|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$4.640
|
$4.000
|
$2.000
|
$12.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
60.000
|
$14.000
|
$10.000
|
$15.000
|
$25.000
|
|
|
BLADING
|
STA
|
100.000
|
$77.220
|
$100.000
|
$100.000
|
$100.000
|
|
|
BLADING
|
LF
|
1,000.000
|
$2.000
|
$5.000
|
$4.000
|
$5.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
100.000
|
$56.380
|
$42.000
|
$75.000
|
$40.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
10,000.000
|
$22.110
|
$28.000
|
$15.000
|
$25.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
10,000.000
|
$55.200
|
$40.500
|
$20.000
|
$20.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (7"-13")
|
SY
|
100.000
|
$78.570
|
$50.000
|
$86.000
|
$80.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
1,500.000
|
$286.240
|
$280.000
|
$250.000
|
$300.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
500.000
|
$315.870
|
$282.000
|
$278.000
|
$270.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
200.000
|
$320.860
|
$285.000
|
$303.000
|
$260.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
500.000
|
$293.180
|
$250.000
|
$230.000
|
$200.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
100.000
|
$76.570
|
$50.000
|
$33.000
|
$55.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
75.000
|
$130.170
|
$55.000
|
$35.000
|
$78.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
50.000
|
$97.480
|
$75.000
|
$200.000
|
$100.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
50.000
|
$123.880
|
$125.000
|
$300.000
|
$120.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
10.000
|
$550.000
|
$200.000
|
$300.000
|
$500.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
500.000
|
$15.040
|
$7.000
|
$18.000
|
$12.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
48.000
|
$613.540
|
$1.000
|
$100.000
|
$1,000.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$1,989.300
|
$500.000
|
$500.000
|
$2,000.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
120.000
|
$5.190
|
$10.000
|
$4.000
|
$15.000
|
|
|
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
|
LF
|
30.000
|
$16.750
|
$5.000
|
$25.000
|
$25.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
30.000
|
$16.020
|
$5.000
|
$25.000
|
$20.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
200.000
|
$47.950
|
$25.000
|
$70.000
|
$20.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
100.000
|
$15.820
|
$17.000
|
$6.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,057.950
|
$1,250.000
|
$1,800.000
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,310.320
|
$1,150.000
|
$1,300.000
|
$1,800.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,028.790
|
$1,800.000
|
$2,600.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$391.670
|
$300.000
|
$500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$3,133.330
|
$1,000.000
|
$2,100.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$1,430.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$3,328.570
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
20.000
|
$31.580
|
$5.000
|
$25.000
|
$30.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
20.000
|
$20.000
|
$5.000
|
$20.000
|
$25.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,100.000
|
$500.000
|
$1,200.000
|
$800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
300.000
|
$19.720
|
$25.000
|
$21.000
|
$30.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
200.000
|
$21.020
|
$27.000
|
$18.000
|
$40.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
30.000
|
$19.020
|
$30.000
|
$18.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
25.000
|
$3.800
|
$4.160
|
$8.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$3.170
|
$6.500
|
$8.000
|
$8.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
25.000
|
$13.920
|
$29.330
|
$20.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
25.000
|
$4.290
|
$6.940
|
$8.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$4.190
|
$12.130
|
$8.000
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$12.730
|
$29.670
|
$8.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$14.160
|
$30.000
|
$20.000
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
100.000
|
$0.850
|
$2.250
|
$0.960
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.800
|
$1.500
|
$2.720
|
$1.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,000.000
|
$2.300
|
$3.340
|
$1.210
|
$3.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,000.000
|
$4.090
|
$6.690
|
$4.640
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$96.620
|
$154.500
|
$116.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
10.000
|
$123.780
|
$206.000
|
$116.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$205.570
|
$206.000
|
$152.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
10.000
|
$151.910
|
$206.000
|
$152.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
25.000
|
$108.230
|
$154.500
|
$116.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$411.350
|
$824.000
|
$707.000
|
$800.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
8.000
|
$412.020
|
$824.000
|
$707.000
|
$800.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
1.000
|
$3.250
|
$3.090
|
$227.000
|
$3.000
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
10.000
|
$106.670
|
$154.500
|
$227.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$128.920
|
$103.000
|
$227.000
|
$100.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$0.690
|
