REMOVING CONC (CURB)
|
LF
|
600.000
|
$7.540
|
$8.000
|
$1.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
90.000
|
$32.940
|
$35.000
|
$15.000
|
|
|
BLADING
|
STA
|
100.000
|
$30.260
|
$40.000
|
$100.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
30.000
|
$73.330
|
$150.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
500.000
|
$41.940
|
$43.000
|
$53.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
3,750.000
|
$21.510
|
$22.000
|
$37.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
3,375.000
|
$23.010
|
$33.000
|
$45.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
750.000
|
$251.760
|
$210.000
|
$255.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
625.000
|
$298.830
|
$220.000
|
$280.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
300.000
|
$293.000
|
$250.000
|
$292.000
|
|
|
FULL - DEPTH REPAIR CRCP (15")
|
SY
|
100.000
|
$340.520
|
$300.000
|
$310.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
50.000
|
$512.390
|
$490.000
|
$350.000
|
|
|
STRUCT EXCAV
|
CY
|
25.000
|
$45.180
|
$100.000
|
$14.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
50.000
|
$93.020
|
$95.000
|
$35.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
50.000
|
$142.590
|
$100.000
|
$40.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
25.000
|
$74.830
|
$115.000
|
$95.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
20.000
|
$183.760
|
$200.000
|
$163.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
25.000
|
$88.470
|
$150.000
|
$59.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
13.000
|
$123.500
|
$200.000
|
$59.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
19.000
|
$372.390
|
$300.000
|
$250.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
2,500.000
|
$13.820
|
$20.000
|
$32.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
5.000
|
$64.640
|
$150.000
|
$55.000
|
|
|
INLET (STG II)(TY C)
|
EA
|
2.000
|
$1,200.000
|
$1,750.000
|
$1,550.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$411.520
|
$1,000.000
|
$300.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
52.000
|
$525.060
|
$2,750.000
|
$50.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
10.000
|
$518.820
|
$3,000.000
|
$500.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
|
LF
|
300.000
|
$35.000
|
$10.000
|
$25.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
500.000
|
$25.640
|
$6.000
|
$3.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 2)
|
LF
|
500.000
|
$10.430
|
$6.000
|
$2.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
500.000
|
$36.710
|
$5.000
|
$2.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$14.910
|
$12.000
|
$15.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
500.000
|
$2.040
|
$5.000
|
$2.000
|
|
|
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
|
LF
|
35.000
|
$29.120
|
$75.000
|
$17.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
35.000
|
$24.930
|
$50.000
|
$25.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
200.000
|
$45.670
|
$50.000
|
$55.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
200.000
|
$118.800
|
$55.000
|
$55.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
25.000
|
$16.400
|
$50.000
|
$90.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
1.000
|
$10.730
|
$100.000
|
$9.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$21.920
|
$17.750
|
$17.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$25.790
|
$19.000
|
$19.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$114.060
|
$275.000
|
$295.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,417.980
|
$1,950.000
|
$1,730.000
|
|
|
SHORT RADIUS
|
LF
|
75.000
|
$28.130
|
$50.000
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$2.910
|
$20.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$246.430
|
$750.000
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,517.070
|
$2,400.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$177.350
|
$500.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$1,566.660
|
$2,000.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,563.630
|
$2,000.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$2,308.330
|
$2,000.000
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$795.680
|
$2,500.000
|
$600.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
100.000
|
$20.370
|
$25.000
|
$16.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
100.000
|
$10.730
|
$20.000
|
$20.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
600.000
|
$24.090
|
$14.500
|
$15.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
28.000
|
$20.930
|
$29.000
|
$15.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
32.000
|
$29.690
|
$35.000
|
$42.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
1,000.000
|
$21.790
|
$14.500
|
$15.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
500.000
|
$19.240
|
$14.500
|
$15.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
500.000
|
$27.230
|
$38.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
7.000
