PREPARING ROW
|
AC
|
1.000
|
$35,000.000
|
$5,000.000
|
$30,000.000
|
$5,250.000
|
$22,000.000
|
$30,000.000
|
$50,000.000
|
$500,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
29,856.000
|
$6.000
|
$6.000
|
$10.000
|
$13.000
|
$12.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
149.000
|
$21.000
|
$22.000
|
$15.000
|
$7.800
|
$15.000
|
$10.000
|
$6.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
15.500
|
$5.000
|
$90.000
|
$15.000
|
$33.000
|
$40.000
|
$100.000
|
$39.480
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
80.000
|
$19.000
|
$45.000
|
$15.000
|
$7.800
|
$10.000
|
$20.000
|
$13.020
|
$20.000
|
|
|
REMOVING CONC (MOVABLE BARRIER)
|
LF
|
8,098.000
|
$8.800
|
$10.000
|
$13.000
|
$7.900
|
$9.000
|
$10.000
|
$7.790
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
925.000
|
$7.000
|
$9.000
|
$10.000
|
$6.300
|
$9.000
|
$6.000
|
$6.000
|
$50.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
4,420.000
|
$11.500
|
$0.010
|
$0.100
|
$8.400
|
$5.000
|
$0.350
|
$0.110
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
29,856.000
|
$10.000
|
$5.000
|
$4.000
|
$11.000
|
$4.000
|
$1.000
|
$3.800
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-2")
|
SY
|
731.000
|
$3.750
|
$15.000
|
$10.000
|
$6.500
|
$25.000
|
$4.500
|
$5.660
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,493.040
|
$5.200
|
$40.000
|
$26.000
|
$20.500
|
$20.000
|
$20.000
|
$21.610
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,235.000
|
$13.750
|
$30.000
|
$11.000
|
$7.200
|
$22.000
|
$20.000
|
$33.880
|
$30.000
|
|
|
BLADING
|
LF
|
5,055.000
|
$1.500
|
$7.000
|
$2.000
|
$3.000
|
$3.750
|
$2.000
|
$2.210
|
$5.000
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
2,815.000
|
$3.300
|
$8.000
|
$2.000
|
$11.000
|
$8.000
|
$5.000
|
$8.500
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
10,522.000
|
$4.230
|
$5.000
|
$4.500
|
$4.500
|
$4.150
|
$4.500
|
$4.150
|
$10.000
|
|
|
FERTILIZER
|
AC
|
2.100
|
$620.000
|
$850.000
|
$800.000
|
$1,200.000
|
$750.000
|
$1,525.000
|
$750.000
|
$5,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
250.400
|
$26.000
|
$35.000
|
$35.000
|
$36.800
|
$30.000
|
$50.000
|
$41.110
|
$30.000
|
|
|
LANDSCAPE EDGE
|
LF
|
132.000
|
$30.000
|
$23.000
|
$20.000
|
$20.000
|
$25.000
|
$72.990
|
$38.620
|
$20.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
15,531.000
|
$156.000
|
$98.000
|
$120.000
|
$110.300
|
$106.000
|
$95.000
|
$122.240
|
$125.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
1,706.000
|
$132.000
|
$120.000
|
$140.000
|
$118.700
|
$114.000
|
$100.000
|
$178.920
|
$125.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0"TO 4")
|
SY
|
4,556.000
|
$4.000
|
$7.000
|
$1.000
|
$4.500
|
$2.000
|
$5.000
|
$2.470
|
$20.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
4,556.000
|
$4.000
|
$5.000
|
$1.000
|
$4.500
|
$6.000
|
$10.000
|
$11.170
|
$20.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
14,958.000
|
$80.000
|
$75.000
|
$85.000
|
$82.500
|
$84.000
|
$110.000
|
$112.930
|
$150.000
|
|
|
CONC PVMT (JOINTED - CPCD) (13")
|
SY
|
16,053.000
|
$90.000
|
$82.000
|
$82.000
|
$105.000
|
$125.000
|
$145.000
|
$139.230
|
$200.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
862.000
|
$163.810
|
$150.000
|
$145.000
|
$141.400
|
$200.000
|
$190.000
|
$160.770
|
$300.000
|
|
|
CONC PVMT (CONT REINF) (FAST TRK) (9")
|
SY
|
324.000
|
$140.000
|
$200.000
|
$160.000
|
$85.900
|
$150.000
|
$185.000
|
$133.600
|
$250.000
|
|
|
STRUCT EXCAV
|
CY
|
38.000
|
$6.000
|
$110.000
|
$5.000
|
$15.800
|
$27.000
|
$20.000
|
$44.970
