PAV MRK & MRKS (12")
LF 45,000.000 $0.700 $0.680 $0.710
ELIM EXT PAV MRK & MRKS (24")
LF 10,500.000 $1.400 $1.350 $1.410
ELIM EXT PAV MRK & MRKS (ARROW)
EA 300.000 $14.000 $14.000 $14.050
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 100.000 $21.000 $21.000 $21.600
ELIM EXT PAV MRK & MRKS (WORD)
EA 150.000 $14.000 $14.000 $14.180
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 18.000 $130.000 $129.000 $126.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 18.000 $130.000 $129.000 $126.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 20.000 $23.000 $22.000 $22.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 1.000 $25.000 $25.000 $24.250
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 8.000 $36.000 $20.000 $20.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 1.000 $6.300 $5.050 $5.000
ELIM EXT PAV MRK & MARKS (BIKE RR XING)
EA 1.000 $6.300 $5.050 $5.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 1.000 $6.300 $5.050 $5.000
ELIM EXT PAV MRK & MARKS (BIKE WORD)
EA 1.000 $6.300 $5.050 $5.000
ELIM EXT PAV MRK & MARKS (BIKE DOT)
EA 1.000 $6.300 $5.050 $5.000
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 50.000 $14.000 $14.000 $13.250
ELIM EXT PAV MRK & MRKS (UTRN/LT ARR)
EA 25.000 $14.000 $14.000 $13.250
PAV SURF PREP FOR MRK (6")
LF 37,500.000 $0.100 $0.050 $0.250
PAV SURF PREP FOR MRK (8")
LF 32,000.000 $0.100 $0.100 $0.100
PAV SURF PREP FOR MRK (12")
LF 45,000.000 $0.200 $0.200 $0.190
PAV SURF PREP FOR MRK (24")
LF 10,500.000 $0.250 $0.250 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 300.000 $6.300 $6.200 $6.530
PAV SURF PREP FOR MRK (DBL ARROW)
EA 100.000 $6.300 $6.200 $6.470
PAV SURF PREP FOR MRK (UTURN ARR)
EA 50.000 $6.300 $6.200 $6.410
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 25.000 $6.300 $6.200 $6.530
PAV SURF PREP FOR MRK (WORD)
EA 150.000 $6.250 $6.200 $6.470
PAV SURF PREP FOR MRK (ENTR GORE)
EA 18.000 $35.000 $34.000 $34.980
PAV SURF PREP FOR MRK (EXIT GORE)
EA 18.000 $35.000 $34.000 $35.640
PAV SURF PREP FOR MRK (RR XING)
EA 20.000 $35.000 $33.000 $33.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 50.000 $6.300 $6.200 $6.050
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 50.000 $6.300 $6.200 $6.050
PAV SURF PREP FOR MRKS (SHIELD)
EA 8.000 $6.300 $5.100 $5.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 1.000 $6.300 $5.100 $5.000
PAV SURF PREP FOR MRK (BIKE RR XING)
EA 1.000 $6.300 $5.100 $5.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 1.000 $6.300 $5.100 $5.000
PAV SURF PREP FOR MRK (BIKE WORD)
EA 1.000 $6.300 $5.100 $5.000
PAV SURF PREP FOR MRK (BIKE DOT)
EA 1.000 $6.300 $5.100 $5.000
POTHOLE REPAIR (STANDARD)
LB 20,000.000 $5.000 $7.000 $5.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 80,000.000 $2.350 $2.200 $2.600
SPOT MOWING
AC 500.000 $50.000 $50.000 $57.600
FULL - WIDTH MOWING - TRACT (1)
AC 385.400 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (2)
AC 244.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (3)
AC 60.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (4)
AC 60.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (5)
AC 120.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (6)
AC 1,080.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (7)
AC 32.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (8)
AC 528.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (9)
AC 21.600 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (12)
AC 1,560.000 $72.000 $70.000 $70.000
FULL - WIDTH MOWING - TRACT (14)
AC 72.000 $72.000 $70.000 $70.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 300.000 $250.000 $250.000 $195.000
LITTER REMOVAL (SPOT)
AC 150.000 $60.000 $60.000 $50.000
LITTER REMOVAL - TRACT (1)
CYC 52.000 $2,200.000 $1,750.000 $5,300.000
LITTER REMOVAL - TRACT (2)
CYC 52.000 $525.000 $620.000 $3,300.000
LITTER REMOVAL - TRACT (3)
CYC 52.000 $500.000 $570.000 $800.000
LITTER REMOVAL - TRACT (4)
CYC 52.000 $500.000 $570.000 $800.000
LITTER REMOVAL - TRACT (5)
CYC 52.000 $475.000 $550.000 $1,600.000
LITTER REMOVAL - TRACT (6)
CYC 52.000 $3,000.000 $3,400.000 $12,500.000
LITTER REMOVAL - TRACT (7)
CYC 52.000 $480.000 $550.000 $400.000
LITTER REMOVAL - TRACT (8)
CYC 52.000 $1,900.000 $1,750.000 $6,100.000
LITTER REMOVAL - TRACT (9)
CYC 52.000 $550.000 $510.000 $300.000
LITTER REMOVAL - TRACT (10)
CYC 1.000 $500.000 $540.000 $200.000
LITTER REMOVAL - TRACT (11)
CYC 1.000 $600.000 $625.000 $200.000
LITTER REMOVAL - TRACT (12)
CYC 52.000 $8,000.000 $9,250.000 $18,000.000
LITTER REMOVAL - TRACT (14)
