HARRIS IH0010 (6365-44-001)

Items: 64

County: HARRIS
Length: N/A
Highway: IH0010
District: HOUSTON
Control Number: 6365-44-001
DBE Goal: N/A
Project: RMC - 636544001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,070,711.25
Date: 12/03/2020 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,070,711.25
$939,677.00
Over/Under Est: -12.24% -$131,034.25
Over/Under Est: -7.3% -$78,200.00
Amt Left: 5.62% $52,834.25

Bid Items & Bid Tabulations

64 Total 0 of 64
HARRIS  |  IH0010  |  HOUSTON  |  6365-44-001  |  12/03/2020  |  $1,070,711.25  |  RMC - 636544001  |  GUARDRAIL REPAIRS  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $55.000 $80.000 $35.000
CONC STR REPAIR (STANDARD)
SF 300.000 $65.000 $70.000 $60.000
RIPRAP (MOW STRIP)(4 IN)
CY 150.000 $500.000 $350.000 $350.000
MOBILIZATION (CALLOUT)
EA 20.000 $250.000 $200.000 $200.000
MOBILIZATION (EMERGENCY)
EA 6.000 $350.000 $1,000.000 $300.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 3,000.000 $4.500 $3.000 $3.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 60.000 $22.000 $25.000 $25.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 60.000 $22.000 $25.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,450.000 $2,300.000 $1,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 40.000 $1,500.000 $950.000 $500.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $1,000.000 $500.000 $2,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $1,600.000 $2,500.000 $500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $400.000 $200.000 $500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 400.000 $15.000 $18.000 $15.000
CHAIN LINK FENCE GATE (INSTALL)(6'X16')
EA 1.000 $1,100.000 $500.000 $1,000.000
CHAIN LINK FENCE GATE (INSTALL)(6'X10')
EA 1.000 $1,100.000 $500.000 $1,000.000
CHAIN LINK FENCE GATE (INSTALL)(6'X18')
EA 1.000 $1,300.000 $500.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 3,000.000 $5.000 $3.500 $4.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3,000.000 $4.000 $3.500 $3.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 2,000.000 $10.000 $4.000 $4.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 1,000.000 $25.000 $10.000 $13.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 300.000 $25.000 $10.000 $13.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $13.000 $14.000 $10.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $20.000 $20.000 $15.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 31.250 $25.000 $20.000 $25.000
RAISE RAIL ELEMENT
LF 1,000.000 $5.000 $4.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 20.000 $30.000 $40.000 $27.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 900.000 $45.000 $41.000 $45.000
REALIGN POSTS
EA 50.000 $12.000 $6.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $22.000 $4.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $25.000 $20.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $55.000 $50.000 $120.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 1.000 $20.000 $1.000 $20.000
REPLACE TERMINAL ANCHOR POSTS
EA 1.000 $20.000 $1.000 $20.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 2.000 $1,600.000 $3,000.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $950.000 $825.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $95.000 $50.000 $90.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $90.000 $65.000 $150.000
REPLACE SGT CABLE ANCHOR
EA 30.000 $90.000 $50.000 $150.000
REPLACE SGT STRUT
EA 15.000 $80.000 $50.000 $250.000
REPLACE SGT OBJECT MARKER
EA 50.000 $40.000 $25.000 $40.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $17,000.000 $19,000.000 $15,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $23,000.000 $25,000.000 $20,000.000
REPAIR (TRACC)
EA 1.000 $1,500.000 $2,000.000 $1,750.000
REMOVE AND REPLACE (WIDE QUAD)
EA 1.000 $15,000.000 $23,000.000 $13,000.000
REPAIR (WIDE QUAD)
EA 1.000 $1,000.000 $1,100.000 $1,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 100.000 $1,200.000 $650.000 $1,250.000
REPAIR REACT (N) (CYLINDERS)
EA 50.000 $2,500.000 $3,000.000 $2,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $1,200.000 $500.000 $1,500.000
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $2,500.000 $2,500.000 $2,750.000
REMOVE AND REPLACE (SMTC) (N)
EA 3.000 $20,000.000 $22,000.000 $15,000.000
REPAIR (SMTC) (N)
EA 5.000 $3,000.000 $750.000 $4,000.000
REMOVE AND REPLACE (HEART)
EA 1.000 $22,000.000 $5,000.000 $15,000.000
REPAIR HEART (MISC HARDWARE)
EA 1.000 $4,000.000 $2,000.000 $5,000.000
REPAIR TAU II (N)
LF 94.000 $100.000 $100.000 $75.000
REPAIR TAU II (W)
LF 100.000 $100.000 $100.000 $75.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $24,000.000 $24,000.000 $15,000.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 1.000 $2,700.000 $1,200.000 $3,000.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 3.000 $3,500.000 $3,000.000 $4,000.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 2.000 $15,000.000 $20,000.000 $22,000.000
REPAIR (TAU)(MASH)(N)
EA 3.000 $2,500.000 $2,000.000 $4,000.000
REPAIR (EXISTING METAL PED. RAIL)
LF 100.000 $95.000 $50.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 4.000 $100.000 $100.000 $150.000
TMA (STATIONARY)
DAY 100.000 $200.000 $190.000 $300.000
Totals: $1,070,711.250 $939,677.000 $992,511.250