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
44.000
|
$50.000
|
$80.000
|
$60.000
|
$64.100
|
$77.000
|
$85.000
|
$54.900
|
$350.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
25.000
|
$54.500
|
$80.000
|
$60.000
|
$64.100
|
$77.000
|
$85.000
|
$54.900
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10.000
|
$2.000
|
$100.000
|
$10.000
|
$1.100
|
$110.000
|
$10.000
|
$55.570
|
$10.000
|
|
|
CL C CONC (HEADWALL)
|
CY
|
1.000
|
$1,200.000
|
$5,000.000
|
$2,500.000
|
$4,121.300
|
$2,500.000
|
$10,000.000
|
$1,640.370
|
$6,500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$500.000
|
$3,500.000
|
$1,400.000
|
$676.200
|
$550.000
|
$2,750.000
|
$639.810
|
$1,000.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$514.500
|
$3,500.000
|
$1,400.000
|
$676.200
|
$550.000
|
$2,750.000
|
$597.690
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$543.000
|
$1,000.000
|
$700.000
|
$507.700
|
$450.000
|
$875.000
|
$637.220
|
$650.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
10.000
|
$150.000
|
$300.000
|
$350.000
|
$289.400
|
$300.000
|
$650.000
|
$517.460
|
$600.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
200.000
|
$96.000
|
$200.000
|
$250.000
|
$163.600
|
$160.000
|
$200.000
|
$176.920
|
$200.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
2.000
|
$4,919.000
|
$9,500.000
|
$5,500.000
|
$5,190.600
|
$8,000.000
|
$6,950.000
|
$4,810.120
|
$12,500.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
1.000
|
$6,172.000
|
$9,500.000
|
$8,200.000
|
$5,955.900
|
$8,000.000
|
$11,500.000
|
$5,500.170
|
$12,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$744.000
|
$1,500.000
|
$500.000
|
$577.500
|
$600.000
|
$1,500.000
|
$778.110
|
$3,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$424.000
|
$1,500.000
|
$500.000
|
$577.500
|
$600.000
|
$750.000
|
$502.990
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,830.380
|
$5,000.000
|
$1,000.000
|
$787.500
|
$600.000
|
$2,875.000
|
$4,023.870
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
48.000
|
$30.000
|
$50.000
|
$80.000
|
$21.000
|
$35.000
|
$65.000
|
$50.180
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$755,000.000
|
$800,000.000
|
$860,000.000
|
$965,000.000
|
$880,909.100
|
$165,000.000
|
$1,051,000.000
|
$1,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$6,250.000
|
$30,000.000
|
$10,500.000
|
$20,000.000
|
$77,750.000
|
$50,000.000
|
$8,500.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
150.000
|
$38.000
|
$10.000
|
$25.000
|
$3.200
|
$7.850
|
$10.000
|
$10.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,160.000
|
$3.000
|
$4.000
|
$4.000
|
$2.100
|
$3.500
|
$4.250
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,160.000
|
$0.700
|
$1.000
|
$1.000
|
$0.500
|
$1.000
|
$1.250
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
248.000
|
$12.000
|
$7.000
|
$7.000
|
$15.800
|
$6.000
|
$9.750
|
$6.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
248.000
|
$1.500
|
$2.000
|
$2.000
|
$5.300
|
$1.500
|
$2.500
|
$1.500
|
$9.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
5,140.000
|
$8.000
|
$12.000
|
$20.000
|
$13.500
|
$13.000
|
$17.500
|
$10.060
|
$30.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
4,770.000
|
$8.000
|
$12.000
|
$17.000
|
$12.400
|
$10.000
|
$17.500
|
$10.150
|
$30.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$15.000
|
$17.000
|
$12.400
|
$11.000
|
$17.500
|
$13.550
|
$30.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,020.000
|
$5.000
|
$8.000
|
$6.000
|
$11.600
|
$7.500
|
$4.000
|
$3.980
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
