HARRIS SL 8 (3256-02-093)

Items: 137

County: HARRIS
Length: N/A
Highway: SL 8
District: HOUSTON
Control Number: 3256-02-093
DBE Goal: N/A
Project: C 3256-2-93
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $9,199,476.40
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: RECONSTRUCT EB AND WB FRONTAGE ROADS
Mail/Deliver Bids To: N/A
PHILLIP GARLIN
ROGER LOPEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$9,199,476.40
$8,283,077.10
Over/Under Est: -9.96% -$916,399.30
Over/Under Est: -5.78% -$531,916.81
Amt Left: 4.64% $384,482.49
Over/Under Est: 4.28% $393,678.01
Amt Left: 15.82% $1,310,077.31
Delta: -10.68% -$925,594.82
$9,690,000.15
Over/Under Est: 5.33% $490,523.75
Amt Left: 16.99% $1,406,923.05
Delta: -1.01% -$96,845.74
Over/Under Est: 11.18% $1,028,239.63
Amt Left: 23.48% $1,944,638.93
Delta: -5.55% -$537,715.88
Over/Under Est: 19.05% $1,752,577.45
Amt Left: 32.22% $2,668,976.75
Delta: -7.08% -$724,337.82
$14,770,177.30
Over/Under Est: 60.55% $5,570,700.90
Amt Left: 78.32% $6,487,100.20
Delta: -34.86% -$3,818,123.45
Subcontractor Percentage Amount
GMJ PAVING COMPANY LLC 20.26% $2,089,203.43
HIGHWAY 1 LLC 2.51% $258,830.24
TRP CONSTRUCTION GROUP, LLC 2.51% $258,830.24
QUALITY TURF FARMS, L.C. 0.91% $93,838.85
SK CONCRETE SERVICES LLC 0.83% $85,589.28
A&J REBAR LLC 0.73% $75,277.32
ANDERSON DUMP TRUCKING, INC. 0.69% $71,152.54
HOUSTON CRUSHED CONCRETE, L.L.C. 0.67% $69,090.14
THIRD COAST SERVICES LLC 0.64% $65,996.55
ROMAR UNLIMITED, INC. 0.30% $30,935.88
SCOTT DERR PAINTING CO, LLC 0.23% $23,717.51
MTAM CORPORATION 0.23% $23,717.51
Total: 30.51% $3,146,179.49

Bid Items & Bid Tabulations

137 Total 0 of 137
HARRIS  |  SL 8  |  HOUSTON  |  3256-02-093  |  06/02/2023  |  $9,199,476.40  |  C 3256-2-93  |  RECON EB AND WB FRONTAGE ROADS  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
MAIN LANE INDUSTRIES LTD.
SER CONSTRUCTION PARTNERS, LLC
POSILLICO CIVIL, INC.
HARPER BROTHERS CONSTRUCTION LLC
JAMES CONSTRUCTION GROUP, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 1.000 $35,000.000 $5,000.000 $30,000.000 $5,250.000 $22,000.000 $30,000.000 $50,000.000 $500,000.000
REMOVING CONC (PAV)
SY 29,856.000 $6.000 $6.000 $10.000 $13.000 $12.000 $10.000 $10.000 $15.000
REMOVING CONC (MEDIANS)
SY 149.000 $21.000 $22.000 $15.000 $7.800 $15.000 $10.000 $6.000 $20.000
REMOVING CONC (MISC)
SY 15.500 $5.000 $90.000 $15.000 $33.000 $40.000 $100.000 $39.480 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 80.000 $19.000 $45.000 $15.000 $7.800 $10.000 $20.000 $13.020 $20.000
REMOVING CONC (MOVABLE BARRIER)
LF 8,098.000 $8.800 $10.000 $13.000 $7.900 $9.000 $10.000 $7.790 $20.000
REMOVING CONCRETE(MOW STRIP)
LF 925.000 $7.000 $9.000 $10.000 $6.300 $9.000 $6.000 $6.000 $50.000
REMOVING CONC (SAWCUT)
LF 4,420.000 $11.500 $0.010 $0.100 $8.400 $5.000 $0.350 $0.110 $20.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 29,856.000 $10.000 $5.000 $4.000 $11.000 $4.000 $1.000 $3.800 $20.000
REMOVING STAB BASE & ASPH PAV (0-2")
SY 731.000 $3.750 $15.000 $10.000 $6.500 $25.000 $4.500 $5.660 $20.000
EXCAVATION (ROADWAY)
CY 2,493.040 $5.200 $40.000 $26.000 $20.500 $20.000 $20.000 $21.610 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,235.000 $13.750 $30.000 $11.000 $7.200 $22.000 $20.000 $33.880 $30.000
BLADING
LF 5,055.000 $1.500 $7.000 $2.000 $3.000 $3.750 $2.000 $2.210 $5.000
FURNISHING AND PLACING TOPSOIL (6")
SY 2,815.000 $3.300 $8.000 $2.000 $11.000 $8.000 $5.000 $8.500 $10.000