$1.090
|
$1.000
|
$0.800
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
100.000
|
$2.230
|
$3.090
|
$2.300
|
$3.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
50.000
|
$4.120
|
$6.180
|
$5.040
|
$6.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$77.220
|
$97.850
|
$116.000
|
$95.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
12,000.000
|
$0.530
|
$0.800
|
$0.860
|
$0.650
|
|
|
PAVEMENT SEALER 6"
|
LF
|
36,000.000
|
$0.060
|
$0.210
|
$0.140
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,000.000
|
$0.110
|
$0.410
|
$0.180
|
$0.400
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,000.000
|
$0.230
|
$1.030
|
$0.450
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,000.000
|
$0.320
|
$2.060
|
$0.910
|
$2.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
10.000
|
$16.740
|
$25.750
|
$31.000
|
$25.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
25.000
|
$12.460
|
$25.750
|
$31.000
|
$25.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
10.000
|
$28.240
|
$25.750
|
$116.000
|
$25.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
10.000
|
$13.860
|
$25.750
|
$46.000
|
$25.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$17.920
|
$25.750
|
$61.000
|
$25.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
10.000
|
$14.990
|
$25.750
|
$61.000
|
$25.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
8.000
|
$88.670
|
$103.000
|
$132.000
|
$100.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
8.000
|
$86.860
|
$103.000
|
$132.000
|
$100.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$14.360
|
$25.750
|
$96.000
|
$25.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
1.000
|
$2.040
|
$1.030
|
$81.000
|
$1.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
1.000
|
$6.770
|
$25.750
|
$96.000
|
$25.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,000.000
|
$0.410
|
$0.700
|
$0.710
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
20,000.000
|
$0.380
|
$0.700
|
$0.710
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
500.000
|
$0.420
|
$0.700
|
$0.910
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
20,000.000
|
$0.380
|
$0.700
|
$0.710
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
2.000
|
$160.540
|
$144.200
|
$177.000
|
$140.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$267.600
|
$257.500
|
$237.000
|
$250.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$2.870
|
$4.120
|
$10.000
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
100.000
|
$3.680
|
$4.120
|
$10.000
|
$4.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
100.000
|
$5.110
|
$10.300
|
$10.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$3.880
|
$5.150
|
$10.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$3.730
|
$5.150
|
$5.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
100.000
|
$0.220
|
$0.250
|
$4.030
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,042,500.000
|
$0.210
|
$0.010
|
$0.010
|
$0.180
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
315,000.000
|
$0.280
|
$0.010
|
$0.100
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
16,000.000
|
$0.670
|
$1.030
|
$0.760
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,100.000
|
$0.990
|
$2.060
|
$1.710
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
35.000
|
$26.070
|
$51.500
|
$46.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
25.000
|
$41.970
|
$51.500
|
$86.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
1.000
|
$57.750
|
$51.500
|
$86.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$29.770
|
$51.500
|
$66.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
8.000
|
$184.080
|
$283.250
|
$182.000
|
$275.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
8.000
|
$183.870
|
$283.250
|
$182.000
|
$275.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$76.820
|
$206.000
|
$86.000
|
$200.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$41.850
|
$51.500
|
$173.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
10.000
|
$93.750
|
$82.400
|
$230.000
|
$80.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
1.000
|
$45.090
|
$51.500
|
$96.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,042,500.000
|
$0.020
|
$0.010
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
315,000.000
|
$0.040
|
$0.010
|
$0.040
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
7,000.000
|
$0.100
|
$0.050
|
$0.070
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,100.000
|
$0.140
|
$0.100
|
$0.340
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
35.000
|
$6.210
|
$10.300
|
$46.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
25.000
|
$7.990
|
$10.300
|
$31.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$12.020
|
$10.300
|
$56.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$8.970
|
$10.300
|
$46.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
2.000
|
$5.960
|
$10.300
|
$86.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
50.000
|
$8.510
|
$10.300
|
$59.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
8.000
|
$23.610
|
$51.500
|
$71.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
8.000
|
$23.180
|
$51.500
|
$71.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$9.470
|
$10.300
|
$86.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
1.000
|
$5.110
|
$51.500
|
$76.000
|
$50.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
10,000.000
|
$2.480
|
$1.500
|
$3.000
|
$1.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