CYC 52.000 $1,700.000 $1,750.000 $1,000.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 150.000 $60.000 $60.000 $150.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 24.000 $930.000 $655.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 24.000 $230.000 $175.000 $150.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 24.000 $200.000 $135.000 $1,200.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
CYC 24.000 $230.000 $175.000 $70.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
CYC 24.000 $200.000 $135.000 $170.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
CYC 24.000 $830.000 $550.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
CYC 24.000 $160.000 $120.000 $50.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
CYC 24.000 $830.000 $550.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (9)
CYC 24.000 $350.000 $290.000 $100.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (10)
CYC 1.000 $160.000 $150.000 $500.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (11)
CYC 1.000 $160.000 $150.000 $500.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (12)
CYC 24.000 $3,800.000 $3,050.000 $2,250.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (13)
CYC 24.000 $650.000 $600.000 $140.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (14)
CYC 24.000 $650.000 $600.000 $60.000
DEBRIS - FRONTAGE ROADS - AREA (1)
CYC 24.000 $460.000 $425.000 $770.000
DEBRIS - FRONTAGE ROADS - AREA (2)
CYC 24.000 $220.000 $210.000 $150.000
DEBRIS - FRONTAGE ROADS - AREA (3)
CYC 24.000 $125.000 $120.000 $1,200.000
DEBRIS - FRONTAGE ROADS - AREA (4)
CYC 24.000 $205.000 $200.000 $70.000
DEBRIS - FRONTAGE ROADS - AREA (6)
CYC 24.000 $520.000 $425.000 $720.000
DEBRIS - FRONTAGE ROADS - AREA (7)
CYC 24.000 $190.000 $190.000 $50.000
DEBRIS - FRONTAGE ROADS - AREA (8)
CYC 24.000 $500.000 $425.000 $800.000
DEBRIS - FRONTAGE ROADS - AREA (9)
CYC 24.000 $1,000.000 $1,600.000 $100.000
DEBRIS - FRONTAGE ROADS - AREA (12)
CYC 24.000 $1,000.000 $1,600.000 $2,250.000
DEBRIS - FRONTAGE ROADS - AREA (14)
CYC 24.000 $1,000.000 $1,600.000 $60.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
CYC 24.000 $530.000 $425.000 $770.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
CYC 24.000 $230.000 $210.000 $150.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
CYC 24.000 $160.000 $110.000 $1,200.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (4)
CYC 24.000 $490.000 $200.000 $70.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (5)
CYC 24.000 $230.000 $210.000 $170.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (6)
CYC 24.000 $530.000 $425.000 $720.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (7)
CYC 24.000 $200.000 $190.000 $50.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (8)
CYC 24.000 $530.000 $425.000 $700.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (9)
CYC 24.000 $450.000 $425.000 $100.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (12)
CYC 24.000 $1,700.000 $1,275.000 $2,250.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (13)
CYC 24.000 $450.000 $425.000 $150.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (14)
CYC 24.000 $2,700.000 $2,400.000 $60.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 24.000 $530.000 $425.000 $770.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 24.000 $230.000 $210.000 $150.000
DEBRIS-DIRECT CONNECTOR - AREA (4)
CYC 24.000 $230.000 $110.000 $70.000
DEBRIS-DIRECT CONNECTOR - AREA (5)
CYC 24.000 $150.000 $105.000 $170.000
DEBRIS-DIRECT CONNECTOR - AREA (6)
CYC 24.000 $440.000 $330.000 $720.000
DEBRIS-DIRECT CONNECTOR - AREA (7)
CYC 24.000 $200.000 $190.000 $50.000
DEBRIS-DIRECT CONNECTOR - AREA (8)
CYC 24.000 $350.000 $330.000 $700.000
DEBRIS-DIRECT CONNECTOR - AREA (9)
CYC 24.000 $350.000 $330.000 $100.000
DEBRIS-DIRECT CONNECTOR - AREA (12)
CYC 24.000 $1,750.000 $1,150.000 $2,250.000
DEBRIS-DIRECT CONNECTOR - AREA (13)
CYC 24.000 $350.000 $330.000 $150.000
DEBRIS-DIRECT CONNECTOR - AREA (14)
CYC 24.000 $350.000 $330.000 $60.000
CLEANING / SWEEPING (SPOT)
MI 25.000 $150.000 $60.000 $150.000
CLEANING / SWEEPING (HANDWORK)
SY 750,000.000 $0.440 $1.000 $0.400
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 24.000 $2,830.000 $2,775.000 $2,750.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 24.000 $420.000 $410.000 $420.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 24.000 $3,300.000 $3,300.000 $3,380.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
CYC 24.000 $420.000 $410.000 $420.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
CYC 24.000 $2,450.000 $2,675.000 $2,750.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
CYC 24.000 $115.000 $110.000 $110.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
CYC 24.000 $2,250.000 $2,260.000 $2,330.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(9)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (10)
CYC 1.000 $420.000 $410.000 $420.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (11)