BLOCK SODDING
SY 10,522.000 $4.230 $5.000 $4.500 $4.500 $4.150 $4.500 $4.150 $10.000
FERTILIZER
AC 2.100 $620.000 $850.000 $800.000 $1,200.000 $750.000 $1,525.000 $750.000 $5,000.000
VEGETATIVE WATERING
MG 250.400 $26.000 $35.000 $35.000 $36.800 $30.000 $50.000 $41.110 $30.000
LANDSCAPE EDGE
LF 132.000 $30.000 $23.000 $20.000 $20.000 $25.000 $72.990 $38.620 $20.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 15,531.000 $156.000 $98.000 $120.000 $110.300 $106.000 $95.000 $122.240 $125.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 1,706.000 $132.000 $120.000 $140.000 $118.700 $114.000 $100.000 $178.920 $125.000
SALV, HAUL & STKPL RCL APH PV (0"TO 4")
SY 4,556.000 $4.000 $7.000 $1.000 $4.500 $2.000 $5.000 $2.470 $20.000
PLANE ASPH CONC PAV(0" TO 4")
SY 4,556.000 $4.000 $5.000 $1.000 $4.500 $6.000 $10.000 $11.170 $20.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 14,958.000 $80.000 $75.000 $85.000 $82.500 $84.000 $110.000 $112.930 $150.000
CONC PVMT (JOINTED - CPCD) (13")
SY 16,053.000 $90.000 $82.000 $82.000 $105.000 $125.000 $145.000 $139.230 $200.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 862.000 $163.810 $150.000 $145.000 $141.400 $200.000 $190.000 $160.770 $300.000
CONC PVMT (CONT REINF) (FAST TRK) (9")
SY 324.000 $140.000 $200.000 $160.000 $85.900 $150.000 $185.000 $133.600 $250.000
STRUCT EXCAV
CY 38.000 $6.000 $110.000 $5.000 $15.800 $27.000 $20.000 $44.970 $100.000
CEM STABIL BKFL
CY 44.000 $50.000 $80.000 $60.000 $64.100 $77.000 $85.000 $54.900 $350.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 25.000 $54.500 $80.000 $60.000 $64.100 $77.000 $85.000 $54.900 $350.000
TRENCH EXCAVATION PROTECTION
LF 10.000 $2.000 $100.000 $10.000 $1.100 $110.000 $10.000 $55.570 $10.000
CL C CONC (HEADWALL)
CY 1.000 $1,200.000 $5,000.000 $2,500.000 $4,121.300 $2,500.000 $10,000.000 $1,640.370 $6,500.000
RIPRAP (CONC)(4 IN)
CY 2.000 $500.000 $3,500.000 $1,400.000 $676.200 $550.000 $2,750.000 $639.810 $1,000.000
RIPRAP (CONC)(CL B)
CY 2.000 $514.500 $3,500.000 $1,400.000 $676.200 $550.000 $2,750.000 $597.690 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $543.000 $1,000.000 $700.000 $507.700 $450.000 $875.000 $637.220 $650.000
RAIL (HANDRAIL)(TY B)
LF 10.000 $150.000 $300.000 $350.000 $289.400 $300.000 $650.000 $517.460 $600.000
RC PIPE (CL III)(24 IN)
LF 200.000 $96.000 $200.000 $250.000 $163.600 $160.000 $200.000 $176.920 $200.000
INLET (COMPL)(TY AD)
EA 2.000 $4,919.000 $9,500.000 $5,500.000 $5,190.600 $8,000.000 $6,950.000 $4,810.120 $12,500.000
INLET (COMPL)(CURB)(TY C)
EA 1.000 $6,172.000 $9,500.000 $8,200.000 $5,955.900 $8,000.000 $11,500.000 $5,500.170 $12,500.000
REMOV STR (INLET)
EA 1.000 $744.000 $1,500.000 $500.000 $577.500 $600.000 $1,500.000 $778.110 $3,500.000
REMOV STR (SET)
EA 4.000 $424.000 $1,500.000 $500.000 $577.500 $600.000 $750.000 $502.990 $500.000
REMOV STR (HEADWALL)
EA 1.000 $1,830.380 $5,000.000 $1,000.000 $787.500 $600.000 $2,875.000 $4,023.870 $2,500.000
REMOV STR (PIPE)
LF 48.000 $30.000 $50.000 $80.000 $21.000 $35.000 $65.000 $50.180 $50.000
MOBILIZATION
LS 1.000 $755,000.000 $800,000.000 $860,000.000 $965,000.000 $880,909.100 $165,000.000 $1,051,000.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,000.000 $6,250.000 $30,000.000 $10,500.000 $20,000.000 $77,750.000 $50,000.000 $8,500.000
CONSTRUCTION PERIMETER FENCE