2,552.000
|
$43.000
|
$33.000
|
$32.000
|
$46.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
1,008.000
|
$43.000
|
$33.000
|
$32.000
|
$48.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
4.000
|
$43.000
|
$33.000
|
$32.000
|
$48.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
16.800
|
$43.000
|
$33.000
|
$32.000
|
$48.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
24.000
|
$43.000
|
$33.000
|
$32.000
|
$48.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
15.200
|
$43.000
|
$33.000
|
$32.000
|
$48.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
200.000
|
$205.560
|
$150.000
|
$130.000
|
$150.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
4.000
|
$14.090
|
$50.000
|
$30.000
|
$100.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$1,624.750
|
$3,875.000
|
$4,900.000
|
$5,500.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
48.000
|
$1,370.430
|
$2,600.000
|
$4,900.000
|
$5,500.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
24.000
|
$725.830
|
$1,900.000
|
$1,500.000
|
$2,500.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
24.000
|
$780.000
|
$1,900.000
|
$1,500.000
|
$2,500.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
24.000
|
$533.710
|
$900.000
|
$250.000
|
$1,000.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
|
CYC
|
24.000
|
$626.800
|
$650.000
|
$250.000
|
$1,000.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
24.000
|
$570.000
|
$650.000
|
$250.000
|
$1,000.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
24.000
|
$370.000
|
$650.000
|
$250.000
|
$1,000.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
50,000.000
|
$0.280
|
$1.420
|
$1.000
|
$1.500
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
48.000
|
$2,402.960
|
$3,675.000
|
$3,850.000
|
$5,000.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
48.000
|
$1,062.110
|
$2,730.000
|
$2,880.000
|
$4,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
48.000
|
$2,348.510
|
$3,675.000
|
$3,850.000
|
$5,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
48.000
|
$1,060.260
|
$2,730.000
|
$2,880.000
|
$4,000.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
24.000
|
$2,043.610
|
$4,200.000
|
$4,750.000
|
$5,000.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
24.000
|
$2,122.110
|
$3,675.000
|
$4,050.000
|
$5,000.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
48.000
|
$1,768.770
|
$3,045.000
|
$2,760.000
|
$5,000.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
48.000
|
$1,521.670
|
$2,520.000
|
$2,240.000
|
$4,500.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
48.000
|
$745.000
|
$1,023.750
|
$1,070.000
|
$1,500.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
48.000
|
$875.000
|
$1,260.000
|
$1,300.000
|
$2,000.000
|
|
|
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
|
LS
|
1.000
|
$41,000.000
|
$28,000.000
|
$30,000.000
|
$50,000.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
50.000
|
$0.690
|
$10.000
|
$2.000
|
$10.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
10.000
|
$2,258.170
|
$1,500.000
|
$500.000
|
$1,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
15.000
|
$69.610
|
$50.000
|
$200.000
|
$100.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
15.000
|
$131.540
|
$100.000
|
$50.000
|
$125.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$180.210
|
$100.000
|
$50.000
|
$125.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$213.790
|
$100.000
|
$50.000
|
$125.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$220.690
|
$100.000
|
$50.000
|
$200.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$319.410
|
$200.000
|
$50.000
|
$200.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$317.230
|
$200.000
|
$50.000
|
$200.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
800.000
|
$68.390
|
$70.000
|
$70.000
|
$100.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
1.000
|
$1,805.560
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
2.000
|
$480.000
|
$550.000
|
$550.000
|
$500.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
1.000
|
$238.750
|
$325.000
|
$330.000
|
$500.000
|
|
|
SUMP CLEANING
|
EA
|
1.000
|
$532.610
|
$550.000
|
$550.000
|
$1,000.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
300.000
|
$2.790
|
$3.500
|
$3.000
|
$4.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
15,000.000
|
$4.170
|
$4.400
|
$4.000
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
45,000.000
|
$4.740
|
$5.250
|
$5.000
|
$4.500
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
7,500.000
|
$5.700
|
$8.400
|
$8.000
|
$12.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
1,000.000
|
$7.670
|
$9.500
|
$9.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
30.000
|
$7.580
|
$5.000
|
$10.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
30.000
|
$9.830
|
$10.000
|
$15.000
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
30.000
|
$10.500
|
$10.000
|
$20.000
|
$30.000
|
|
|
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
|
LF
|
30.000
|
$20.920
|
$15.000
|
$30.000
|
$40.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
100.000
|
$9.470
|
$13.500
|
$11.000
|
$15.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
100.000
|
$11.760
|
$15.500
|
$13.000
|
$30.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$16.510
|
$16.500
|
$16.000
|
$30.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
1,000.000
|
$28.170
|
$19.000
|
$18.000
|