CYC 1.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (12)
CYC 24.000 $7,800.000 $7,820.000 $8,030.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (13)
CYC 24.000 $420.000 $410.000 $420.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (14)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 24.000 $2,825.000 $2,675.000 $2,750.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 24.000 $3,350.000 $3,300.000 $3,380.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
CYC 24.000 $2,450.000 $2,675.000 $2,750.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
CYC 24.000 $115.000 $110.000 $110.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
CYC 24.000 $2,250.000 $2,260.000 $2,330.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(9)
CYC 24.000 $220.000 $205.000 $210.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(10)
CYC 1.000 $420.000 $410.000 $420.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(11)
CYC 1.000 $210.000 $205.000 $210.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(12)
CYC 24.000 $7,900.000 $7,820.000 $8,030.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(13)
CYC 24.000 $420.000 $410.000 $420.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(14)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 24.000 $2,850.000 $2,675.000 $2,750.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 24.000 $3,300.000 $3,290.000 $3,380.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
CYC 24.000 $2,500.000 $2,675.000 $2,750.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
CYC 24.000 $110.000 $110.000 $110.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
CYC 24.000 $2,250.000 $2,265.000 $2,330.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(9)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - FRONTAGE ROAD -AREA(12)
CYC 24.000 $7,800.000 $7,820.000 $8,030.000
CLEAN / SWEEP - FRONTAGE ROAD -AREA(14)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 24.000 $2,825.000 $2,675.000 $2,750.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 24.000 $405.000 $410.000 $420.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 24.000 $3,300.000 $3,300.000 $3,380.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
CYC 24.000 $200.000 $205.000 $210.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
CYC 24.000 $2,420.000 $2,675.000 $2,750.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
CYC 24.000 $110.000 $110.000 $110.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
CYC 24.000 $2,225.000 $2,260.000 $2,330.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 9)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 12)
CYC 24.000 $7,800.000 $7,820.000 $8,030.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 13)
CYC 24.000 $405.000 $410.000 $420.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 14)
CYC 24.000 $200.000 $205.000 $210.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 24.000 $2,825.000 $2,675.000 $2,750.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
CYC 24.000 $200.000 $205.000 $210.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
CYC 24.000 $410.000 $410.000 $420.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
CYC 24.000 $2,420.000 $2,675.000 $2,750.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(7)
CYC 24.000 $110.000 $110.000 $110.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(8)
CYC 24.000 $2,225.000 $2,260.000 $2,330.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(9)
CYC 24.000 $210.000 $205.000 $210.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(12)
CYC 24.000 $7,800.000 $7,820.000 $8,030.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(13)
CYC 24.000 $420.000 $410.000 $420.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(14)
CYC 24.000 $210.000 $205.000 $210.000
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
LS 1.000 $75,000.000 $150,000.000 $70,000.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 5,000.000 $0.500 $1.000 $3.000
GRAFFITI REMOVAL (PAINTING)
SF 100,000.000 $0.600 $1.000 $1.000
TREE TRIMMING / BRUSH REMOVAL
MI 50.000 $1,400.000 $1,400.000 $2,000.000
TREE REMOVAL (4" - 12" DIA)
EA 500.000 $150.000 $150.000 $60.000
TREE REMOVAL (12" - 18" DIA)
EA 250.000 $180.000 $180.000 $80.000
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $185.000 $185.000 $150.000
TREE REMOVAL (24" - 30" DIA)
EA 10.000 $185.000 $185.000 $150.000
TREE REMOVAL (30" - 36" DIA)
EA 10.000 $190.000 $190.000 $200.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $300.000 $300.000 $300.000
TREE REMOVAL (42" - 48" DIA)
EA 1.000 $300.000 $300.000 $300.000
TREE REMOVAL (48" - 60" DIA)
EA 1.000 $400.000 $500.000 $450.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 1,000.000 $8.000 $7.000 $2.000
