REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$43.000
|
$10.000
|
$25.000
|
$7.500
|
|
|
REMOVING CONC (CURB)
|
LF
|
50.000
|
$7.600
|
$10.000
|
$2.000
|
$4.000
|
|
|
BACKFILL (TY A OR B)
|
CY
|
500.000
|
$30.000
|
$35.000
|
$70.000
|
$75.000
|
|
|
BLADING
|
STA
|
100.000
|
$133.810
|
$100.000
|
$125.000
|
$100.000
|
|
|
SPOT SODDING
|
SY
|
300.000
|
$2.630
|
$8.750
|
$15.000
|
$8.000
|
|
|
BLOCK SODDING
|
SY
|
500.000
|
$4.740
|
$8.750
|
$5.000
|
$8.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,000.000
|
$0.150
|
$1.000
|
$1.250
|
$0.300
|
|
|
FERTILIZER
|
AC
|
5.000
|
$636.200
|
$500.000
|
$800.000
|
$900.000
|
|
|
VEGETATIVE WATERING
|
MG
|
30.000
|
$11.470
|
$30.000
|
$10.000
|
$46.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
|
SY
|
100.000
|
$80.000
|
$85.000
|
$100.000
|
$95.000
|
|
|
FULL-DEPTH REPAIR CRCP (8"-10")
|
SY
|
50.000
|
$250.000
|
$225.000
|
$280.000
|
$280.000
|
|
|
FULL-DEPTH REPAIR CRCP (13"-15")
|
SY
|
50.000
|
$350.000
|
$250.000
|
$300.000
|
$440.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
150.000
|
$82.000
|
$80.000
|
$100.000
|
$140.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
150.000
|
$183.000
|
$80.000
|
$100.000
|
$83.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
60.000
|
$237.000
|
$325.000
|
$400.000
|
$200.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
100.000
|
$135.010
|
$150.000
|
$120.000
|
$155.000
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
30.000
|
$400.000
|
$400.000
|
$500.000
|
$355.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
104.000
|
$600.000
|
$650.000
|
$70.000
|
$1,225.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
104.000
|
$530.000
|
$100.000
|
$70.000
|
$100.000
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
500.000
|
$30.000
|
$40.000
|
$40.000
|
$64.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
500.000
|
$32.000
|
$35.000
|
$30.000
|
$75.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$42.000
|
$25.000
|
$24.000
|
$15.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$8.000
|
$1.000
|
$3.000
|
$9.500
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
560.000
|
$24.000
|
$1.000
|
$25.000
|
$15.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
400.000
|
$20.000
|
$15.000
|
$40.000
|
$18.000
|
|
|
REPLACEMENT PAVERS
|
SY
|
150.000
|
$126.000
|
$15.000
|
$90.000
|
$44.000
|
|
|
CONC CURB (TY II)
|
LF
|
500.000
|
$10.000
|
$4.000
|
$5.000
|
$9.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
24.000
|
$1,106.960
|
$500.000
|
$1,300.000
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.320
|
$1.000
|
$2.000
|
$3.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
500.000
|
$11.700
|
$5.000
|
$14.000
|
$30.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,178.000
|
$1,500.000
|
$2,800.000
|
$2,000.000
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
3.000
|
$2,557.720
|
$500.000
|
$2,800.000
|
$2,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$19,500.000
|
$5,000.000
|
$25,000.000
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,683.260
|
$1,000.000
|
$1,800.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$531.290
|
$500.000
|
$350.000
|
$650.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
1,000.000
|
$17.500
|
$10.000
|
$10.000
|
$18.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
3.000
|
$1,147.000
|
$1,000.000
|
$900.000
|
$325.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$1,133.330
|
$750.000
|
$750.000
|
$177.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
100.000
|
$35.000
|
$35.000
|
$20.000
|
$100.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
100.000
|
$35.000
|
$35.000
|
$20.000
|
$24.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
100.000
|
$40.000
|
$20.000
|
$25.000
|
$22.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
300.000
|
$50.000
|
$35.000
|
$36.000
|
$24.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
750.000
|
$50.000
|
$35.000
|
$38.000
|
$24.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
200.000
|
$50.000
|
$20.000
|
$50.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
45.000
|
$20.000
|
$25.000
|
$25.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
65.000
|
$105.790
|
$100.000
|
$21.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
35.000
|
$20.000
|
$25.000
|
$24.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
65.000
|
$9.490
|
$100.000
|
$21.000
|
$16.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$20.000
|
$25.000
|
$41.000
|
$35.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,500.000
|
$1.500
|
$0.474
|
$0.450
|
$0.370
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
1,000.000
|
$0.720
|
$0.948
|
$0.850
|
$0.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,000.000
|
$0.900
|
$0.948
|
$0.850
|
$0.960