8,850.000
|
$5.000
|
$5.000
|
$6.000
|
$9.800
|
$7.000
|
$4.500
|
$3.990
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$9.000
|
$15.000
|
$6.000
|
$9.800
|
$7.000
|
$4.500
|
$16.460
|
$20.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
5,140.000
|
$9.000
|
$10.000
|
$10.000
|
$13.300
|
$11.000
|
$15.000
|
$9.030
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
4,778.000
|
$9.000
|
$10.000
|
$10.000
|
$12.100
|
$8.000
|
$15.000
|
$9.740
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$12.000
|
$10.000
|
$12.100
|
$8.000
|
$15.000
|
$14.550
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
8,100.000
|
$75.000
|
$66.000
|
$75.000
|
$71.600
|
$85.000
|
$115.000
|
$67.720
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
24.000
|
$5.300
|
$200.000
|
$350.000
|
$326.000
|
$85.000
|
$250.000
|
$85.170
|
$20.000
|
|
|
PERM CTB (TRAN SSCB TO CTB) (MOD)
|
LF
|
24.000
|
$68.000
|
$200.000
|
$350.000
|
$326.000
|
$150.000
|
$250.000
|
$502.550
|
$350.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
30.000
|
$220.000
|
$150.000
|
$100.000
|
$56.200
|
$140.000
|
$250.000
|
$217.000
|
$200.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
4,775.000
|
$10.000
|
$7.000
|
$6.000
|
$4.100
|
$6.000
|
$10.000
|
$3.860
|
$20.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
197.000
|
$14.300
|
$18.000
|
$20.000
|
$4.100
|
$10.000
|
$25.000
|
$6.810
|
$65.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
121.000
|
$35.000
|
$75.000
|
$82.000
|
$72.900
|
$13.000
|
$110.000
|
$11.520
|
$100.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
105.000
|
$52.000
|
$110.000
|
$116.000
|
$67.500
|
$140.000
|
$140.000
|
$64.570
|
$75.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,987.000
|
$2,250.000
|
$2,100.000
|
$1,380.000
|
$1,850.000
|
$3,450.000
|
$2,078.840
|
$2,850.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$4,129.000
|
$2,250.000
|
$3,300.000
|
$2,489.700
|
$2,300.000
|
$5,325.000
|
$4,191.150
|
$2,850.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
13.000
|
$2,000.000
|
$2,250.000
|
$2,100.000
|
$1,856.900
|
$2,700.000
|
$3,250.000
|
$2,075.940
|
$2,850.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,415.000
|
$2,800.000
|
$4,300.000
|
$4,215.700
|
$3,865.000
|
$8,925.000
|
$2,923.010
|
$2,850.000
|
|
|
CONC MEDIAN
|
SY
|
135.000
|
$63.000
|
$120.000
|
$100.000
|
$73.000
|
$120.000
|
$185.000
|
$80.960
|
$150.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
750.000
|
$26.200
|
$20.000
|
$25.000
|
$28.800
|
$30.000
|
$22.500
|
$22.500
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,400.000
|
$2,800.000
|
$1,600.000
|
$1,559.300
|
$1,500.000
|
$1,585.000
|
$1,585.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$2.000
|
$8.000
|
$3.000
|
$5.300
|
$5.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$297.000
|
$400.000
|
$440.000
|
$555.600
|
$530.000
|
$400.000
|
$400.000
|
$500.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$162.000
|
$450.000
|
$200.000
|
$262.500
|
$250.000
|
$150.000
|
$150.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,235.000
|
$5,000.000
|
$3,250.000
|
$3,870.500
|
$3,700.000
|
$2,875.000
|
$2,875.000
|
$3,250.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$3,810.000
|
$900.000
|
$5,000.000
|
$1,994.800
|
$2,500.000
|
$4,750.000
|
$4,750.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,515.000
|
$1,000.000
|
$5,000.000
|
$1,853.100
|
$1,900.000
|
$4,750.000
|
$4,750.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$960.000
|
$1,000.000
|
$1,600.000
|
$1,369.600
|
