Show Job Controls
Bid Cobra

HARRIS SH0225 (6334-17-001)

Items: 41

County: HARRIS
Length: N/A
Highway: SH0225
District: HOUSTON
Control Number: 6334-17-001
DBE Goal: N/A
Project: RMC - 633417001
Guaranty: N/A
Time: 84 W
Engineer's Estimate: $2,845,498.31
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: REPAIR SLOPE FAILURES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,845,498.31
$2,794,172.98
Over/Under Est: -1.8% -$51,325.33
$3,196,494.41
Over/Under Est: 12.34% $350,996.10
Amt Left: 14.4% $402,321.43
Over/Under Est: 17.48% $497,454.49
Amt Left: 19.64% $548,779.82
Delta: -4.58% -$146,458.39
$3,374,312.50
Over/Under Est: 18.58% $528,814.19
Amt Left: 20.76% $580,139.52
Delta: -0.94% -$31,359.70
$3,497,454.00
Over/Under Est: 22.91% $651,955.69
Amt Left: 25.17% $703,281.02
Delta: -3.65% -$123,141.50
$4,829,302.00
Over/Under Est: 69.72% $1,983,803.69
Amt Left: 72.83% $2,035,129.02
Delta: -38.08% -$1,331,848.00

Bid Items & Bid Tabulations

41 Total 0 of 41
HARRIS  |  SH0225  |  HOUSTON  |  6334-17-001  |  03/06/2019  |  $2,845,498.31  |  RMC - 633417001  |  REPAIR SLOPE FAILURES  |  84 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
ALTUS CONSTRUCTION LLC
ANGEL BROTHERS HOLDINGS CORP.
ISI CONTRACTING, INC.
FNH CONSTRUCTION, LLC
EARTH BUILDERS, L.P.
REMOVING CONC (CTB)
LF 2,160.000 $14.000 $12.070 $6.520 $11.000 $15.000 $20.000 $40.000
REMOVING CONC (FLUME)
SY 250.000 $92.000 $29.590 $16.660 $10.000 $85.000 $20.000 $25.000
EXCAVATION (ROADWAY)
CY 17,407.000 $14.000 $14.840 $20.000 $25.000 $24.000 $20.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 13,500.000 $22.000 $23.320 $28.000 $35.000 $30.000 $25.000 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,040.000 $20.000 $23.320 $20.090 $35.000 $30.000 $25.000 $75.000
BLOCK SODDING
SY 7,690.000 $6.000 $3.250 $2.370 $6.000 $3.500 $8.000 $6.000
FERTILIZER
AC 2.500 $550.000 $750.000 $408.280 $1,000.000 $725.000 $3,000.000 $1,200.000
VEGETATIVE WATERING
MG 300.000 $20.000 $13.760 $41.850 $47.000 $30.000 $50.000 $80.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 4,000.000 $2.600 $1.150 $1.150 $2.400 $1.500 $6.500 $2.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 321.000 $125.000 $330.440 $127.560 $139.000 $120.000 $120.000 $150.000
D-GR HMA(SQ) TY-D SAC-B PG64-22
TON 81.000 $155.000 $550.730 $245.600 $369.000 $225.000 $140.000 $200.000
CEM STABIL BKFL
CY 203.000 $104.000 $94.400 $90.140 $120.000 $60.000 $200.000 $120.000
CUT & RESTORE ASPH PAVING
SY 729.000 $154.000 $88.880 $179.590 $15.000 $169.000 $100.000 $150.000
SHEET PILING (PZ - 27)
SF 25,450.000 $34.000 $33.680 $45.220 $40.000 $38.000 $45.000 $40.000
RIPRAP (CONC)(FLUME)
CY 112.000 $650.000 $585.480 $534.460 $684.000 $750.000 $650.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 195.000 $415.000 $777.830 $386.000 $641.000 $750.000 $500.000 $650.000
GRATE
EA 10.000 $6,140.000 $684.520 $1,673.030 $710.000 $1,000.000 $2,500.000 $2,000.000
MOBILIZATION
LS 1.000 $258,042.790 $274,481.630 $307,374.240 $334,000.000 $325,000.000 $330,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,400.000 $5,238.930 $12,133.190 $1,600.000 $5,000.000 $8,500.000 $5,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $5.500 $2.890 $2.430 $4.000 $3.000 $4.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 400.000 $7.500 $4.860 $4.280 $12.000 $3.500 $15.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $0.930 $1.000 $1.350 $2.000 $1.200 $10.000 $2.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 6,000.000 $20.000 $12.480 $10.040 $21.000 $18.000 $30.000 $45.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,800.000 $25.000 $9.330 $4.600 $5.000 $20.000 $20.000 $30.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 6,000.000 $20.000 $10.760 $9.280 $13.500 $18.000 $20.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,294.000 $21.460 $19.810 $27.650 $23.000 $21.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,450.000 $1,981.340 $1,922.240 $2,300.000 $2,900.000 $1,850.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,030.000 $1,280.250 $1,134.830 $1,500.000 $1,400.000 $1,850.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 2,862.000 $2.440 $2.030 $2.960 $2.400 $2.000 $3.000 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $142.000 $304.820 $232.110 $350.000 $230.000 $500.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,450.000 $2,743.390 $2,696.910 $3,200.000 $3,200.000 $2,850.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $165.000 $304.820 $271.650 $355.000 $225.000 $1,500.000 $600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,700.000 $4,064.280 $1,400.510 $4,700.000 $1,400.000 $5,000.000 $5,000.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,250.000 $4,064.280 $845.600 $4,700.000 $1,200.000 $2,500.000 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $1,219.290 $2,780.090 $1,400.000 $1,200.000 $2,500.000 $4,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $17,500.000 $28,449.940 $10,546.980 $33,800.000 $26,000.000 $15,000.000 $32,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $380.000 $386.470 $499.350 $500.000 $450.000 $550.000 $1,000.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 656.000 $1.000 $0.560 $2.160 $3.500 $3.000 $5.000 $4.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $48.000 $598.220 $352.160 $700.000 $270.000 $2,000.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 376.000 $48.000 $94.470 $137.670 $105.000 $55.000 $100.000 $125.000
TMA (STATIONARY)
DAY 376.000 $170.000 $147.610 $272.500 $100.000 $300.000 $250.000 $500.000
Totals: $2,845,498.310 $2,794,172.980 $3,196,494.410 $3,342,952.800 $3,374,312.500 $3,497,454.000 $4,829,302.000