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,000.000
|
$2.070
|
$2.750
|
$1.900
|
$2.450
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
9,000.000
|
$2.620
|
$3.000
|
$1.900
|
$2.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,000.000
|
$6.560
|
$4.000
|
$2.400
|
$4.290
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
48.000
|
$118.830
|
$100.000
|
$86.000
|
$92.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
32.000
|
$176.700
|
$150.000
|
$107.000
|
$98.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
26.000
|
$142.090
|
$175.000
|
$134.000
|
$104.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$283.330
|
$300.000
|
$214.000
|
$110.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
48.000
|
$139.810
|
$200.000
|
$134.000
|
$104.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
7.000
|
$635.720
|
$355.374
|
$320.000
|
$520.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$722.690
|
$355.374
|
$320.000
|
$520.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.580
|
$0.948
|
$0.850
|
$0.520
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.560
|
$2.132
|
$2.000
|
$1.840
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
200.000
|
$5.180
|
$2.961
|
$2.700
|
$4.300
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,000.000
|
$0.550
|
$0.592
|
$0.550
|
$1.040
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
100.000
|
$1.260
|
$1.185
|
$1.100
|
$0.750
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
200.000
|
$1.350
|
$1.185
|
$1.100
|
$0.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
400.000
|
$0.170
|
$0.059
|
$0.060
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
14,500.000
|
$0.170
|
$0.071
|
$0.070
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
11,000.000
|
$0.290
|
$0.095
|
$0.090
|
$0.250
|
|
|
PAVEMENT SEALER 12"
|
LF
|
11,000.000
|
$0.800
|
$0.118
|
$0.120
|
$0.370
|
|
|
PAVEMENT SEALER 24"
|
LF
|
3,200.000
|
$0.980
|
$0.178
|
$0.200
|
$0.490
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
48.000
|
$35.650
|
$5.923
|
$5.400
|
$12.270
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
48.000
|
$37.890
|
$5.923
|
$5.400
|
$12.270
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
32.000
|
$92.500
|
$5.923
|
$5.400
|
$12.270
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
26.000
|
$30.000
|
$5.923
|
$5.400
|
$12.270
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
8.000
|
$30.000
|
$5.923
|
$5.400
|
$12.270
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
7.000
|
$15.000
|
$11.846
|
$11.000
|
$49.060
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
7.000
|
$15.000
|
$11.846
|
$11.000
|
$49.060
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
200.000
|
$0.260
|
$0.711
|
$0.650
|
$0.800
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,000.000
|
$0.370
|
$0.592
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,000.000
|
$0.350
|
$0.592
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
200.000
|
$0.260
|
$0.711
|
$0.650
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,000.000
|
$0.320
|
$0.592
|
$0.550
|
$0.550
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
1,000.000
|
$6.790
|
$11.846
|
$11.000
|
$12.270
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
6.000
|
$1,750.360
|
$2,369.160
|
$2,150.000
|
$3,000.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
40.000
|
$3.950
|
$3.258
|
$3.000
|
$4.910
|
|
REFL PAV MRKR TY I-C
|
EA
|
40.000
|
$3.290
|
$3.258
|
$3.000
|
$4.910
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$2.370
|
$3.258
|
$3.000
|
$4.910
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
350.000
|
$3.710
|
$3.258
|
$3.000
|
$4.910
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
400.000
|
$0.420
|
$0.118
|
$0.120
|
$0.180
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
14,500.000
|
$0.520
|
$0.178
|
$0.170
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
11,000.000
|
$0.690
|
$0.296
|
$0.300
|
$0.310
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
11,000.000
|
$1.830
|
$0.355
|
$0.350
|
$0.670
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
3,200.000
|
$3.280
|
$0.711
|
$0.650
|
$1.410
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
48.000
|
$38.190
|
$11.846
|
$11.000
|
$18.400
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
32.000
|
$47.430
|
$11.846
|
$11.000
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
48.000
|
$43.300
|
$11.846
|
$11.000
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
7.000
|
$285.000
|
$11.846
|
$11.000
|
$184.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
7.000
|
$550.000
|
$11.846
|
$11.000
|
$184.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
6.000
|
$246.500
|
$29.615
|
$27.000
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
26.000
|
$60.670
|
$11.846
|
$11.000
|
