HARRIS IH0610 (6353-13-001)

Items: 386

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6353-13-001
DBE Goal: N/A
Project: RMC - 635313001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $9,806,211.00
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: GENERAL MAINTENANCE HOU METRO AREA
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$9,806,211.00
$8,697,813.75
Over/Under Est: -11.3% -$1,108,397.25
$9,378,458.29
Over/Under Est: -4.36% -$427,752.71
Amt Left: 7.83% $680,644.54
$10,140,371.00
Over/Under Est: 3.41% $334,160.00
Amt Left: 16.59% $1,442,557.25
Delta: -8.12% -$761,912.71
Over/Under Est: 17.62% $1,727,907.95
Amt Left: 32.61% $2,836,305.20
Delta: -13.74% -$1,393,747.95

Bid Items & Bid Tabulations

386 Total 0 of 386
HARRIS  |  IH0610  |  HOUSTON  |  6353-13-001  |  06/04/2020  |  $9,806,211.00  |  RMC - 635313001  |  GENERAL MAINT HOU METRO AREA  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
MBN ENTERPRISES LLC
DBI SERVICES, LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (SIDEWALKS)
SY 100.000 $18.000 $13.000 $30.000 $10.000 $10.000
REMOVING CONC (CURB)
LF 100.000 $1.000 $1.000 $30.000 $10.000 $10.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 4.000 $30.000 $20.000 $30.000 $250.000 $10.000
BLADING
STA 800.000 $100.000 $75.000 $40.000 $100.000 $115.000
BLADING
LF 7,000.000 $5.000 $4.000 $5.000 $3.000 $5.000
CEM TRT(PLNT MX) (CL L)(TY C)(GR 1-2)
TON 2.000 $70.000 $70.000 $70.000 $250.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 500.000 $45.000 $45.000 $40.000 $85.000 $65.000
FULL - DEPTH REPAIR CRCP (9")
SY 300.000 $350.000 $315.000 $290.000 $220.000 $305.000
FULL - DEPTH REPAIR CRCP (10")
SY 500.000 $350.000 $315.000 $300.000 $235.000 $315.000
FULL - DEPTH REPAIR CRCP (12")
SY 500.000 $350.000 $318.000 $320.000 $260.000 $330.000
FULL - DEPTH REPAIR CRCP (14")
SY 500.000 $350.000 $325.000 $340.000 $290.000 $355.000
FULL - DEPTH REPAIR CRCP (15")
SY 500.000 $350.000 $340.000 $360.000 $300.000 $375.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 100.000 $75.000 $100.000 $100.000 $70.000 $150.000
CONC STR REPAIR (STANDARD)
SF 100.000 $70.000 $100.000 $100.000 $50.000 $125.000
RIPRAP (CONC)(5 IN)
CY 10.000 $450.000 $450.000 $400.000 $140.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $500.000 $400.000 $400.000 $140.000 $400.000
CLEANING AND SEALING EXISTING JOINTS
LF 225.000 $25.000 $35.000 $25.000 $20.000 $25.000
CLEANING EXISTING JOINTS
LF 225.000 $5.000 $10.000 $10.000 $5.000 $10.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 150.000 $300.000 $250.000 $200.000 $115.000 $300.000
INLET (COMPL)(TY AZ)
EA 2.000 $2,500.000 $2,000.000 $2,500.000 $2,000.000 $3,500.000
INLET (COMPL)(EXT TY C)
EA 4.000 $1,000.000 $950.000 $4,000.000 $800.000 $1,000.000
INLET (STG II)(TY C)
EA 4.000 $1,100.000 $1,000.000 $2,000.000 $800.000 $1,400.000
MANH (STG II)(TY A)
EA 4.000 $1,100.000 $1,000.000 $1,500.000 $1,000.000 $1,250.000
REMOV STR (INLET)
EA 4.000 $300.000 $300.000 $300.000 $100.000 $350.000
REMOV STR (MANHOLE)
EA 4.000 $200.000 $200.000 $300.000 $100.000 $200.000
MOBILIZATION (CALLOUT)
EA 50.000 $100.000 $250.000 $500.000 $400.000 $2,250.000
MOBILIZATION (EMERGENCY)
EA 50.000 $200.000 $250.000 $1,000.000 $800.000 $2,750.000
PORT CTB (DES SOURCE)(SAFETY SH)
LF 150.000 $5.000 $5.000 $15.000 $10.000 $14.000
PORT CTB (MOVE)(SAFETY SH)
LF 1,200.000 $7.000 $7.000 $20.000 $5.000 $10.000
PORT CTB (STKPL)(SAFETY SH)
LF 150.000 $5.000 $5.000 $15.000 $10.000 $15.000
LANDSCAPE PAVERS
SY 150.000 $88.000 $88.000 $70.000 $20.000 $75.000
REMOVE AND RELAY PAVERS
SY 200.000 $55.000 $55.000 $45.000 $15.000 $50.000
CONC CURB (MONO) (TY I)
LF 300.000 $3.000 $3.000 $7.000 $10.000 $15.000
CONC CURB (MONO) (TY II)
LF 300.000 $3.000 $3.000 $12.000 $10.000 $20.000
CONC CURB (U-TURN)
LF 1,000.000 $40.000 $40.000 $40.000 $10.000 $40.000
CONC CURB (DOWEL)
LF 300.000 $12.000 $12.000 $10.000 $20.000 $15.000
CONC SIDEWALKS (4")
SY 250.000 $65.000 $60.000 $60.000 $15.000 $60.000
CURB RAMPS (TY 1)
EA 2.000 $2,200.000 $2,200.000 $2,000.000 $1,000.000 $1,750.000
CURB RAMPS (TY 7)
EA 2.000 $2,200.000 $2,200.000 $2,000.000 $1,000.000 $1,750.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,200.000 $2,400.000 $2,300.000 $1,000.000 $1,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,075.000 $1,100.000 $1,500.000 $850.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $10.000 $5.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $1.000 $1.000 $200.000 $100.000 $100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $450.000 $450.000 $500.000 $500.000 $250.000