LF 150.000 $38.000 $10.000 $25.000 $3.200 $7.850 $10.000 $10.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,160.000 $3.000 $4.000 $4.000 $2.100 $3.500 $4.250 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,160.000 $0.700 $1.000 $1.000 $0.500 $1.000 $1.250 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 248.000 $12.000 $7.000 $7.000 $15.800 $6.000 $9.750 $6.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 248.000 $1.500 $2.000 $2.000 $5.300 $1.500 $2.500 $1.500 $9.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 5,140.000 $8.000 $12.000 $20.000 $13.500 $13.000 $17.500 $10.060 $30.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 4,770.000 $8.000 $12.000 $17.000 $12.400 $10.000 $17.500 $10.150 $30.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $8.000 $15.000 $17.000 $12.400 $11.000 $17.500 $13.550 $30.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,020.000 $5.000 $8.000 $6.000 $11.600 $7.500 $4.000 $3.980 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 8,850.000 $5.000 $5.000 $6.000 $9.800 $7.000 $4.500 $3.990 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $9.000 $15.000 $6.000 $9.800 $7.000 $4.500 $16.460 $20.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 5,140.000 $9.000 $10.000 $10.000 $13.300 $11.000 $15.000 $9.030 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 4,778.000 $9.000 $10.000 $10.000 $12.100 $8.000 $15.000 $9.740 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $10.000 $12.000 $10.000 $12.100 $8.000 $15.000 $14.550 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 8,100.000 $75.000 $66.000 $75.000 $71.600 $85.000 $115.000 $67.720 $20.000
PERM CTB (SGL SLOPE) (TY 2) (42 )
LF 24.000 $5.300 $200.000 $350.000 $326.000 $85.000 $250.000 $85.170 $20.000
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 24.000 $68.000 $200.000 $350.000 $326.000 $150.000 $250.000 $502.550 $350.000
REMOVE AND RELAY PAVERS
SY 30.000 $220.000 $150.000 $100.000 $56.200 $140.000 $250.000 $217.000 $200.000
CONC CURB (MONO) (TY II)
LF 4,775.000 $10.000 $7.000 $6.000 $4.100 $6.000 $10.000 $3.860 $20.000
CONC CURB (SLOTTED)
LF 197.000 $14.300 $18.000 $20.000 $4.100 $10.000 $25.000 $6.810 $65.000
CONCRETE CURB (SPECIAL)
LF 121.000 $35.000 $75.000 $82.000 $72.900 $13.000 $110.000 $11.520 $100.000
CONC SIDEWALKS (4")
SY 105.000 $52.000 $110.000 $116.000 $67.500 $140.000 $140.000 $64.570 $75.000
CURB RAMPS (TY 1)
EA 2.000 $1,987.000 $2,250.000 $2,100.000 $1,380.000 $1,850.000 $3,450.000 $2,078.840 $2,850.000
CURB RAMPS (TY 5)
EA 4.000 $4,129.000 $2,250.000 $3,300.000 $2,489.700 $2,300.000 $5,325.000 $4,191.150 $2,850.000
CURB RAMPS (TY 7)
EA 13.000 $2,000.000 $2,250.000 $2,100.000 $1,856.900 $2,700.000 $3,250.000 $2,075.940 $2,850.000
CURB RAMPS (TY 21)
EA 1.000 $2,415.000 $2,800.000 $4,300.000 $4,215.700 $3,865.000 $8,925.000 $2,923.010 $2,850.000
CONC MEDIAN
SY 135.000 $63.000 $120.000 $100.000 $73.000 $120.000 $185.000 $80.960 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $26.200 $20.000 $25.000 $28.800 $30.000 $22.500 $22.500 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,400.000 $2,800.000 $1,600.000 $1,559.300 $1,500.000 $1,585.000 $1,585.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $2.000 $8.000 $3.000 $5.300 $5.000 $2.000 $2.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $297.000 $400.000 $440.000 $555.600 $530.000 $400.000 $400.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $162.000 $450.000 $200.000 $262.500 $250.000 $150.000 $150.