$1,900.000
|
$1,500.000
|
$1,500.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
14.000
|
$700.000
|
$800.000
|
$600.000
|
$765.900
|
$760.000
|
$550.000
|
$550.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
2.000
|
$447.000
|
$85.000
|
$100.000
|
$78.800
|
$200.000
|
$90.000
|
$90.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$135.000
|
$150.000
|
$110.000
|
$136.500
|
$90.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
20.000
|
$37.000
|
$30.000
|
$40.000
|
$30.800
|
$30.000
|
$35.000
|
$35.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
3.000
|
$500.000
|
$485.000
|
$300.000
|
$623.400
|
$595.000
|
$250.000
|
$250.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
27,000.000
|
$0.900
|
$1.500
|
$1.500
|
$1.400
|
$1.350
|
$1.350
|
$1.350
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
17,390.000
|
$0.900
|
$1.500
|
$1.500
|
$1.400
|
$1.350
|
$1.350
|
$1.350
|
$0.500
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
2,400.000
|
$3.500
|
$5.000
|
$5.500
|
$5.000
|
$4.750
|
$4.750
|
$4.750
|
$20.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
20,775.000
|
$0.180
|
$0.050
|
$0.040
|
$0.030
|
$0.030
|
$0.030
|
$0.030
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,913.000
|
$0.250
|
$0.050
|
$0.050
|
$0.040
|
$0.040
|
$0.040
|
$0.040
|
$3.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,220.000
|
$0.300
|
$0.050
|
$0.100
|
$0.100
|
$0.060
|
$0.060
|
$0.060
|
$4.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
288.000
|
$0.400
|
$0.150
|
$0.200
|
$0.100
|
$0.120
|
$0.120
|
$0.120
|
$6.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
10.000
|
$14.000
|
$5.500
|
$6.000
|
$5.300
|
$5.000
|
$5.000
|
$5.000
|
$150.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
7.000
|
$15.000
|
$5.500
|
$6.000
|
$5.300
|
$5.000
|
$5.000
|
$5.000
|
$150.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$14.000
|
$5.500
|
$6.000
|
$5.300
|
$5.000
|
$5.000
|
$5.000
|
$250.000
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
10.000
|
$671.000
|
$550.000
|
$550.000
|
$511.500
|
$500.000
|
$487.120
|
$487.120
|
$250.000
|
|
PREFAB PAV MRK TY B (W)(DBL ARROW)
|
EA
|
2.000
|
$1,500.000
|
$925.000
|
$900.000
|
$875.700
|
$835.000
|
$834.010
|
$834.010
|
$250.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
7.000
|
$650.000
|
$900.000
|
$900.000
|
$848.100
|
$810.000
|
$807.670
|
$807.670
|
$250.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
14.000
|
$7.000
|
$7.500
|
$8.000
|
$7.400
|
$7.000
|
$7.000
|
$7.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
240.000
|
$4.900
|
$7.500
|
$8.000
|
$7.400
|
$7.000
|
$7.000
|
$7.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
36,189.000
|
$0.350
|
$0.700
|
$0.700
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,008.000
|
$0.700
|
$1.000
|
$0.900
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,002.000
|
$1.650
|
$1.700
|
$1.650
|
$1.600
|
$1.500
|
$1.500
|
$1.500
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
288.000
|
$2.750
|
$3.500
|
$3.300
|
$3.200
|
$3.000
|
$3.000
|
$3.000
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
10.000
|
$39.000
|
$56.000
|
$60.000
|
$52.500
|
$50.000
|
$50.000
|
$50.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$76.000
|
$56.000
|
$60.000
|
$52.500
|
$50.000
|
$50.000
|
$50.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$48.000
|
$56.000
|
$60.000
|
$52.500
|
$50.000
|
$50.000
|
$50.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
19,835.000
|
$0.080
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,969.000
|
$0.100