CHAIN LINK FENCE (INSTALL) (6')
LF 150.000 $25.000 $20.000 $25.000 $12.000 $25.000
CHAIN LINK FENCE (REPAIR) (6')
LF 450.000 $20.000 $20.000 $20.000 $12.000 $22.000
CHAIN LINK FENCE (REMOVE)
LF 500.000 $1.000 $1.000 $5.000 $5.000 $2.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $800.000 $500.000 $2,000.000 $500.000 $750.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 1.000 $900.000 $500.000 $1,000.000 $500.000 $750.000
GATE (REMOVE)
EA 1.000 $200.000 $180.000 $500.000 $100.000 $500.000
GATE (INSTALL)(SINGLE)(6' X 24')
EA 1.000 $1,100.000 $800.000 $2,000.000 $600.000 $1,000.000
GATE (INSTALL)(DOUBLE)(6' X 16')
EA 1.000 $1,500.000 $1,200.000 $2,000.000 $550.000 $1,000.000
GATE (REPAIR)(SINGLE)(6' X 24')
EA 1.000 $700.000 $650.000 $1,000.000 $600.000 $750.000
GATE (REPAIR)(DOUBLE)(6' X 16')
EA 1.000 $800.000 $650.000 $1,000.000 $550.000 $750.000
ALUMINUM SIGNS (TY A)
SF 750.000 $18.000 $18.000 $25.000 $20.000 $30.000
ALUMINUM SIGNS (TY G)
SF 300.000 $18.000 $18.000 $25.000 $22.000 $50.000
ALUMINUM SIGNS (TY O)
SF 500.000 $20.000 $20.000 $75.000 $22.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 20.000 $45.000 $45.000 $45.000 $25.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,000.000 $7.000 $5.000 $35.000 $6.000 $15.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 1,000.000 $12.000 $7.000 $35.000 $9.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $7.000 $5.000 $35.000 $7.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 1,000.000 $12.000 $7.000 $40.000 $9.000 $30.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,500.000 $0.550 $0.650 $1.060 $1.060 $1.070
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 2,500.000 $0.820 $0.900 $1.590 $1.590 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 25,000.000 $0.820 $0.900 $0.800 $0.870 $0.800
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 20,000.000 $2.150 $2.400 $2.660 $2.650 $2.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 20,000.000 $2.100 $2.400 $3.190 $4.240 $3.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 10,000.000 $3.300 $3.800 $6.380 $6.960 $6.400
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 300.000 $112.000 $126.000 $132.820 $132.000 $135.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 100.000 $122.000 $138.000 $159.380 $159.000 $160.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 105.000 $112.000 $126.000 $159.380 $159.000 $160.000
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 50.000 $112.000 $126.000 $159.380 $159.000 $160.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $112.000 $126.000 $185.940 $247.000 $190.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 300.000 $112.000 $126.000 $132.820 $132.000 $135.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $408.000 $457.000 $531.260 $707.000 $540.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 18.000 $408.000 $457.000 $531.260 $707.000 $540.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 20.000 $433.000 $485.000 $531.260 $530.000 $540.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 4.000 $112.000 $125.000 $531.270 $530.000 $540.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 4.000 $76.000 $86.000 $106.250 $106.000 $110.000
RFL PAV MRK TY I(W)BIKE RR XING(100MIL)
EA 4.000 $76.000 $86.000 $106.250 $106.000 $110.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 4.000 $76.000 $86.000 $106.250 $106.000 $110.000
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
EA 4.000 $76.000 $86.000 $106.250 $106.000 $110.000
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
EA 4.000 $76.000 $86.000 $21.250 $21.000 $21.500
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 4,500.000 $0.680 $0.750 $0.850 $1.130 $0.850
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 5,000.000 $1.650 $1.900 $3.190 $4.240 $3.250
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 6,500.000 $3.200 $3.700 $4.250 $4.240 $4.300
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,000.000 $0.820 $0.900 $0.690 $0.680 $0.700
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 100.000 $21.000 $23.000 $10.630 $10.000 $10.750
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 100.000 $36.000 $40.000 $10.630 $10.000 $10.750
PAVEMENT SEALER 6"
LF 22,500.000 $0.040 $0.050 $0.210 $0.280 $0.220
PAVEMENT SEALER 8"
LF 22,500.000 $0.080 $0.100 $0.270 $0.350 $0.270
PAVEMENT SEALER 12"
LF 25,000.000 $0.160 $0.200 $1.060 $1.160 $1.080
PAVEMENT SEALER 24"
LF 12,500.000 $0.280 $0.320 $2.130 $2.120 $2.150