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,235.000 $5,000.000 $3,250.000 $3,870.500 $3,700.000 $2,875.000 $2,875.000 $3,250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $3,810.000 $900.000 $5,000.000 $1,994.800 $2,500.000 $4,750.000 $4,750.000 $5,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,515.000 $1,000.000 $5,000.000 $1,853.100 $1,900.000 $4,750.000 $4,750.000 $5,000.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $960.000 $1,000.000 $1,600.000 $1,369.600 $1,900.000 $1,500.000 $1,500.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 14.000 $700.000 $800.000 $600.000 $765.900 $760.000 $550.000 $550.000 $1,000.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $447.000 $85.000 $100.000 $78.800 $200.000 $90.000 $90.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 14.000 $135.000 $150.000 $110.000 $136.500 $90.000 $100.000 $100.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 20.000 $37.000 $30.000 $40.000 $30.800 $30.000 $35.000 $35.000 $100.000
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 3.000 $500.000 $485.000 $300.000 $623.400 $595.000 $250.000 $250.000 $100.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 27,000.000 $0.900 $1.500 $1.500 $1.400 $1.350 $1.350 $1.350 $0.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 17,390.000 $0.900 $1.500 $1.500 $1.400 $1.350 $1.350 $1.350 $0.500
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,400.000 $3.500 $5.000 $5.500 $5.000 $4.750 $4.750 $4.750 $20.000
PAVEMENT SEALER 6"
LF 20,775.000 $0.180 $0.050 $0.040 $0.030 $0.030 $0.030 $0.030 $0.500
PAVEMENT SEALER 8"
LF 2,913.000 $0.250 $0.050 $0.050 $0.040 $0.040 $0.040 $0.040 $3.000
PAVEMENT SEALER 12"
LF 1,220.000 $0.300 $0.050 $0.100 $0.100 $0.060 $0.060 $0.060 $4.000
PAVEMENT SEALER 24"
LF 288.000 $0.400 $0.150 $0.200 $0.100 $0.120 $0.120 $0.120 $6.000
PAVEMENT SEALER (ARROW)
EA 10.000 $14.000 $5.500 $6.000 $5.300 $5.000 $5.000 $5.000 $150.000
PAVEMENT SEALER (WORD)
EA 7.000 $15.000 $5.500 $6.000 $5.300 $5.000 $5.000 $5.000 $150.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $14.000 $5.500 $6.000 $5.300 $5.000 $5.000 $5.000 $250.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 10.000 $671.000 $550.000 $550.000 $511.500 $500.000 $487.120 $487.120 $250.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 2.000 $1,500.000 $925.000 $900.000 $875.700 $835.000 $834.010 $834.010 $250.000
PREFAB PAV MRK TY B (W)(WORD)
EA 7.000 $650.000 $900.000 $900.000 $848.100 $810.000 $807.670 $807.670 $250.000
REFL PAV MRKR TY I-A
EA 14.000 $7.000 $7.500 $8.000 $7.400 $7.000 $7.000 $7.000 $6.000
REFL PAV MRKR TY II-C-R
EA 240.000 $4.900 $7.500 $8.000 $7.400 $7.000 $7.000 $7.000 $6.000
ELIM EXT PAV MRK & MRKS (6")
LF 36,189.000 $0.350 $0.700 $0.700 $0.600 $0.600 $0.600 $0.600 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 4,008.000 $0.700 $1.000 $0.900 $0.800 $0.800 $0.800 $0.800 $6.000
ELIM EXT PAV MRK & MRKS (12")
LF 2,002.000 $1.650 $1.700 $1.650 $1.600 $1.500 $1.500 $1.500 $8.000
ELIM EXT PAV MRK & MRKS (24")
LF 288.000 $2.750 $3.500 $3.300 $3.200 $3.000 $3.000 $3.000 $20.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 10.000 $39.000 $56.000 $60.000 $52.500 $50.000 $50.000 $50.000 $250.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $76.000 $56.000 $60.000 $52.500 $50.000 $50.000 $50.000 $250.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 6.000 $48.000 $56.000 $60.000 $52.500 $50.000 $50.000 $50.000 $250.000
PAV SURF PREP FOR MRK (6")
LF 19,835.000 $0.080 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $1.000
