Show Job Controls
Bid Cobra

HARRIS SL0008 (6345-96-001)

Items: 60

County: HARRIS
Length: N/A
Highway: SL0008
District: HOUSTON
Control Number: 6345-96-001
DBE Goal: N/A
Project: RMC - 634596001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,474,375.00
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,474,375.00
$1,994,275.00
Over/Under Est: 35.26% $519,900.00
$2,389,525.00
Over/Under Est: 62.07% $915,150.00
Amt Left: 19.82% $395,250.00

Bid Items & Bid Tabulations

60 Total 0 of 60
HARRIS  |  SL0008  |  HOUSTON  |  6345-96-001  |  08/07/2019  |  $1,474,375.00  |  RMC - 634596001  |  GUARDRAIL REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (CTB)
LF 120.000 $20.000 $5.000 $30.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $70.000 $100.000 $100.000
CONC STR REPAIR (STANDARD)
SF 700.000 $45.000 $60.000 $50.000
RIPRAP (MOW STRIP)(5 IN)
CY 50.000 $405.000 $450.000 $450.000
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $100.000 $750.000
MOBILIZATION (EMERGENCY)
EA 8.000 $1,250.000 $1,000.000 $1,500.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 70,000.000 $1.250 $4.000 $5.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 60.000 $30.000 $50.000 $20.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 600.000 $30.000 $25.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,400.000 $2,000.000 $2,200.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $7.000 $35.000 $18.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 100.000 $100.000 $1,250.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.000 $10.000 $2.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,500.000 $3,000.000 $500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 6.000 $17,000.000 $16,000.000 $31,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(70)
EA 1.000 $30,000.000 $23,000.000 $45,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 700.000 $18.000 $20.000 $30.000
CHAIN LINK FENCE (REPAIR) (6')
LF 300.000 $15.000 $15.000 $25.000
CHAIN LINK FENCE GATE (INSTALL)(6'X10')
EA 6.000 $750.000 $1,000.000 $950.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 1,000.000 $3.250 $10.000 $4.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 1,000.000 $3.250 $10.000 $4.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $11.500 $16.000 $21.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 10.000 $30.000 $30.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $35.000 $30.000 $30.000
RAISE RAIL ELEMENT
LF 2,000.000 $4.000 $7.000 $18.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $35.000 $35.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $50.000 $50.000 $45.000
REALIGN POSTS
EA 500.000 $10.000 $15.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 15,000.000 $14.250 $20.000 $24.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,500.000 $43.000 $50.000 $55.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $2,700.000 $3,000.000 $3,100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 200.000 $800.000 $950.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 300.000 $59.000 $150.000 $110.000
REPLACE SGT CABLE ASSEMBLY
EA 300.000 $77.000 $50.000 $105.000
REPLACE SGT CABLE ANCHOR
EA 300.000 $77.000 $80.000 $80.000
REPLACE SGT STRUT
EA 200.000 $87.000 $70.000 $70.000
REPLACE SGT OBJECT MARKER
EA 100.000 $25.000 $100.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $50.000 $90.000 $120.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $18,750.000 $19,000.000 $19,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $27,000.000 $32,500.000 $43,000.000
REPAIR (TRACC)
EA 1.000 $3,000.000 $2,500.000 $1,000.000
REPAIR (TRACC)
LF 50.000 $70.000 $150.000 $250.000
REPAIR (WIDE TRACC)
EA 1.000 $5,500.000 $5,500.000 $2,000.000
REPAIR (WIDE TRACC)
LF 50.000 $75.000 $175.000 $250.000
REPAIR REACT (N) (MISC HARDWARE)
EA 35.000 $1,000.000 $950.000 $1,100.000
REPAIR REACT (N) (CYLINDERS)
EA 5.000 $2,400.000 $3,000.000 $2,900.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $2,500.000 $1,000.000 $1,000.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $2,500.000 $2,900.000 $2,900.000
REPAIR (SMTC) (N)
EA 1.000 $1,000.000 $3,500.000 $1,000.000
REPAIR (SMTC) (W)
EA 1.000 $1,000.000 $4,000.000 $1,000.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 1.000 $1,750.000 $2,000.000 $1,800.000
REPAIR TAU II (N)
LF 100.000 $200.000 $125.000 $250.000
REPAIR TAU II (W)
LF 100.000 $250.000 $125.000 $250.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 5.000 $2,500.000 $2,500.000 $2,500.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 5.000 $3,000.000 $3,000.000 $3,000.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 200.000 $120.000 $100.000 $160.000
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
LF 100.000 $43.000 $50.000 $150.000
REPAIR (EXISTING METAL PED. RAIL)
LF 100.000 $20.000 $50.000 $65.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $50.000 $85.000
TMA (STATIONARY)
DAY 365.000 $200.000 $175.000 $200.000
Totals: $1,474,375.000 $1,994,275.000 $2,389,525.000