PAVEMENT SEALER (ARROW)
EA 300.000 $5.600 $6.300 $31.880 $31.000 $32.300
PAVEMENT SEALER (WORD)
EA 300.000 $7.850 $6.300 $31.880 $31.000 $32.300
PAVEMENT SEALER (DBL ARROW)
EA 100.000 $7.850 $8.800 $42.500 $42.000 $43.000
PAVEMENT SEALER (UTURN ARROW)
EA 100.000 $5.600 $8.800 $42.500 $42.000 $43.000
PAVEMENT SEALER (LNDP ARROW)
EA 2.000 $5.600 $6.300 $42.500 $56.000 $43.000
PAVEMENT SEALER (U-L ARROW)
EA 500.000 $40.000 $6.300 $42.500 $42.000 $43.000
PAVEMENT SEALER (ENTR GORE)
EA 18.000 $40.000 $45.000 $106.250 $141.000 $108.000
PAVEMENT SEALER (EXIT GORE)
EA 18.000 $5.600 $45.000 $106.250 $141.000 $108.000
PAVEMENT SEALER (SYMBOL)
EA 4.000 $40.000 $6.300 $63.750 $63.000 $65.000
PAVEMENT SEALER (RR XING)
EA 20.000 $5.600 $45.000 $159.380 $159.000 $160.000
PAVEMENT SEALER (YLD TRI)
EA 100.000 $5.600 $6.300 $15.940 $15.000 $16.000
PAVEMENT SEALER (BIKE ARROW)
EA 4.000 $5.600 $6.300 $26.560 $26.000 $27.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 4.000 $5.600 $6.300 $26.560 $26.000 $27.000
PAVEMENT SEALER (BIKE WORD)
EA 4.000 $5.600 $6.300 $26.560 $26.000 $27.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,000.000 $0.560 $0.700 $0.480 $0.630 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 10,000.000 $0.560 $0.700 $0.480 $0.630 $0.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 5,000.000 $0.560 $0.650 $0.480 $0.470 $0.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 10,000.000 $0.560 $0.650 $0.480 $0.630 $0.500
PAVEMENT SEALER (BIKE RRX)
EA 4.000 $5.600 $6.300 $159.380 $159.000 $160.000
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 4.000 $3,160.000 $3,600.000 $3,187.590 $3,181.000 $3,250.000
REFL PAV MRKR TY I-C
EA 1,250.000 $4.000 $4.500 $4.250 $4.240 $5.000
REFL PAV MRKR TY I-R
EA 500.000 $4.000 $4.500 $4.250 $4.240 $5.000
REFL PAV MRKR TY II-A-A
EA 1,750.000 $4.000 $4.500 $4.250 $4.640 $5.000
REFL PAV MRKR TY II-C-R
EA 2,550.000 $4.000 $4.500 $4.250 $5.650 $5.000
ELIM EXT PAV MRK & MRKS (6")
LF 22,500.000 $0.180 $0.250 $0.480 $0.630 $0.480
ELIM EXT PAV MRK & MRKS (8")
LF 22,500.000 $0.240 $0.300 $0.720 $0.960 $0.730
ELIM EXT PAV MRK & MRKS (12")
LF 25,000.000 $0.300 $0.700 $1.590 $1.740 $1.600
ELIM EXT PAV MRK & MRKS (24")
LF 12,500.000 $0.500 $1.400 $3.190 $3.480 $3.250
ELIM EXT PAV MRK & MRKS (ARROW)
EA 300.000 $12.200 $14.000 $63.750 $63.000 $65.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 100.000 $18.200 $21.000 $63.750 $63.000 $65.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 300.000 $12.200 $14.000 $63.750 $63.000 $65.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 18.000 $117.000 $130.000 $63.750 $84.000 $65.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 18.000 $117.000 $130.000 $63.750 $84.000 $65.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 20.000 $117.000 $23.000 $63.750 $63.000 $65.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 4.000 $23.000 $25.000 $63.750 $63.000 $65.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 4.000 $23.000 $36.000 $106.250 $106.000 $108.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 4.000 $5.600 $6.300 $53.130 $53.000 $55.000
ELIM EXT PAV MRK & MARKS (BIKE RR XING)
EA 4.000 $5.600 $6.300 $53.130 $53.000 $55.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 4.000 $5.600 $6.300 $53.130 $53.000 $55.000
ELIM EXT PAV MRK & MARKS (BIKE WORD)
EA 4.000 $5.600 $6.300 $53.130 $53.000 $55.000
ELIM EXT PAV MRK & MARKS (BIKE DOT)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $10.750
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 105.000 $12.200 $14.000 $53.130 $53.000 $55.000
ELIM EXT PAV MRK & MRKS (UTRN/LT ARR)
EA 50.000 $12.200 $14.000 $53.130 $53.000 $55.000
PAV SURF PREP FOR MRK (6")
LF 3,375.000 $0.040 $0.100 $0.110 $0.140 $0.150
PAV SURF PREP FOR MRK (8")
LF 3,375.000 $0.080 $0.100 $0.160 $0.210 $0.200
PAV SURF PREP FOR MRK (12")
LF 3,750.000 $0.100 $0.200 $0.210 $0.280 $0.250
PAV SURF PREP FOR MRK (24")
LF 1,875.000 $0.100 $0.250 $0.430 $0.560 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 45.000 $5.600 $6.300 $15.940 $21.000 $20.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 15.000 $5.600 $6.300 $15.940 $21.000 $20.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 100.000 $5.600 $6.300 $15.940 $15.000 $20.000
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 500.000 $5.600 $6.300 $15.940 $15.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 45.000 $5.600 $6.250 $15.940 $21.000 $20.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 3.000 $31.000 $35.000 $26.560 $35.000 $30.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 3.000 $31.000 $35.000 $26.560 $35.000 $30.000