PAV SURF PREP FOR MRK (8")
LF 3,969.000 $0.100 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $3.000
PAV SURF PREP FOR MRK (12")
LF 1,296.000 $0.150 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $6.000
PAV SURF PREP FOR MRK (24")
LF 288.000 $0.280 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 10.000 $7.000 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $250.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $11.000 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $250.000
PAV SURF PREP FOR MRK (WORD)
EA 9.000 $9.000 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $250.000
PAV SURF PREP FOR MRK (RPM)
EA 241.000 $0.250 $0.050 $0.010 $0.010 $0.100 $0.010 $0.010 $50.000
PEDESTRIAN PUSH BUTTON POLE
EA 12.000 $2,800.000 $2,450.000 $5,000.000 $2,121.000 $3,000.000 $2,200.000 $2,200.000 $6,500.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $770.000 $1,150.000 $1,100.000 $1,060.500 $3,500.000 $1,010.000 $1,010.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 12.000 $2,770.000 $2,450.000 $2,800.000 $2,294.300 $685.000 $2,185.000 $2,185.000 $6,500.000
REMOVE LUMINAIRE POLE
EA 2.000 $372.000 $840.000 $500.000 $787.500 $1,662.500 $750.000 $750.000 $2,500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 4,995.000 $10.000 $4.000 $10.000 $5.400 $5.160 $12.650 $31.880 $5.000
SP MIXES SP-D SAC-A PG64-22
TON 4,313.000 $90.000 $130.000 $10.000 $134.400 $129.030 $129.660 $150.030 $155.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 19.000 $11,500.000 $8,000.000 $5,000.000 $16,878.800 $10,000.000 $5,500.000 $7,853.540 $16,500.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 8,291.000 $0.750 $2.500 $2.400 $2.300 $2.180 $2.180 $2.180 $2.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 5,280.000 $0.700 $2.500 $2.400 $2.300 $2.180 $2.180 $2.180 $2.000
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 279.000 $1.250 $3.000 $3.300 $3.200 $3.000 $3.000 $3.000 $2.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 3,121.000 $1.200 $3.500 $4.000 $3.700 $3.500 $3.500 $3.500 $6.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 150.000 $3.300 $6.500 $7.000 $6.300 $6.000 $6.000 $6.000 $6.000
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 4,800.000 $3.450 $2.200 $2.200 $2.100 $2.000 $2.000 $2.000 $6.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 280.000 $6.100 $13.500 $13.000 $12.600 $12.000 $12.000 $12.000 $20.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 4,800.000 $0.750 $2.500 $2.400 $2.300 $2.180 $2.180 $2.180 $2.000
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 505.000 $1.100 $4.000 $4.000 $3.700 $3.500 $3.500 $3.500 $6.000
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 343.000 $3.450 $7.000 $7.000 $6.300 $6.000 $6.000 $6.000 $6.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 3,500.000 $0.850 $2.500 $2.400 $2.300 $2.180 $2.180 $2.180 $2.000
TMA (STATIONARY)
DAY 38.000 $277.700 $490.000 $300.000 $341.300 $300.000 $500.000 $259.190 $250.000
TMA (MOBILE OPERATION)
DAY 16.000 $170.000 $1,450.000 $700.000 $624.800 $800.000 $750.000 $385.550 $550.000
WATER FILLED BARRIER (350)(TL-3)
LF 320.000 $300.000 $78.000 $200.000 $118.100 $250.000 $153.860 $67.590 $100.000
PERM CONC TRAFF BARRIER REPLACE
LF 15.000 $180.000 $22.000 $600.000 $126.000 $250.000 $250.000 $177.900 $1,000.000
Totals: $9,199,480.708 $8,283,077.100 $8,667,559.590 $9,593,154.410 $9,690,000.150 $10,227,716.030 $10,952,053.858 $14,770,177.300