Show Job Controls
Bid Cobra

HARRIS SH0249 (6354-04-001)

Items: 66

County: HARRIS
Length: N/A
Highway: SH0249
District: HOUSTON
Control Number: 6354-04-001
DBE Goal: N/A
Project: RMC - 635404001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $591,009.98
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$591,009.98
$532,256.00
Over/Under Est: -9.94% -$58,753.98
Over/Under Est: -2.17% -$12,824.98
Amt Left: 8.63% $45,929.00

Bid Items & Bid Tabulations

66 Total 0 of 66
HARRIS  |  SH0249  |  HOUSTON  |  6354-04-001  |  03/04/2020  |  $591,009.98  |  RMC - 635404001  |  GUARDRAIL REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (RIPRAP)
SY 100.000 $28.370 $5.000 $5.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $95.000 $75.000 $50.000
CONC STR REPAIR (STANDARD)
SF 150.000 $95.000 $80.000 $65.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $608.120 $350.000 $350.000
MOBILIZATION (CALLOUT)
EA 24.000 $728.810 $200.000 $200.000
MOBILIZATION (EMERGENCY)
EA 4.000 $750.000 $500.000 $300.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $40.000 $10.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 90.000 $8.240 $5.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 60.000 $24.820 $10.000 $1.000
PTB (DES SOURCE)(TY P&P)
LF 60.000 $40.000 $10.000 $10.000
PTB (MOVE)(TY P&P)
LF 60.000 $8.240 $5.000 $10.000
PTB (STKPL)(TY P&P)
LF 60.000 $24.820 $5.000 $10.000
PORT CTB (ALIGNING)
LF 600.000 $15.770 $4.000 $15.000
CONC CURB (TY II)
LF 20.000 $10.300 $5.000 $5.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,383.420 $2,200.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,140.160 $1,060.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $172.450 $1.000 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,100.000 $500.000 $500.000
CHAIN LINK FENCE (REPAIR) (6')
LF 50.000 $18.030 $20.000 $15.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $5.000 $2.000 $1.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2,000.000 $8.380 $4.000 $8.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 40.000 $10.000 $10.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 2,000.000 $6.370 $4.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 100.000 $10.890 $4.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 15.000 $10.000 $10.000 $15.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $0.330 $0.300 $0.250
GRAFFITI REMOVAL (BLAST CLEANING)
SF 3,000.000 $1.110 $0.250 $1.000
GRAFFITI REMOVAL (PAINTING)
SF 5,000.000 $1.520 $1.000 $1.000
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 100.000 $1.050 $0.100 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,500.000 $14.400 $14.000 $14.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 35.000 $25.000 $10.000 $24.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $25.000 $10.000 $26.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $27.000 $19.000 $20.000
RAISE RAIL ELEMENT
LF 50.000 $12.000 $11.000 $7.000
REALIGN EXISTING RAIL
LF 500.000 $7.150 $8.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 40.000 $38.740 $34.000 $35.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 160.000 $40.550 $44.000 $50.000
REALIGN POSTS
EA 30.000 $9.590 $11.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $20.000 $23.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 400.000 $55.850 $80.000 $65.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $26.000 $1.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 1.000 $2,723.200 $3,100.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 55.000 $822.350 $900.000 $975.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $100.000 $100.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 40.000 $76.820 $80.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $75.000 $80.000 $80.000
REPLACE SGT STRUT
EA 40.000 $68.600 $90.000 $80.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $25.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $78.130 $60.000 $10.000
REPAIR (TRACC)
LF 25.000 $100.000 $60.000 $95.000
REPAIR REACT (N) (MISC HARDWARE)
EA 20.000 $989.030 $1,000.000 $1,200.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $2,508.230 $3,000.000 $2,900.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,000.000 $500.000 $950.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $1,633.330 $2,000.000 $950.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 10.000 $1,100.000 $1,200.000 $1,200.000
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $2,385.260 $3,000.000 $2,500.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $19,975.000 $20,000.000 $20,000.000
REPAIR (SMTC) (N)
EA 4.000 $3,516.660 $1,000.000 $1,900.000
REMOVE AND REPLACE (SMTC) (W)
EA 2.000 $30,608.330 $25,000.000 $28,000.000
REPAIR (SMTC) (W)
EA 4.000 $3,461.110 $1,000.000 $2,400.000
REPAIR REACT (W) (DIAPHRAGM)
EA 2.000 $500.000 $100.000 $450.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 2.000 $1,533.330 $2,000.000 $1,000.000
CONCRETE RAIL REPAIR (MISC)
LF 50.000 $156.340 $60.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $100.000 $90.000 $25.000
TMA (STATIONARY)
DAY 50.000 $237.360 $275.000 $400.000
Totals: $591,009.980 $532,256.000 $578,185.000