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $31.000 $35.000 $26.560 $26.000 $30.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 100.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 100.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 4.000 $5.600 $6.300 $53.130 $53.000 $60.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (BIKE RR XING)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (BIKE WORD)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (BIKE DOT)
EA 4.000 $5.600 $6.300 $10.630 $10.000 $15.000
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 19,125.000 $0.310 $0.350 $0.270 $0.260 $0.300
PAV SURF PREP FOR MRK (BLAST CLN)(8")
LF 19,125.000 $0.360 $0.400 $0.320 $0.310 $0.350
PAV SURF PREP FOR MRK (BLAST CLN)(12")
LF 21,250.000 $0.250 $0.520 $0.530 $0.530 $0.600
PAV SURF PREP FOR MRK (BLAST CLN)(24")
LF 10,625.000 $0.450 $1.000 $1.060 $1.060 $1.250
PV SURF PREP FOR MRK (BLST CLN)(ARRWS)
EA 255.000 $16.000 $17.000 $21.250 $21.000 $25.000
PV SURF PREP MRKS (BLST CLN)(DBL ARW)
EA 85.000 $26.000 $29.000 $21.250 $21.000 $25.000
PV SRF PRP FOR MRK (BLT CLN)(ENT GORE)
EA 15.000 $127.000 $143.000 $106.250 $106.000 $200.000
PV SRF PRP FOR MRK (BLT CLN)(EXT GORE)
EA 15.000 $127.000 $143.000 $106.250 $106.000 $200.000
PAV SURF PREP MRK (BLST CLN)(RR XING)
EA 16.000 $76.000 $86.000 $106.250 $106.000 $200.000
PV SURF PRP FOR MRK (BLST CLN)(WORDS)
EA 255.000 $56.000 $64.000 $106.250 $106.000 $175.000
POTHOLE REPAIR (STANDARD)
LB 5,000.000 $200.000 $5.000 $2.000 $90.000 $1.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 40,000.000 $2.400 $2.350 $3.000 $3.000 $3.000
SPOT MOWING
AC 50.000 $75.000 $50.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (1)
AC 385.600 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (2)
AC 248.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (3)
AC 60.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (4)
AC 60.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (5)
AC 120.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (6)
AC 1,152.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (7)
AC 32.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (8)
AC 528.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (9)
AC 40.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (12)
AC 1,928.000 $75.000 $72.000 $75.000 $70.000 $77.000
FULL - WIDTH MOWING - TRACT (14)
AC 72.000 $75.000 $72.000 $75.000 $70.000 $77.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 250.000 $280.000 $250.000 $300.000 $200.000 $200.000
LITTER REMOVAL (SPOT)
AC 50.000 $30.000 $60.000 $46.000 $100.000 $30.000
LITTER REMOVAL - TRACT (1)
CYC 52.000 $2,300.000 $2,200.000 $2,875.000 $1,975.000 $2,150.000
LITTER REMOVAL - TRACT (2)
CYC 52.000 $550.000 $525.000 $345.000 $1,371.000 $1,400.000
LITTER REMOVAL - TRACT (3)
CYC 52.000 $500.000 $500.000 $3,450.000 $710.000 $350.000
LITTER REMOVAL - TRACT (4)
CYC 52.000 $500.000 $500.000 $230.000 $710.000 $350.000
LITTER REMOVAL - TRACT (5)
CYC 52.000 $475.000 $475.000 $230.000 $832.000 $675.000
LITTER REMOVAL - TRACT (6)
CYC 52.000 $3,000.000 $3,000.000 $3,450.000 $5,434.000 $6,500.000
LITTER REMOVAL - TRACT (7)
CYC 52.000 $475.000 $480.000 $115.000 $710.000 $350.000
LITTER REMOVAL - TRACT (8)
CYC 52.000 $2,000.000 $1,900.000 $3,450.000 $2,595.000 $3,000.000
LITTER REMOVAL - TRACT (9)
CYC 52.000 $500.000 $550.000 $230.000 $710.000 $350.000
LITTER REMOVAL - TRACT (10)
CYC 1.000 $500.000 $500.000 $345.000 $832.000 $2,000.000
LITTER REMOVAL - TRACT (11)
CYC 1.000 $550.000 $600.000 $345.000 $710.000 $2,000.000
LITTER REMOVAL - TRACT (12)
CYC 52.000 $9,000.000 $8,000.000 $11,500.000 $8,927.000 $11,000.000
LITTER REMOVAL - TRACT (14)
CYC 52.000 $3,000.000 $1,700.000 $345.000 $832.000 $500.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 500.000 $60.000 $60.000 $75.000 $50.000 $350.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 24.000 $930.000 $930.000 $1,155.000 $809.000 $1,070.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 24.000 $230.000 $230.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 24.000 $200.000 $200.000 $155.000 $930.000 $1,600.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
CYC 24.000 $230.000 $230.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
CYC 24.000 $200.000 $200.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
CYC 24.000 $830.000 $830.000 $770.000 $809.000 $1,340.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