|
$3.280
|
$4.000
|
$5.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
750.000
|
$1.220
|
$1.250
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
17,500.000
|
$0.710
|
$0.700
|
$1.060
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
7,500.000
|
$2.490
|
$2.900
|
$1.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
4,500.000
|
$4.370
|
$5.400
|
$3.200
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
50.000
|
$105.400
|
$105.000
|
$106.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
20.000
|
$137.520
|
$175.000
|
$160.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$148.500
|
$200.000
|
$185.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
10.000
|
$123.150
|
$155.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
25.000
|
$132.510
|
$150.000
|
$90.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
7.000
|
$567.550
|
$750.000
|
$530.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$580.200
|
$650.000
|
$530.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
100.000
|
$3.010
|
$4.250
|
$3.200
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$97.010
|
$200.000
|
$91.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
1.000
|
$38.760
|
$150.000
|
$38.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.030
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.240
|
$3.000
|
$1.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
750.000
|
$4.070
|
$6.000
|
$3.200
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$121.960
|
$215.000
|
$58.420
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
15,000.000
|
$0.430
|
$0.600
|
$0.480
|
|
|
PAVEMENT SEALER 6"
|
LF
|
60,500.000
|
$0.080
|
$0.070
|
$0.010
|
|
|
PAVEMENT SEALER 8"
|
LF
|
19,500.000
|
$0.140
|
$0.110
|
$0.020
|
|
|
PAVEMENT SEALER 12"
|
LF
|
8,500.000
|
$0.240
|
$0.310
|
$0.050
|
|
|
PAVEMENT SEALER 24"
|
LF
|
5,250.000
|
$0.630
|
$0.400
|
$0.110
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
25.000
|
$12.380
|
$50.000
|
$1.060
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
25.000
|
$14.420
|
$50.000
|
$1.060
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
5.000
|
$12.850
|
$70.000
|
$1.060
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
20.000
|
$18.360
|
$50.000
|
$1.060
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$48.280
|
$50.000
|
$1.060
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
13.000
|
$14.510
|
$45.000
|
$1.060
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
5.000
|
$116.240
|
$200.000
|
$1.060
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
5.000
|
$146.680
|
$250.000
|
$1.060
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$35.000
|
$70.000
|
$1.060
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
5.000
|
$50.040
|
$105.000
|
$1.060
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
35.000
|
$8.580
|
$65.000
|
$1.060
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
15.000
|
$1.000
|
$65.000
|
$1.060
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,500.000
|
$0.390
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
16,250.000
|
$0.340
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.310
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,000.000
|
$0.330
|
$0.600
|
$0.500
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
2.000
|
$1,975.980
|
$2,600.000
|
$1,063.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$2.240
|
$5.000
|
$3.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
125.000
|
$2.490
|
$5.000
|
$3.200
|
|
REFL PAV MRKR TY I-R
|
EA
|
125.000
|
$3.040
|
$5.000
|
$3.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
500.000
|
$2.300
|
$5.000
|
$3.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,250.000
|
$2.740
|
$4.000
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
250.000
|
$0.290
|
$0.450
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
60,500.000
|
$0.230
|
$0.400
|
$0.220
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
18,000.000
|
$0.380
|
$0.500
|
$0.330
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
8,500.000
|
$0.580
|
$0.850
|
$1.080
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
5,250.000
|
$1.220
|
$1.500
|
$2.150
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
25.000
|
$27.610
|
$65.000
|
$26.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
20.000
|
$31.930
|
$70.000
|
$32.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
1.000
|
$44.840
|
$90.000
|
$37.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
25.000
|
$29.450
|
$70.000
|
$43.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
5.000
|
$168.820
|
$300.000
|
$265.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
5.000
|
$238.820
|
$300.000
|
$265.000
|
|
|
ELIM EXT PAV MRK & MRKS (ISLAND)
|
SF
|
15.000
|
$2.200
|
$1.500
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
5.000
|
$103.090
|
$250.000
|
$266.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$64.580
|
$65.000
|
$48.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