$30.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
100.000
|
$22.390
|
$10.000
|
$20.000
|
$20.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
25.000
|
$11.630
|
$15.000
|
$30.000
|
$30.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
25.000
|
$4.430
|
$10.000
|
$11.000
|
$10.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$15.360
|
$14.000
|
$14.000
|
$15.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
3.000
|
$9.680
|
$125.000
|
$50.000
|
$500.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
3.000
|
$7.830
|
$125.000
|
$50.000
|
$500.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
500.000
|
$15.740
|
$10.000
|
$5.000
|
$20.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
200.000
|
$42.780
|
$35.000
|
$30.000
|
$75.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
150.000
|
$48.630
|
$50.000
|
$50.000
|
$200.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$196.430
|
$20.000
|
$100.000
|
$200.000
|
|
|
REALIGN POSTS
|
EA
|
200.000
|
$10.530
|
$12.000
|
$5.000
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,000.000
|
$23.100
|
$24.000
|
$22.000
|
$30.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$53.670
|
$50.000
|
$45.000
|
$50.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
5.000
|
$3,200.520
|
$3,200.000
|
$3,000.000
|
$3,000.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
75.000
|
$963.400
|
$900.000
|
$975.000
|
$1,000.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$99.250
|
$100.000
|
$100.000
|
$200.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
35.000
|
$110.910
|
$75.000
|
$120.000
|
$500.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
35.000
|
$97.000
|
$75.000
|
$120.000
|
$500.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$81.040
|
$75.000
|
$125.000
|
$500.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
5.000
|
$19.650
|
$30.000
|
$22.000
|
$500.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$64.480
|
$20.000
|
$200.000
|
$100.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$18,166.670
|
$5,000.000
|
$20,000.000
|
$20,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$27,500.000
|
$5,000.000
|
$25,000.000
|
$25,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
3.000
|
$2,500.000
|
$100.000
|
$2,000.000
|
$2,500.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
1.000
|
$4,300.000
|
$100.000
|
$2,000.000
|
$4,000.000
|
|
|
REPAIR (CATCB - FRNT SECT)
|
EA
|
1.000
|
$100.000
|
$100.000
|
$100.000
|
$500.000
|
|
|
REPAIR (CATCB - REAR SECT)
|
EA
|
1.000
|
$100.000
|
$100.000
|
$100.000
|
$500.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
1.000
|
$1,116.670
|
$1,200.000
|
$1,500.000
|
$3,000.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
7.000
|
$1,069.900
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
3.000
|
$66.780
|
$100.000
|
$500.000
|
$500.000
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
2.000
|
$62.630
|
$100.000
|
$500.000
|
$500.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
2.000
|
$256.250
|
$100.000
|
$1,000.000
|
$500.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
2.000
|
$3,007.410
|
$2,000.000
|
$3,300.000
|
$2,500.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
5.000
|
$2,666.670
|
$2,000.000
|
$1,600.000
|
$2,000.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
8.000
|
$1,420.690
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
8.000
|
$2,964.290
|
$2,800.000
|
$3,300.000
|
$2,000.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
3.000
|
$1,650.000
|
$2,250.000
|
$1,900.000
|
$2,000.000
|
|
|
REPAIR TAU II (N)
|
LF
|
35.000
|
$94.460
|
$300.000
|
$200.000
|
$200.000
|
|
|
REPAIR TAU II (W)
|
LF
|
5.000
|
$77.180
|
$250.000
|
$500.000
|
$200.000
|
|
|
REPAIR TAU II (W) (MISC HARDWARE)
|
EA
|
1.000
|
$2,200.000
|
$1,500.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
1.000
|
$2,608.330
|
$2,000.000
|
$1,900.000
|
$4,500.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
15.000
|
$70.000
|
$20.000
|
$125.000
|
$200.000
|
|
|
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
|
LF
|
15.000
|
$90.000
|
$20.000
|
$100.000
|
$200.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
50.000
|
$186.590
|
$500.000
|
$250.000
|
$300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
75.000
|
$111.610
|
$475.000
|
$90.000
|
$200.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$585.870
|
$200.000
|
$300.000
|
$600.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
200.000
|
$316.550
|
$450.000
|
$225.000
|
$300.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
10.000
|
$244.720
|
$250.000
|
$300.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$294.250
|
$430.000
|
$2,500.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$50.350
|
$75.000
|
$250.000
|
$100.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
25.000
|
$4.720
|
$5.000
|
$5.000
|
$10.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
100.000
|
$15.690
|
$50.000
|
$40.000
|
$60.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
400.000
|
$20.160
|
$40.000
|
$40.000
|
$40.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
25.000
|
$59.000
|
$80.000
|
$60.000
|
$120.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$15,500.000
|
$10,000.000
|
$5,000.000
|
$20,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$44.570
|
$40.000
|
$40.000
|
$50.000
|
|
Totals: |
$4,644,055.030
|
$4,981,840.170
|
$5,449,318.000
|
$6,283,140.000
|