CYC 24.000 $160.000 $160.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
CYC 24.000 $830.000 $830.000 $770.000 $691.000 $1,340.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (9)
CYC 24.000 $200.000 $350.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (10)
CYC 1.000 $200.000 $160.000 $230.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (11)
CYC 1.000 $200.000 $160.000 $230.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (12)
CYC 24.000 $3,900.000 $3,800.000 $3,100.000 $2,053.000 $3,500.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (13)
CYC 24.000 $200.000 $650.000 $155.000 $401.000 $800.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (14)
CYC 24.000 $500.000 $650.000 $155.000 $407.000 $800.000
DEBRIS - FRONTAGE ROADS - AREA (1)
CYC 24.000 $470.000 $460.000 $1,155.000 $811.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (2)
CYC 24.000 $230.000 $220.000 $155.000 $418.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (3)
CYC 24.000 $135.000 $125.000 $1,155.000 $933.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (4)
CYC 24.000 $215.000 $205.000 $155.000 $429.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (6)
CYC 24.000 $530.000 $520.000 $155.000 $814.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (7)
CYC 24.000 $200.000 $190.000 $155.000 $441.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (8)
CYC 24.000 $530.000 $500.000 $1,155.000 $700.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (9)
CYC 24.000 $200.000 $1,000.000 $155.000 $452.000 $530.000
DEBRIS - FRONTAGE ROADS - AREA (12)
CYC 24.000 $1,500.000 $1,000.000 $2,310.000 $2,056.000 $1,500.000
DEBRIS - FRONTAGE ROADS - AREA (14)
CYC 24.000 $1,500.000 $1,000.000 $155.000 $463.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
CYC 24.000 $530.000 $530.000 $1,155.000 $820.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
CYC 24.000 $230.000 $230.000 $155.000 $475.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
CYC 24.000 $160.000 $160.000 $1,155.000 $941.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (4)
CYC 24.000 $210.000 $490.000 $155.000 $486.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (5)
CYC 24.000 $230.000 $230.000 $155.000 $492.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (6)
CYC 24.000 $530.000 $530.000 $1,155.000 $825.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (7)
CYC 24.000 $200.000 $200.000 $155.000 $503.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (8)
CYC 24.000 $530.000 $530.000 $155.000 $712.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (9)
CYC 24.000 $210.000 $450.000 $155.000 $514.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (12)
CYC 24.000 $1,700.000 $1,700.000 $2,310.000 $2,060.000 $1,500.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (13)
CYC 24.000 $200.000 $450.000 $155.000 $526.000 $530.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (14)
CYC 24.000 $300.000 $2,700.000 $155.000 $531.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 24.000 $530.000 $530.000 $385.000 $831.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 24.000 $230.000 $230.000 $155.000 $542.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (4)
CYC 24.000 $150.000 $230.000 $155.000 $548.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (5)
CYC 24.000 $140.000 $150.000 $155.000 $834.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (6)
CYC 24.000 $440.000 $440.000 $385.000 $559.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (7)
CYC 24.000 $200.000 $200.000 $155.000 $723.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (8)
CYC 24.000 $200.000 $350.000 $385.000 $571.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (9)
CYC 24.000 $200.000 $350.000 $155.000 $576.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (12)
CYC 24.000 $1,750.000 $1,750.000 $2,310.000 $2,064.000 $1,500.000
DEBRIS-DIRECT CONNECTOR - AREA (13)
CYC 24.000 $200.000 $350.000 $155.000 $588.000 $530.000
DEBRIS-DIRECT CONNECTOR - AREA (14)
CYC 24.000 $300.000 $350.000 $155.000 $593.000 $530.000
CLEANING / SWEEPING (SPOT)
MI 25.000 $175.000 $150.000 $155.000 $200.000 $200.000
CLEANING / SWEEPING (HANDWORK)
SY 750,000.000 $0.420 $0.440 $0.400 $0.150 $0.500
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 24.000 $2,765.000 $2,830.000 $2,500.000 $3,959.000 $3,180.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 24.000 $395.000 $420.000 $355.000 $565.000 $450.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 24.000 $3,160.000 $3,300.000 $2,900.000 $4,524.000 $3,630.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