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,296.000
|
$0.150
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
288.000
|
$0.280
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
10.000
|
$7.000
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$11.000
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$9.000
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
241.000
|
$0.250
|
$0.050
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
$50.000
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
12.000
|
$2,800.000
|
$2,450.000
|
$5,000.000
|
$2,121.000
|
$3,000.000
|
$2,200.000
|
$2,200.000
|
$6,500.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
12.000
|
$770.000
|
$1,150.000
|
$1,100.000
|
$1,060.500
|
$3,500.000
|
$1,010.000
|
$1,010.000
|
$1,850.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
12.000
|
$2,770.000
|
$2,450.000
|
$2,800.000
|
$2,294.300
|
$685.000
|
$2,185.000
|
$2,185.000
|
$6,500.000
|
|
|
REMOVE LUMINAIRE POLE
|
EA
|
2.000
|
$372.000
|
$840.000
|
$500.000
|
$787.500
|
$1,662.500
|
$750.000
|
$750.000
|
$2,500.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
4,995.000
|
$10.000
|
$4.000
|
$10.000
|
$5.400
|
$5.160
|
$12.650
|
$31.880
|
$5.000
|
|
|
SP MIXES SP-D SAC-A PG64-22
|
TON
|
4,313.000
|
$90.000
|
$130.000
|
$10.000
|
$134.400
|
$129.030
|
$129.660
|
$150.030
|
$155.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
19.000
|
$11,500.000
|
$8,000.000
|
$5,000.000
|
$16,878.800
|
$10,000.000
|
$5,500.000
|
$7,853.540
|
$16,500.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
8,291.000
|
$0.750
|
$2.500
|
$2.400
|
$2.300
|
$2.180
|
$2.180
|
$2.180
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
5,280.000
|
$0.700
|
$2.500
|
$2.400
|
$2.300
|
$2.180
|
$2.180
|
$2.180
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
279.000
|
$1.250
|
$3.000
|
$3.300
|
$3.200
|
$3.000
|
$3.000
|
$3.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
3,121.000
|
$1.200
|
$3.500
|
$4.000
|
$3.700
|
$3.500
|
$3.500
|
$3.500
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
150.000
|
$3.300
|
$6.500
|
$7.000
|
$6.300
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
4,800.000
|
$3.450
|
$2.200
|
$2.200
|
$2.100
|
$2.000
|
$2.000
|
$2.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
280.000
|
$6.100
|
$13.500
|
$13.000
|
$12.600
|
$12.000
|
$12.000
|
$12.000
|
$20.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
4,800.000
|
$0.750
|
$2.500
|
$2.400
|
$2.300
|
$2.180
|
$2.180
|
$2.180
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
505.000
|
$1.100
|
$4.000
|
$4.000
|
$3.700
|
$3.500
|
$3.500
|
$3.500
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
343.000
|
$3.450
|
$7.000
|
$7.000
|
$6.300
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
3,500.000
|
$0.850
|
$2.500
|
$2.400
|
$2.300
|
$2.180
|
$2.180
|
$2.180
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
38.000
|
$277.700
|
$490.000
|
$300.000
|
$341.300
|
$300.000
|
$500.000
|
$259.190
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$170.000
|
$1,450.000
|
$700.000
|
$624.800
|
$800.000
|
$750.000
|
$385.550
|
$550.000
|
|
|
WATER FILLED BARRIER (350)(TL-3)
|
LF
|
320.000
|
$300.000
|
$78.000
|
$200.000
|
$118.100
|
$250.000
|
$153.860
|
$67.590
|
$100.000
|
|
|
PERM CONC TRAFF BARRIER REPLACE
|
LF
|
15.000
|
$180.000
|
$22.000
|
$600.000
|
$126.000
|
$250.000
|
$250.000
|
$177.900
|
$1,000.000
|
|
Totals: |
$9,199,480.708
|
$8,283,077.100
|
$8,667,559.590
|
$9,593,154.410
|
$9,690,000.150
|
$10,227,716.030
|
$10,952,053.858
|
$14,770,177.300
|