35.000
|
$16.870
|
$60.000
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
5.000
|
$40.200
|
$200.000
|
$53.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
2.000
|
$211.850
|
$415.000
|
$64.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
10.000
|
$25.970
|
$90.000
|
$48.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
60,500.000
|
$0.010
|
$0.040
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
18,000.000
|
$0.040
|
$0.070
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
8,500.000
|
$0.100
|
$0.080
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,275.000
|
$0.140
|
$0.150
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
25.000
|
$6.010
|
$8.150
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
20.000
|
$7.650
|
$10.500
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$6.900
|
$10.500
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
10.000
|
$8.260
|
$9.800
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$6.300
|
$9.800
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
5.000
|
$33.800
|
$90.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
5.000
|
$29.930
|
$90.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$16.830
|
$25.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$1.220
|
$10.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
35.000
|
$5.140
|
$10.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
5.000
|
$7.520
|
$18.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
2.000
|
$111.840
|
$150.000
|
$5.300
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
65.000
|
$84.960
|
$115.000
|
$270.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
25,000.000
|
$2.470
|
$1.650
|
$2.400
|
|
|
FULL - WIDTH MOWING
|
AC
|
3,000.000
|
$30.410
|
$43.000
|
$40.000
|
|
|
SPOT MOWING
|
AC
|
200.000
|
$37.670
|
$75.000
|
$40.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
250.000
|
$127.720
|
$75.000
|
$275.000
|
|
|
LITTER REMOVAL
|
AC
|
10,000.000
|
$11.070
|
$14.000
|
$17.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
175.000
|
$11.250
|
$30.000
|
$30.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
2,000.000
|
$197.810
|
$90.000
|
$100.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
2,000.000
|
$204.400
|
$90.000
|
$100.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
1,000.000
|
$185.370
|
$175.000
|
$200.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
420.000
|
$168.090
|
$160.000
|
$100.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
200.000
|
$173.490
|
$160.000
|
$200.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
800,000.000
|
$0.230
|
$0.030
|
$0.170
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
MI
|
240.000
|
$169.410
|
$160.000
|
$220.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
5,000.000
|
$3.340
|
$5.000
|
$2.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
2,500.000
|
$0.770
|
$4.000
|
$2.500
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
2,000.000
|
$4.050
|
$6.000
|
$1.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
20,000.000
|
$1.610
|
$1.000
|
$3.550
|
|
|
DRAIN INLET CLEANING
|
EA
|
130.000
|
$101.290
|
$100.000
|
$88.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
12.000
|
$1,697.640
|
$1,750.000
|
$1,900.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
12.000
|
$473.820
|
$540.000
|
$560.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
8.000
|
$121.300
|
$400.000
|
$340.000
|
|
|
SUMP CLEANING
|
EA
|
4.000
|
$583.040
|
$650.000
|
$670.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
500.000
|
$1.430
|
$4.000
|
$3.400
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
5,000.000
|
$2.970
|
$4.000
|
$4.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
8,000.000
|
$3.780
|
$6.000
|
$5.300
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
5,000.000
|
$4.750
|
$7.000
|
$6.200
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
3,500.000
|
$6.810
|
$8.000
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
1,750.000
|
$8.370
|
$8.500
|
$7.850
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
600.000
|
$10.870
|
$14.000
|
$10.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
75.000
|
$13.140
|
$25.000
|
$20.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
50.000
|
$68.660
|
$50.000
|
$28.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
200.000
|
$6.740
|
$15.000
|
$10.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
1,500.000
|
$15.170
|
$15.000
|
$15.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
5.000
|
$25.280
|
$75.000
|
$5.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
5.000
|
$24.710
|
$50.000
|
$5.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
500.000
|
$5.450
|
$9.000
|
$10.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
20.000
|
$37.780
|
$150.000
|
$29.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
20.000
|
$38.620
|
$150.000
|
$38.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
5.000
|
$143.800
