HARRIS FM 1960 (1685-01-108)

Items: 41

County: HARRIS
Length: 8.3130 MILES
Highway: FM 1960
District: HOUSTON
Control Number: 1685-01-108
DBE Goal: 0.0%
Project: CM 2026(300)
Guaranty: $38,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $1,699,693.25
Date: 02/04/2026 (4 months ago)
Contract Number: 2263023
Type: ADVANCED TRAFFIC MANAGEMENT SYSTEM
Project ID: A00123516
Contract Type: Federal
Project Description: INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE WHERE NO CURRENT SYSTEM EXISTS. THE NEW EQUIPMENT DOES NOT REPLACE OR UPGRADE EXISTING EQUIPMENT.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RANDEE SHIELDS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,699,693.25
$1,278,950.78
Over/Under Est: -24.75% -$420,742.47
$1,455,496.54
Over/Under Est: -14.37% -$244,196.71
Amt Left: 13.8% $176,545.76
Over/Under Est: -2.71% -$46,040.25
Amt Left: 29.3% $374,702.22
Delta: -13.61% -$198,156.46
$1,663,235.33
Over/Under Est: -2.14% -$36,457.92
Amt Left: 30.05% $384,284.55
Delta: -0.58% -$9,582.33

Bid Items & Bid Tabulations

41 Total 0 of 41
HARRIS  |  FM 1960  |  HOUSTON  |  1685-01-108  |  02/04/2026  |  $1,699,693.25  |  CM 2026(300)  |  ADVANCED TRAF MGT SYSTEM  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
TRAF-TEX, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
THE LEVY COMPANY, LLC
DRILL SHAFT (SIGN MTS) (54 IN)
LF 56.000 $850.010 $814.230 $800.000 $997.000 $743.410
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $649.880 $726.630 $650.000 $1,180.000 $1,647.440
MOBILIZATION
LS 1.000 $464,221.970 $127,895.070 $121,600.000 $161,600.000 $115,035.370
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,792.290 $4,026.160 $3,320.000 $11,715.000 $10,153.000
TMA (STATIONARY)
DAY 180.000 $185.650 $460.700 $250.000 $165.000 $113.420
TMA (MOBILE OPERATION)
DAY 90.000 $229.930 $456.690 $400.000 $165.000 $71.050
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $4.110 $5.790 $4.300 $2.800 $4.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.110 $2.310 $1.450 $1.150 $0.840
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 110.000 $12.250 $41.390 $30.000 $23.300 $67.040
CONDT (PVC) (SCH 80) (2")
LF 2,790.000 $12.300 $18.370 $26.100 $12.750 $14.680
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,860.000 $15.000 $18.370 $68.340 $25.200 $33.950
CONDT (PVC) (SCH 80) (3")
LF 585.000 $15.000 $20.630 $38.760 $19.700 $18.400
CONDT (PVC) (SCH 80) (3") (BORE)
LF 970.000 $22.330 $20.630 $64.100 $32.800 $40.660
CONDT (PVC) (SCH 80) (4")
LF 110.000 $24.400 $23.420 $49.450 $15.200 $29.620
CONDT (RM) (2")
LF 110.000 $27.000 $31.240 $30.400 $33.900 $59.820
CONDUIT (PREPARE)
LF 29,440.000 $2.500 $4.630 $1.150 $4.200 $2.320
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 90.000 $21.460 $45.430 $34.100 $52.000 $79.840
ITS MULTI-DUCT CND (PVC-80)
LF 240.000 $39.000 $31.660 $67.300 $41.350 $31.200
ELEC CONDR (NO.14) INSULATED
LF 2,025.000 $1.150 $1.500 $1.200 $1.450 $1.340
ELEC CONDR (NO.8) BARE
LF 895.000 $2.070 $2.040 $2.100 $1.750 $1.890
ELEC CONDR (NO.8) INSULATED
LF 1,790.000 $2.110 $2.470 $2.500 $2.200 $2.220
ELEC CONDR (NO.6) BARE
LF 415.000 $2.580 $2.590 $2.600 $2.150 $2.440
ELEC CONDR (NO.6) INSULATED
LF 1,245.000 $2.500 $2.890 $2.900 $2.500 $2.870
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 9.000 $4,312.250 $3,465.280 $4,360.000 $4,545.000 $6,146.110
GROUND BOX TY A (122311)
EA 15.000 $1,053.240 $658.490 $1,122.000 $700.000 $1,425.310
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 12.000 $7,045.000 $5,924.410 $6,590.000 $11,430.000 $9,157.620
INS OH SN SUP(25 FT CANT)
EA 2.000 $31,000.000 $46,819.980 $49,024.000 $52,300.000 $63,654.870
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $14,053.850 $8,759.100 $17,440.000 $13,865.000 $15,911.600
SYSTEM INTEGRATION
LS 1.000 $25,876.810 $1,406.180 $25,920.000 $26,065.750 $23,820.020
ITS RVSD SYSTEM (DATA COLLECTION ONLY)
EA 5.000 $10,100.000 $12,328.290 $14,033.000 $11,735.000 $15,429.080
ITS POLE MNTD CAB (TY 2)(CONF 1)
EA 10.000 $6,160.000 $7,178.190 $8,571.000 $5,345.000 $7,992.670
CCTV FIELD EQUIPMENT (DIGITAL)
EA 10.000 $8,159.570 $6,732.480 $7,655.000 $8,165.000 $6,849.920
CCTV MOUNT (MAST)
EA 10.000 $600.000 $400.540 $915.000 $440.000 $1,000.380
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 29,520.000 $1.790 $1.500 $2.250 $5.100 $4.870
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 1,580.000 $2.700 $2.030 $9.500 $8.700 $5.620
FIBER OPTIC FUSION SPLICE
EA 42.000 $49.180 $68.640 $47.620 $150.000 $67.410
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 9.000 $1,777.680 $1,511.700 $709.000 $1,210.000 $1,797.650
FIBER OPTIC PATCH PANEL (36 POSITIONS)
EA 4.000 $3,300.000 $2,267.560 $2,259.000 $2,865.000 $2,584.110
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 51,315.000 $2.920 $1.570 $2.200 $3.400 $4.490
FO CBL (12 SMF)(PIGTAIL)
LF 910.000 $72.000 $14.050 $5.000 $4.000 $10.490
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 2.000 $17,018.750 $14,114.180 $18,738.000 $14,400.000 $16,864.100
Totals: $1,699,693.250 $1,278,950.780 $1,455,496.540 $1,653,653.000 $1,663,235.330
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
STATE FORCE ACCOUNT WORK (PART) $300,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $20,000.00
MATERIAL FURNISHED BY THE STATE (PART) $268,000.00
CONTRACTOR FORCE ACCOUNT WORK (PART) $28,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $8,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $30,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,600.00
Total: $659,600.00