$31.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
400.000
|
$0.100
|
$0.012
|
$0.020
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,500.000
|
$0.100
|
$0.024
|
$0.030
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
11,000.000
|
$0.210
|
$0.036
|
$0.040
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
11,000.000
|
$0.960
|
$0.047
|
$0.050
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,200.000
|
$2.430
|
$0.059
|
$0.060
|
$0.290
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
48.000
|
$23.660
|
$11.846
|
$11.000
|
$12.250
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
32.000
|
$13.470
|
$11.846
|
$11.000
|
$18.400
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
26.000
|
$15.020
|
$11.846
|
$11.000
|
$18.400
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
48.000
|
$27.020
|
$11.846
|
$11.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
7.000
|
$144.170
|
$11.846
|
$11.000
|
$37.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
7.000
|
$184.170
|
$11.846
|
$11.000
|
$37.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
6.000
|
$25.000
|
$29.615
|
$27.000
|
$37.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
530.000
|
$1.810
|
$0.296
|
$0.300
|
$1.250
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
25.000
|
$89.300
|
$100.000
|
$180.000
|
$54.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
50.000
|
$94.450
|
$100.000
|
$250.000
|
$106.000
|
|
|
SPOT MOWING
|
AC
|
9.000
|
$60.000
|
$100.000
|
$70.000
|
$250.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
277.920
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
5,952.860
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
6,400.800
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
4,268.280
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
977.520
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
8,031.000
|
$40.000
|
$32.000
|
$36.000
|
$37.500
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
218.600
|
$88.240
|
$250.000
|
$140.000
|
$150.000
|
|
|
BROADCAST APPLICATION
|
AC
|
100.000
|
$39.660
|
$50.000
|
$100.000
|
$75.000
|
|
|
WICK APPLICATION OF HERBICIDE
|
AC
|
75.000
|
$25.320
|
$50.000
|
$100.000
|
$85.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
30.000
|
$15.000
|
$50.000
|
$100.000
|
$100.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$416.880
|
$119.000
|
$1,000.000
|
$306.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
48.000
|
$4,464.650
|
$2,500.000
|
$3,000.000
|
$6,300.000
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
48.000
|
$4,800.600
|
$2,700.000
|
$3,000.000
|
$6,800.000
|
|
|
LITTER REMOVAL - TRACT (4)
|
CYC
|
48.000
|
$3,356.900
|
$1,700.000
|
$3,000.000
|
$4,250.000
|
|
|
LITTER REMOVAL - TRACT (5)
|
CYC
|
48.000
|
$1,466.280
|
$315.000
|
$3,000.000
|
$1,050.000
|
|
|
LITTER REMOVAL - TRACT (6)
|
CYC
|
48.000
|
$2,450.700
|
$2,520.000
|
$2,000.000
|
$3,125.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
72.000
|
$176.000
|
$1,000.000
|
$80.000
|
$75.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
72.000
|
$1,738.000
|
$1,000.000
|
$800.000
|
$725.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
72.000
|
$1,310.000
|
$1,000.000
|
$625.000
|
$550.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
|
CYC
|
72.000
|
$1,310.000
|
$1,000.000
|
$625.000
|
$550.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
|
CYC
|
72.000
|
$201.300
|
$1,000.000
|
$100.000
|
$85.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
|
CYC
|
72.000
|
$1,277.000
|
$1,000.000
|
$600.000
|
$525.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
24.000
|
$1,200.000
|
$500.000
|
$85.000
|
$75.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
24.000
|
$1,200.000
|
$500.000
|
$800.000
|
$725.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (5)
|
CYC
|
24.000
|
$1,200.000
|
$500.000
|
$100.000
|
$85.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (6)
|
CYC
|
24.000
|
$1,200.000
|
$500.000
|
$600.000
|
$525.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
50,000.000
|
$0.350
|
$0.250
|
$0.200
|
$0.450
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$304.000
|
$500.000
|
$220.000
|
$95.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$3,002.000
|
$1,800.000
|
$2,200.000
|
$915.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
24.000
|
$2,261.000
|
$1,800.000
|
$1,600.000
|
$700.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
|
CYC
|
24.000
|
$2,262.900
|
$1,800.000
|
$1,600.000
|
$700.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
|
CYC
|
24.000
|
$347.700
|
$1,000.000
|
$250.000
|
$100.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
|
CYC
|
24.000
|
$2,205.900
|
$1,800.000
|
$1,600.000
|
$675.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$304.000
|
$500.000
|
$215.000
|