|
$50.000
|
$35.000
|
|
|
REALIGN POSTS
|
EA
|
7.000
|
$18.970
|
$50.000
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
250.000
|
$21.030
|
$20.000
|
$19.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
63.000
|
$52.430
|
$75.000
|
$45.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
3.000
|
$2,813.790
|
$2,450.000
|
$2,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
13.000
|
$909.610
|
$800.000
|
$900.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
13.000
|
$145.010
|
$100.000
|
$100.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
5.000
|
$70.260
|
$250.000
|
$100.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
5.000
|
$82.570
|
$200.000
|
$83.000
|
|
|
REPLACE SGT STRUT
|
EA
|
5.000
|
$71.130
|
$150.000
|
$58.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
5.000
|
$21.290
|
$50.000
|
$17.000
|
|
|
REM & REPLACE BLOCKOUTS (FURNISHED)
|
EA
|
100.000
|
$17.390
|
$20.000
|
$7.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
5.000
|
$246.890
|
$200.000
|
$34.000
|
|
|
REPAIR SINGLE GUARDRAIL TERMINAL
|
EA
|
1.000
|
$2,086.380
|
$500.000
|
$1,500.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$14,946.870
|
$18,500.000
|
$19,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$24,400.000
|
$35,000.000
|
$28,500.000
|
|
|
REPAIR (TRACC)
|
EA
|
5.000
|
$2,837.880
|
$2,500.000
|
$3,000.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
1.000
|
$2,541.660
|
$4,500.000
|
$5,000.000
|
|
|
REPAIR (CATCB - FRNT SECT)
|
EA
|
5.000
|
$909.090
|
$900.000
|
$500.000
|
|
|
REPAIR (CATCB - REAR SECT)
|
EA
|
5.000
|
$580.000
|
$600.000
|
$500.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
1.000
|
$1,613.910
|
$2,750.000
|
$1,200.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
5.000
|
$1,049.260
|
$875.000
|
$950.000
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
5.000
|
$393.750
|
$350.000
|
$50.000
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
5.000
|
$212.500
|
$250.000
|
$50.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
5.000
|
$886.450
|
$800.000
|
$250.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
5.000
|
$2,551.410
|
$2,700.000
|
$2,800.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
5.000
|
$1,546.510
|
$250.000
|
$1,100.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
1.000
|
$1,028.700
|
$2,000.000
|
$2,500.000
|
|
|
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
|
EA
|
5.000
|
$1,130.950
|
$1,500.000
|
$950.000
|
|
|
REPAIR REACT (MISC) (HARDWARE)
|
EA
|
3.000
|
$692.300
|
$800.000
|
$850.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
5.000
|
$2,149.120
|
$2,500.000
|
$2,800.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
1.000
|
$990.320
|
$2,000.000
|
$1,500.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
1.000
|
$1,848.610
|
$2,500.000
|
$2,800.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
5.000
|
$2,722.820
|
$550.000
|
$750.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
1.000
|
$2,100.000
|
$2,500.000
|
$2,000.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
5.000
|
$1,255.880
|
$1,100.000
|
$2,000.000
|
|
|
REPAIR TAU II (N)
|
LF
|
50.000
|
$232.380
|
$250.000
|
$250.000
|
|
|
REPAIR TAU II (W)
|
LF
|
10.000
|
$225.000
|
$200.000
|
$275.000
|
|
|
REPAIR TAU II (W) (MISC HARDWARE)
|
EA
|
1.000
|
$2,700.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
1.000
|
$3,200.000
|
$3,000.000
|
$5,000.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
30.000
|
$109.670
|
$50.000
|
$125.000
|
|
|
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
|
LF
|
10.000
|
$120.000
|
$100.000
|
$125.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
50.000
|
$49.320
|
$35.000
|
$95.000
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
50.000
|
$65.680
|
$90.000
|
$68.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
100.000
|
$325.000
|
$250.000
|
$200.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
100.000
|
$444.650
|
$250.000
|
$250.000
|
|
|
TYPE CAC CONCRETE
|
CY
|
10.000
|
$3,248.360
|
$2,050.000
|
$2,200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$117.310
|
$125.000
|
$80.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
13.000
|
$500.000
|
$750.000
|
$1,500.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$205.710
|
$275.000
|
$400.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$124.000
|
$300.000
|
$100.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
25.000
|
$8.280
|
$20.000
|
$5.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
100.000
|
$60.240
|
$140.000
|
$52.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
100.000
|
$79.300
|
$115.000
|
$44.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
100.000
|
$53.800
|
$120.000
|
$58.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
3.000
|
$50,000.000
|
$100,000.000
|
$55,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
100.000
|
$52.360
|
$120.000
|
$31.000
|
|
Totals: |
$3,606,333.090
|
$3,379,711.000
|
$3,416,465.050
|