CYC 24.000 $200.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
CYC 24.000 $395.000 $420.000 $355.000 $565.000 $450.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
CYC 24.000 $2,370.000 $2,450.000 $2,100.000 $3,393.000 $2,720.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
CYC 24.000 $107.000 $115.000 $90.000 $153.000 $120.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
CYC 24.000 $2,170.000 $2,250.000 $1,900.000 $3,110.000 $2,500.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(9)
CYC 24.000 $107.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (10)
CYC 1.000 $200.000 $420.000 $355.000 $707.000 $450.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (11)
CYC 1.000 $200.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (12)
CYC 24.000 $7,500.000 $7,800.000 $6,700.000 $10,746.000 $8,630.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (13)
CYC 24.000 $200.000 $420.000 $355.000 $707.000 $450.000
CLEAN / SWEEP - CENTER MEDIAN-AREA (14)
CYC 24.000 $2,000.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 24.000 $2,765.000 $2,825.000 $2,500.000 $3,959.000 $3,180.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 24.000 $395.000 $410.000 $355.000 $565.000 $450.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 24.000 $3,160.000 $3,350.000 $2,900.000 $4,524.000 $3,630.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
CYC 24.000 $197.000 $210.000 $190.000 $282.000 $230.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
CYC 24.000 $395.000 $410.000 $355.000 $565.000 $450.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
CYC 24.000 $2,370.000 $2,450.000 $2,100.000 $3,393.000 $2,720.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
CYC 24.000 $110.000 $115.000 $90.000 $153.000 $120.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
CYC 24.000 $2,170.000 $2,250.000 $1,900.000 $3,110.000 $2,500.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(9)
CYC 24.000 $1,975.000 $220.000 $180.000 $2,323.000 $230.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(10)
CYC 1.000 $200.000 $420.000 $355.000 $707.000 $450.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(11)
CYC 1.000 $200.000 $210.000 $180.000 $282.000 $230.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(12)
CYC 24.000 $7,500.000 $7,900.000 $6,700.000 $10,746.000 $8,630.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(13)
CYC 24.000 $200.000 $420.000 $355.000 $707.000 $450.000
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(14)
CYC 24.000 $2,000.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 24.000 $2,765.000 $2,850.000 $2,500.000 $3,959.000 $3,180.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 24.000 $395.000 $410.000 $355.000 $565.000 $450.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 24.000 $3,160.000 $3,300.000 $2,800.000 $4,524.000 $3,630.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
CYC 24.000 $200.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
CYC 24.000 $2,370.000 $2,500.000 $2,100.000 $3,393.000 $2,720.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
CYC 24.000 $110.000 $110.000 $90.000 $153.000 $120.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
CYC 24.000 $2,170.000 $2,250.000 $1,930.000 $3,110.000 $2,500.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(9)
CYC 24.000 $110.000 $210.000 $180.000 $2,828.000 $230.000
CLEAN / SWEEP - FRONTAGE ROAD -AREA(12)
CYC 24.000 $7,500.000 $7,800.000 $6,700.000 $10,746.000 $8,630.000
CLEAN / SWEEP - FRONTAGE ROAD -AREA(14)
CYC 24.000 $1,500.000 $210.000 $180.000 $282.000 $230.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 24.000 $2,765.000 $2,825.000 $2,500.000 $3,959.000 $3,180.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 24.000 $395.000 $405.000 $355.000 $565.000 $450.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 24.000 $3,160.000 $3,300.000 $2,900.000 $4,524.000 $3,630.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
CYC 24.000 $197.000 $200.000 $180.000 $70.000 $230.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
CYC 24.000 $395.000 $410.000 $355.000 $141.000 $450.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
CYC 24.000 $2,370.000 $2,420.000 $2,100.000 $851.000 $2,720.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
CYC 24.000 $107.000 $110.000 $90.000 $38.000 $120.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
CYC 24.000 $2,170.000 $2,225.000 $1,930.000 $779.000 $2,500.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 9)