DRAIN INLET CLEANING
EA 1,000.000 $75.000 $75.000 $57.000
PUMP STATION WELL CLEANING
EA 44.000 $1,950.000 $1,950.000 $1,750.000
BASKET AND INLET PIPE CLEANING
EA 72.000 $330.000 $330.000 $320.000
DOWNSPOUT CLEANING
EA 250.000 $250.000 $280.000 $200.000
SUMP CLEANING
EA 52.000 $500.000 $330.000 $300.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 5,000.000 $6.500 $3.800 $4.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 10,000.000 $6.500 $4.600 $5.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 1,000.000 $6.000 $6.000 $5.500
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 1,000.000 $6.500 $6.500 $6.800
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 100.000 $5.000 $5.000 $7.900
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 100.000 $5.000 $5.000 $9.750
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 100.000 $11.000 $11.000 $10.500
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $12.000 $12.000 $12.500
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 100.000 $15.000 $15.000 $15.500
SLOTTED DRAIN CLEANING
LF 750.000 $5.000 $5.000 $4.000
STORM SEWER CLEAN X LRG PUMP STAT WELL
EA 16.000 $8,000.000 $8,000.000 $7,750.000
PUMP STATION WELL CLEANING (LARGE)
EA 20.000 $4,800.000 $4,600.000 $4,400.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 7,500.000 $15.000 $15.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $5.000 $5.000 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 125.000 $5.000 $5.000 $25.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 350.000 $34.000 $34.000 $35.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 300.000 $42.000 $42.000 $55.000
REALIGN POSTS
EA 200.000 $6.000 $6.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,500.000 $24.000 $24.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $45.000 $45.000 $75.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $2,900.000 $2,900.000 $2,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,100.000 $1,100.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $100.000 $100.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $109.000 $109.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 100.000 $88.000 $88.000 $200.000
REPLACE SGT STRUT
EA 40.000 $62.000 $62.000 $250.000
REPLACE SGT OBJECT MARKER
EA 200.000 $20.000 $20.000 $40.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $18,000.000 $18,000.000 $10,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $30,000.000 $25,000.000 $12,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 100.000 $1,100.000 $1,100.000 $800.000
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $2,900.000 $2,900.000 $2,800.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,500.000 $1,500.000 $1,850.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 25.000 $1,200.000 $1,200.000 $800.000
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $2,900.000 $2,900.000 $2,800.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $30,000.000 $35,000.000 $29,500.000
REPAIR TAU II (N)
LF 250.000 $320.000 $310.000 $250.000
REPAIR TAU II (W)
LF 250.000 $50.000 $50.000 $175.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 2.000 $2,500.000 $2,000.000 $2,500.000
REPAIR (SMTC) (W)
LF 500.000 $200.000 $100.000 $150.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $20,000.000 $29,000.000 $20,000.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $200.000 $200.000 $150.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 20,000.000 $7.000 $6.000 $5.100
TYPE CAC CONCRETE
CY 25.000 $8,500.000 $4,000.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $90.000 $125.000 $200.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 20.000 $810.000 $800.000 $500.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 5.000 $360.000 $360.000 $360.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 1.000 $360.000 $360.000 $360.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 1,500.000 $258.000 $267.000 $250.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $225.000 $225.000 $200.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 100.000 $70.000 $70.000 $100.000
TMA (STATIONARY)
DAY 1,000.000 $200.000 $200.000 $1.000
TMA (MOBILE OPERATION)
HR 3,000.000 $60.000 $60.000 $105.000
STORM SEWER (TELEVISION INSPECTION)
LF 300.000 $5.000 $10.000 $9.000
SNOW AND ICE CONTROL (TRUCK)
HR 1,000.000 $5.000 $5.000 $75.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,000.000 $5.000 $5.000 $100.000
SNOW AND ICE CONTROL (LOADER)
HR 50.000 $35.000 $100.000 $200.000
SNOW AND ICE CONTROL (SEASON)
MO 4.000 $5,000.000 $5,000.000 $100,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 200.000 $45.000 $55.000 $100.000
Totals: $15,022,605.400 $13,849,066.550 $14,772,417.190