$100.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$3,002.000
|
$1,800.000
|
$2,100.000
|
$925.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
24.000
|
$2,261.000
|
$1,800.000
|
$1,600.000
|
$700.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
|
CYC
|
24.000
|
$2,262.900
|
$1,800.000
|
$1,600.000
|
$700.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
|
CYC
|
24.000
|
$347.700
|
$500.000
|
$250.000
|
$100.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
|
CYC
|
24.000
|
$2,205.900
|
$1,800.000
|
$1,600.000
|
$675.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
12.000
|
$376.000
|
$500.000
|
$215.000
|
$185.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
12.000
|
$3,713.000
|
$500.000
|
$2,100.000
|
$1,825.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
12.000
|
$2,796.500
|
$500.000
|
$1,600.000
|
$1,375.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
|
CYC
|
12.000
|
$2,798.850
|
$500.000
|
$1,600.000
|
$1,375.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(5)
|
CYC
|
12.000
|
$430.000
|
$500.000
|
$250.000
|
$225.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
|
CYC
|
12.000
|
$2,728.350
|
$500.000
|
$1,600.000
|
$1,350.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
12.000
|
$250.000
|
$900.000
|
$215.000
|
$185.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
12.000
|
$2,464.800
|
$900.000
|
$2,200.000
|
$1,825.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
12.000
|
$1,856.400
|
$900.000
|
$1,600.000
|
$1,375.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
|
CYC
|
12.000
|
$1,857.960
|
$900.000
|
$1,600.000
|
$1,375.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
|
CYC
|
12.000
|
$285.480
|
$900.000
|
$250.000
|
$225.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
|
CYC
|
12.000
|
$1,811.160
|
$900.000
|
$1,600.000
|
$1,350.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
24.000
|
$3,000.000
|
$900.000
|
$215.000
|
$185.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
24.000
|
$3,000.000
|
$900.000
|
$2,200.000
|
$1,825.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
|
CYC
|
24.000
|
$3,000.000
|
$900.000
|
$250.000
|
$225.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
|
CYC
|
24.000
|
$3,000.000
|
$900.000
|
$1,600.000
|
$1,350.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
1,500.000
|
$3.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
1,500.000
|
$4.000
|
$6.000
|
$1.500
|
$20.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
300.000
|
$2.750
|
$5.000
|
$1.000
|
$10.000
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
1,500.000
|
$1.000
|
$1.000
|
$1.200
|
$4.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
1,500.000
|
$2.000
|
$1.000
|
$1.200
|
$4.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
24.000
|
$1,570.250
|
$1,400.000
|
$1,200.000
|
$1,800.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
15.000
|
$48.880
|
$300.000
|
$15.000
|
$200.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
15.000
|
$69.210
|
$310.000
|
$25.000
|
$230.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$107.600
|
$400.000
|
$100.000
|
$260.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$188.800
|
$450.000
|
$100.000
|
$250.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$286.620
|
$600.000
|
$100.000
|
$250.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$367.570
|
$700.000
|
$100.000
|
$275.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$508.690
|
$800.000
|
$100.000
|
$320.000
|
|
|
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
|
CY
|
1,000.000
|
$20.000
|
$10.000
|
$12.000
|
$10.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
60.000
|
$91.300
|
$125.000
|
$88.000
|
$45.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
8.000
|
$1,562.500
|
$2,500.000
|
$2,000.000
|
$2,400.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
8.000
|
$707.350
|
$750.000
|
$440.000
|
$500.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
4.000
|
$200.000
|
$500.000
|
$275.000
|
$78.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
100.000
|
$2.000
|
$5.000
|
$4.500
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
900.000
|
$7.110
|
$5.300
|
$5.500
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
1,400.000
|
$4.330
|
$8.000
|
$6.000
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
950.000
|
$3.880
|
$6.000
|
$6.500
|
$10.500
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
900.000
|
$5.000
|
$6.500
|
$6.700
|
$11.600
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
400.000
|
$6.350
|
$8.500
|
$9.000
|
$13.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
200.000
|
$8.460
|
$14.000
|
$11.000
|
$14.500
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
110.000
|
$9.000
|
$15.000
|
$14.000
|
$14.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$14.060