CYC 24.000 $107.000 $210.000 $180.000 $707.000 $230.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 12)
CYC 24.000 $7,500.000 $7,800.000 $6,700.000 $2,693.000 $8,630.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 13)
CYC 24.000 $200.000 $405.000 $355.000 $707.000 $450.000
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 14)
CYC 24.000 $300.000 $200.000 $180.000 $707.000 $230.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 24.000 $2,765.000 $2,825.000 $2,500.000 $1,190.000 $3,180.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 24.000 $395.000 $410.000 $355.000 $169.000 $450.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
CYC 24.000 $197.000 $200.000 $180.000 $86.000 $230.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
CYC 24.000 $395.000 $410.000 $355.000 $169.000 $450.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
CYC 24.000 $2,370.000 $2,420.000 $2,100.000 $1,018.000 $2,720.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(7)
CYC 24.000 $107.000 $110.000 $90.000 $46.000 $120.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(8)
CYC 24.000 $2,170.000 $2,225.000 $1,930.000 $936.000 $2,500.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(9)
CYC 24.000 $1,200.000 $210.000 $180.000 $565.000 $230.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(12)
CYC 24.000 $7,500.000 $7,800.000 $6,700.000 $565.000 $8,630.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(13)
CYC 24.000 $200.000 $420.000 $355.000 $565.000 $450.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(14)
CYC 24.000 $300.000 $210.000 $180.000 $565.000 $230.000
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
LS 1.000 $100,000.000 $75,000.000 $25,000.000 $17,322.000 $125,000.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 20,000.000 $1.000 $0.500 $1.000 $1.000 $1.000
GRAFFITI REMOVAL (PAINTING)
SF 60,000.000 $1.100 $0.600 $1.900 $2.900 $1.250
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 500.000 $0.750 $0.500 $5.000 $5.000 $5.000
TREE TRIMMING / BRUSH REMOVAL
MI 10.000 $1,500.000 $1,400.000 $1,500.000 $1,200.000 $2,500.000
TREE REMOVAL (4" - 12" DIA)
EA 10.000 $180.000 $150.000 $300.000 $100.000 $300.000
TREE REMOVAL (12" - 18" DIA)
EA 10.000 $290.000 $180.000 $350.000 $120.000 $300.000
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $290.000 $185.000 $400.000 $135.000 $300.000
TREE REMOVAL (24" - 30" DIA)
EA 10.000 $440.000 $185.000 $600.000 $150.000 $300.000
TREE REMOVAL (30" - 36" DIA)
EA 10.000 $440.000 $190.000 $800.000 $200.000 $300.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $400.000 $300.000 $1,000.000 $300.000 $300.000
TREE REMOVAL (42" - 48" DIA)
EA 2.000 $400.000 $300.000 $1,500.000 $450.000 $300.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 500.000 $8.000 $8.000 $10.000 $5.000 $20.000
DRAIN INLET CLEANING
EA 200.000 $75.000 $75.000 $80.000 $77.000 $125.000
PUMP STATION WELL CLEANING
EA 44.000 $1,950.000 $1,950.000 $500.000 $2,400.000 $2,100.000
BASKET AND INLET PIPE CLEANING
EA 72.000 $330.000 $330.000 $150.000 $450.000 $400.000
SUMP CLEANING
EA 52.000 $330.000 $330.000 $150.000 $335.000 $400.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 5,000.000 $6.500 $6.500 $5.000 $4.350 $5.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 5,000.000 $6.500 $6.500 $5.000 $6.000 $6.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 5,000.000 $6.000 $6.000 $5.000 $5.300 $7.000
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 5,000.000 $6.500 $6.500 $5.000 $6.300 $8.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 5,000.000 $5.000 $5.000 $5.000 $7.400 $9.000
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 5,000.000 $5.000 $5.000 $5.000 $9.500 $11.000
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 100.000 $11.000 $11.000 $12.000 $10.000 $12.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $12.000 $12.000 $13.000 $12.000 $13.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 100.000 $15.000 $15.000 $15.000 $15.000 $16.000
SLOTTED DRAIN CLEANING
LF 750.000 $5.000 $5.000 $5.000 $4.000 $10.000
STORM SEWER CLEAN X LRG PUMP STAT WELL
EA 16.000 $7,960.000 $8,000.000 $3,000.000 $10,600.000 $10,000.000
PUMP STATION WELL CLEANING (LARGE)
EA 20.000 $4,800.000 $4,800.000 $1,000.000 $5,200.000 $6,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $14.500 $15.000 $15.000 $15.000 $16.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 375.000 $5.000 $5.000 $10.000 $16.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 375.000 $5.000 $5.000 $10.000 $25.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $31.000 $34.000 $35.000 $30.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 220.000 $40.000 $42.000 $45.000 $55.000 $100.000
