HARRIS FM 1960 (1685-03-105)

Items: 68

County: HARRIS
Length: 2.7000 MILES
Highway: FM 1960
District: HOUSTON
Control Number: 1685-03-105
DBE Goal: 2.0%
Project: F 2025(275)
Guaranty: $51,000.00
Time: 81 WORKING DAYS
Engineer's Estimate: $2,565,249.09
Date: 02/06/2025 (1 year ago)
Contract Number: 2253029
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00130307
Contract Type: Federal
Project Description: BASE REPAIR, MILLING, ACP OVERLAY, PAVEMENT MARKINGS, SIGNS AND GUARDRAIL
Mail/Deliver Bids To: N/A
PHILLIP GARLIN
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$2,565,249.09
Over/Under Est: -28.44% -$729,651.76
Over/Under Est: -24.22% -$621,289.29
Amt Left: 5.9% $108,362.47
Over/Under Est: -23.24% -$596,170.15
Amt Left: 7.27% $133,481.61
Delta: -1.29% -$25,119.14
$2,201,679.83
Over/Under Est: -14.17% -$363,569.26
Amt Left: 19.94% $366,082.50
Delta: -11.81% -$232,600.89
$2,422,888.65
Over/Under Est: -5.55% -$142,360.44
Amt Left: 31.99% $587,291.32
Delta: -10.05% -$221,208.82
Over/Under Est: 2.36% $60,566.01
Amt Left: 43.05% $790,217.77
Delta: -8.38% -$202,926.45
Over/Under Est: 16.77% $430,203.43
Amt Left: 63.19% $1,159,855.19
Delta: -14.08% -$369,637.42
Subcontractor Percentage Amount
BATTERSON, LLP 5.09% $95,475.47
TRAFFIC SIGNS & LINES, LLC 4.46% $83,658.27
J & M CONTRACTING, COMPANY 2.32% $43,517.31
Total: 11.87% $222,651.05