|
$17.000
|
$17.000
|
$16.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
90.000
|
$22.640
|
$20.000
|
$20.000
|
$18.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
50.000
|
$38.670
|
$22.000
|
$22.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$13.980
|
$12.000
|
$17.000
|
$15.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
300.000
|
$32.620
|
$20.000
|
$15.000
|
$16.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
300.000
|
$65.300
|
$20.000
|
$15.000
|
$36.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
150.000
|
$26.810
|
$25.000
|
$28.000
|
$25.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
30.000
|
$33.000
|
$30.000
|
$35.000
|
$84.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
450.000
|
$39.370
|
$40.000
|
$48.000
|
$74.000
|
|
|
REALIGN POSTS
|
EA
|
120.000
|
$9.220
|
$10.000
|
$6.000
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,500.000
|
$20.580
|
$20.000
|
$17.000
|
$23.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
300.000
|
$54.220
|
$50.000
|
$40.000
|
$55.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
30.000
|
$739.310
|
$1,000.000
|
$1,000.000
|
$900.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$153.240
|
$100.000
|
$125.000
|
$44.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
18.000
|
$47.920
|
$150.000
|
$105.000
|
$95.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
24.000
|
$57.270
|
$86.000
|
$95.000
|
$111.000
|
|
|
REPLACE SGT STRUT
|
EA
|
12.000
|
$38.100
|
$60.000
|
$95.000
|
$70.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
20.000
|
$35.630
|
$30.000
|
$30.000
|
$27.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
6.000
|
$169.530
|
$150.000
|
$40.000
|
$221.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
350.000
|
$91.400
|
$95.000
|
$130.000
|
$150.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
16.000
|
$75.580
|
$250.000
|
$400.000
|
$127.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
18.000
|
$64.500
|
$100.000
|
$50.000
|
$151.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
13.000
|
$568.380
|
$950.000
|
$950.000
|
$1,000.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
9,500.000
|
$1.130
|
$1.000
|
$3.000
|
$7.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
25.000
|
$141.690
|
$300.000
|
$500.000
|
$145.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$13.810
|
$25.000
|
$20.000
|
$6.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$4,520.000
|
$3,000.000
|
$4,000.000
|
$2,500.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
35.000
|
$500.000
|
$1,500.000
|
$900.000
|
$1,000.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
21.000
|
$3,000.000
|
$2,500.000
|
$3,000.000
|
$2,750.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
12.000
|
$950.000
|
$900.000
|
$900.000
|
$1,400.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
13.000
|
$2,200.000
|
$1,000.000
|
$3,000.000
|
$2,900.000
|
|
|
REPAIR REACT (W) (DIAPHRAGM)
|
EA
|
4.000
|
$200.000
|
$500.000
|
$900.000
|
$1,000.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
4.000
|
$3,833.330
|
$400.000
|
$4,000.000
|
$950.000
|
|
|
REPAIR TAU II (N)
|
LF
|
9.000
|
$223.760
|
$350.000
|
$750.000
|
$2,000.000
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
2,000.000
|
$18.900
|
$10.000
|
$8.000
|
$9.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$102.000
|
$50.000
|
$100.000
|
$165.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
100.000
|
$500.000
|
$750.000
|
$600.000
|
$500.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$800.000
|
$50.000
|
$250.000
|
$800.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
6.000
|
$500.000
|
$100.000
|
$400.000
|
$500.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$400.000
|
$500.000
|
$500.000
|
$300.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
50.000
|
$600.000
|
$50.000
|
$290.000
|
$300.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
6.000
|
$300.000
|
$50.000
|
$75.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
EA
|
156.000
|
$210.020
|
$300.000
|
$350.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$75.070
|
$45.000
|
$50.000
|
$65.000
|
|
|
VACUUM CLEANING OF BRIDGE JOINTS
|
CYC
|
2.000
|
$27,100.000
|
$19,000.000
|
$15,000.000
|
$24,000.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
72.000
|
$76.360
|
$90.000
|
$65.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
216.000
|
$60.900
|
$60.000
|
$60.000
|
$75.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
72.000
|
$91.360
|
$75.000
|
$70.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$50,500.000
|
$26,000.000
|
$35,000.000
|
$32,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
144.000
|
$69.090
|
$100.000
|
$75.000
|
$125.000
|
|
Totals: |
$5,618,167.134
|
$4,083,346.782
|
$4,391,999.480
|
$4,794,059.030
|