REALIGN POSTS
EA 300.000 $6.000 $6.000 $7.000 $5.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $22.000 $24.000 $15.000 $20.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 250.000 $45.000 $45.000 $75.000 $36.000 $45.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 4.000 $5.000 $1.000 $60.000 $240.000 $250.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $5.000 $1.000 $100.000 $240.000 $350.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $2,800.000 $2,900.000 $2,500.000 $3,000.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $1,100.000 $1,100.000 $1,200.000 $1,000.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $100.000 $100.000 $500.000 $200.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $109.000 $109.000 $150.000 $150.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 15.000 $88.000 $88.000 $100.000 $125.000 $200.000
REPLACE SGT STRUT
EA 16.000 $62.000 $62.000 $75.000 $100.000 $125.000
REPLACE SGT OBJECT MARKER
EA 75.000 $20.000 $20.000 $25.000 $30.000 $50.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $21,000.000 $18,000.000 $20,000.000 $27,000.000 $20,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $46,000.000 $30,000.000 $35,000.000 $40,000.000 $35,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 60.000 $1,400.000 $1,100.000 $2,000.000 $5,800.000 $1,300.000
REPAIR REACT (N) (REAR SEC "S")
EA 4.000 $50.000 $50.000 $600.000 $230.000 $500.000
REPAIR REACT (N) (REAR SEC "B")
EA 4.000 $50.000 $50.000 $600.000 $230.000 $500.000
REPAIR REACT (N) (FRONT SECTION)
EA 4.000 $250.000 $250.000 $750.000 $420.000 $1,000.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $2,900.000 $2,900.000 $4,000.000 $3,500.000 $3,000.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,500.000 $1,500.000 $1,500.000 $900.000 $1,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 10.000 $1,200.000 $1,200.000 $1,200.000 $5,800.000 $700.000
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $2,900.000 $2,900.000 $2,500.000 $3,500.000 $2,500.000
REMOVE AND REPLACE (HEART)
EA 2.000 $1,000.000 $1,000.000 $12,000.000 $19,000.000 $7,500.000
REPAIR HEART (MISC HARDWARE)
EA 2.000 $3,500.000 $1,000.000 $3,000.000 $2,250.000 $500.000
REMOVE AND REPLACE (TAU II) (N)
EA 3.000 $19,500.000 $21,000.000 $25,000.000 $21,000.000 $22,000.000
REPAIR TAU II (N)
LF 250.000 $335.000 $320.000 $300.000 $175.000 $300.000
REPAIR TAU II (W)
LF 250.000 $50.000 $50.000 $500.000 $130.000 $150.000
REMOVE AND REPLACE TAU II (W)
EA 3.000 $25,000.000 $26,000.000 $25,000.000 $1,100.000 $25,000.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 5.000 $2,500.000 $2,500.000 $2,500.000 $1,000.000 $3,000.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 5,000.000 $8.000 $7.000 $8.000 $5.000 $8.500
TYPE CAC CONCRETE
CY 25.000 $3,000.000 $8,500.000 $6,000.000 $500.000 $1,750.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 113.000 $90.000 $90.000 $250.000 $100.000 $125.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 200.000 $900.000 $810.000 $800.000 $475.000 $900.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 100.000 $400.000 $360.000 $400.000 $350.000 $1,000.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 6.000 $400.000 $360.000 $1,000.000 $200.000 $300.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 200.000 $280.000 $258.000 $300.000 $160.000 $400.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 100.000 $250.000 $225.000 $250.000 $100.000 $250.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 6.000 $70.000 $70.000 $60.000 $100.000 $300.000
TMA (STATIONARY)
DAY 365.000 $190.000 $200.000 $375.000 $250.000 $800.000
TMA (MOBILE OPERATION)
HR 24.000 $60.000 $60.000 $200.000 $90.000 $100.000
STORM SEWER (TELEVISION INSPECTION)
LF 300.000 $6.000 $5.000 $5.000 $5.000 $5.000
SNOW AND ICE CONTROL (TRUCK)
HR 1,000.000 $5.000 $5.000 $35.000 $100.000 $90.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,000.000 $5.000 $5.000 $25.000 $50.000 $50.000
SNOW AND ICE CONTROL (LOADER)
HR 50.000 $35.000 $35.000 $100.000 $300.000 $125.000
SNOW AND ICE CONTROL (SEASON)
MO 4.000 $4,000.000 $5,000.000 $20,000.000 $15,000.000 $100,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 200.000 $55.000 $55.000 $200.000 $100.000 $75.000
Totals: $9,806,211.000 $8,697,813.750 $9,378,458.290 $10,140,371.000 $11,534,118.950