Bid Items & Bid Tabulations

68 Total 0 of 68
HARRIS  |  FM 1960  |  HOUSTON  |  1685-03-105  |  02/06/2025  |  $2,565,249.09  |  F 2025(275)  |  SURF/ROADWAY RESTOR  |  81 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
DURWOOD GREENE CONSTRUCTION CO.
HAYDEN PAVING, INC.
RHINO EQUITY, LLC
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
FORDE CONSTRUCTION COMPANY, INC.
REMOV CONC (MOWSTRIP)
SY 30.000 $30.000 $250.000 $375.000 $30.000 $55.000 $32.000 $259.000 $275.000
BACKFILL (TY A OR B)
STA 153.000 $300.000 $260.000 $172.000 $220.000 $250.000 $200.000 $295.000 $425.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 23,318.000 $15.000 $3.850 $2.750 $3.950 $5.000 $4.000 $5.000 $4.000
AGGR (TY-PB, GR-4)(SAC-B)
CY 560.000 $200.000 $166.000 $120.000 $165.000 $195.000 $1.680 $304.000 $352.000
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
TON 110.000 $250.000 $185.000 $375.000 $350.000 $300.000 $800.000 $315.000 $625.000
TACK COAT
GAL 110.000 $4.200 $4.000 $3.150 $3.500 $15.000 $5.600 $15.000 $5.000
SP MIXES SP-D SAC-A PG76-22
TON 7,287.000 $155.000 $134.000 $145.000 $150.000 $156.000 $155.000 $181.000 $154.000
TACK COAT
GAL 4,372.000 $3.650 $3.500 $3.150 $3.500 $4.000 $3.900 $8.000 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 633.000 $100.000 $85.000 $103.000 $90.000 $65.000 $95.000 $119.000 $164.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,000.000 $120.000 $96.000 $85.000 $45.000 $105.000 $110.000 $114.000 $160.000
PLANE & TEXT ASPH CONC PAV(2")
SY 73,873.000 $2.000 $2.050 $2.000 $1.500 $1.400 $5.000 $3.000 $10.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $700.000 $1,200.000 $1,050.000 $1,100.000 $950.000 $448.000 $923.000 $900.000
MOBILIZATION
LS 1.000 $220,000.000 $50,000.000 $112,000.000 $90,000.000 $200,000.000 $15,000.000 $100,000.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $12,000.000 $4,000.000 $1,750.000 $4,000.000 $3,000.000 $2,000.000 $18,000.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 70.000 $150.000 $65.000 $180.000 $200.000 $250.000 $150.000 $111.000 $165.000
TMA (STATIONARY)
DAY 50.000 $350.000 $125.000 $250.000 $350.000 $250.000 $650.000 $348.000 $165.000
TMA (MOBILE OPERATION)
HR 48.000 $115.000 $20.000 $60.000 $60.000 $65.000 $100.000 $50.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 698.000 $21.500 $24.600 $25.000 $30.000 $28.000 $60.000 $28.200 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,200.000 $1,557.000 $2,150.000 $2,600.000 $2,000.000 $1,700.000 $2,800.000 $1,650.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,475.000 $1,750.000 $1,650.000 $1,200.000 $1,600.000 $2,300.000 $1,560.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $95.000 $69.250 $90.000 $80.000 $90.000 $100.000 $115.000 $74.000
REMOVE METAL BEAM GUARD FENCE
LF 698.000 $3.000 $3.000 $3.000 $3.500 $2.000 $2.000 $4.000 $3.150
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $200.000 $200.000 $210.000 $300.000 $235.000 $1,500.000 $170.000 $210.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $180.000 $210.000 $250.000 $265.000 $1,500.000 $270.000 $190.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,000.000 $3,089.000 $3,000.000 $3,650.000 $3,100.000 $3,500.000 $4,000.000 $3,270.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $260.000 $200.000 $265.000 $300.000 $335.000 $500.000 $338.000 $212.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 16.000 $220.000 $215.000 $365.000 $250.000 $200.000 $350.000 $277.000 $228.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $850.000 $501.000 $515.000 $600.000 $625.000 $850.000 $770.000 $530.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $850.000 $596.000 $650.000 $675.000 $775.000 $900.000 $912.000 $631.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $850.000 $740.000 $850.000 $900.000 $1,100.000 $1,200.000 $1,265.000 $784.000
REMOVE SM RD SN SUP&AM
EA 20.000 $120.000 $65.000 $105.000 $80.000 $125.000 $150.000 $150.000 $69.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 4.000 $25.000 $15.000 $37.000 $30.000 $25.000 $50.000 $27.000 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 27.000 $35.000 $25.000 $37.000 $35.000 $29.000 $50.000 $38.000 $27.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $75.000 $162.000 $90.000 $200.000 $50.000 $150.000 $95.000 $170.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 58,628.000 $0.600 $0.300 $0.300 $0.340 $0.500 $0.800 $0.400 $0.330
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 932.000 $0.500 $0.590 $0.600 $0.900 $1.150 $2.000 $0.800 $0.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 342.000 $5.000 $2.000 $2.100 $4.000 $5.100 $6.000 $3.000 $2.100
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 8.000 $100.000 $80.000 $84.500 $130.000 $150.000 $100.000 $108.000 $85.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 8.000 $100.000 $80.000 $84.500 $130.000 $150.000 $150.000 $108.000 $85.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,360.000 $0.500 $0.300 $0.300 $0.340 $0.500 $1.000 $0.400 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,968.000 $0.600 $0.300 $0.300 $0.340 $0.500 $0.800 $0.400 $0.320
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 1,544.000 $2.500 $1.500 $1.600 $2.500 $3.300 $4.000 $2.000 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 282.000 $1.200 $0.930 $1.000 $1.750 $3.300 $3.500 $2.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 58.000 $12.000 $6.000 $6.300 $10.000 $9.500 $15.000 $8.000 $6.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $210.000 $150.000 $160.000 $230.000 $300.000 $150.000 $203.000 $159.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $220.000 $200.000 $210.000 $230.000 $325.000 $250.000 $270.000 $212.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 772.000 $3.750 $3.000 $3.000 $5.000 $5.000 $8.000 $4.000 $3.200
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 200.000 $1.160 $1.000 $1.000 $7.000 $2.000 $4.500 $2.000 $1.050
RE PM TY III (W)(6")(SLD)
LF 393.000 $1.230 $2.000 $2.000 $7.000 $3.500 $5.000 $3.000 $2.100
RE PM TY III (W)(6")(BRK)
LF 100.000 $1.000 $2.000 $2.000 $7.000 $3.500 $5.500 $3.000 $2.100
RE PM TY III (W)(8")(SLD)
LF 184.000 $2.000 $3.000 $3.000 $8.000 $4.500 $8.000 $4.000 $3.150
RE PM TY III (W)(24")(SLD)
LF 113.000 $21.000 $20.000 $20.000 $18.000 $15.500 $25.000 $27.000 $21.000
RE PM TY III (Y)(6")(SLD)
LF 416.000 $1.150 $2.000 $2.000 $7.000 $4.000 $5.000 $3.000 $2.100
RE PM TY III (W)(ARROW)
EA 1.000 $210.000 $500.000 $530.000 $600.000 $500.000 $400.000 $675.000 $530.000
RE PM TY III (W)(WORD)
EA 1.000 $220.000 $500.000 $530.000 $600.000 $500.000 $500.000 $675.000 $530.000
RE PM TY III (BLK)(6")(SHADOW)
LF 100.000 $1.160 $2.000 $2.000 $8.000 $2.000 $10.000 $3.000 $2.100
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 21,571.000 $1.200 $0.920 $1.000 $0.900 $1.380 $5.000 $1.000 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 3,112.000 $1.200 $0.920 $1.000 $0.900 $1.380 $5.500 $1.500 $1.000
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 2,384.000 $1.500 $0.920 $1.000 $0.900 $1.380 $5.500 $1.500 $1.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 7,050.000 $1.000 $1.250 $1.250 $1.200 $1.000 $3.000 $2.000 $1.300
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 200.000 $1.000 $1.250 $1.250 $4.000 $1.000 $3.500 $2.000 $1.300
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 10,456.000 $1.100 $1.250 $1.250 $1.200 $1.000 $3.000 $2.000 $1.300
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 616.000 $0.900 $1.250 $1.250 $4.000 $1.000 $3.500 $2.000 $1.300
PAVEMENT SLER 24"
LF 113.000 $1.000 $2.000 $2.000 $3.500 $0.390 $2.000 $3.000 $2.100
REFL PAV MRKR TY I-C
EA 53.000 $8.000 $6.000 $6.300 $8.000 $6.600 $5.950 $8.000 $6.400
REFL PAV MRKR TY II-A-A
EA 722.000 $7.000 $6.000 $6.300 $7.500 $6.600 $6.950 $8.000 $6.400
ELIM EXT PM & MRKS (24")
LF 113.000 $3.500 $3.000 $3.000 $10.000 $4.000 $5.000 $4.000 $3.180
PAV SURF PREP FOR MRK (24")
LF 113.000 $0.800 $1.000 $1.000 $6.000 $1.100 $1.000 $1.500 $1.060
Totals: $2,565,249.090 $1,835,597.330 $1,943,959.800 $1,969,078.940 $2,201,679.830 $2,422,888.650 $2,625,815.100 $2,995,452.520