Show Job Controls
Bid Cobra

HARRIS FM 1960 (1685-01-107)

Items: 54

County: HARRIS
Length: N/A
Highway: FM 1960
District: HOUSTON
Control Number: 1685-01-107
DBE Goal: N/A
Project: STP 2023(752)TP
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $1,796,671.72
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT SHARED USE PATH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,796,671.72
$1,450,429.42
Over/Under Est: -19.27% -$346,242.30
$1,825,849.60
Over/Under Est: 1.62% $29,177.88
Amt Left: 25.88% $375,420.18
Over/Under Est: 4.67% $83,875.48
Amt Left: 29.65% $430,117.78
Delta: -3.00% -$54,697.60
$2,369,227.00
Over/Under Est: 31.87% $572,555.28
Amt Left: 63.35% $918,797.58
Delta: -25.99% -$488,679.80
Subcontractor Percentage Amount
CONARMET LLC 4.04% $60,393.54
HIGHWAY 1 LLC 2.18% $32,588.60
R. ORTIZ TRUCKING 0.85% $12,706.56
HOUSTON SAWING & DRILLING 0.75% $11,211.67
K4 ENVIRONMENTAL LLC 0.15% $2,242.33
Total: 7.97% $119,142.70

Bid Items & Bid Tabulations

54 Total 0 of 54
HARRIS  |  FM 1960  |  HOUSTON  |  1685-01-107  |  05/04/2023  |  $1,796,671.72  |  STP 2023(752)TP  |  CONSTRUCT SHARED USE PATH  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS WALL & LANDSCAPE
ENCINO LANDSCAPE, INC.
MAIN LANE INDUSTRIES LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 58.000 $10,606.450 $550.000 $3,500.000 $2,000.000 $11,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 12.000 $1,253.020 $1,250.000 $2,000.000 $2,000.000 $2,500.000
REMOVING CONC (MEDIANS)
SY 11.000 $21.220 $140.000 $100.000 $25.000 $50.000
REMOVING CONC (DRIVEWAYS)
SY 1,425.000 $12.280 $20.000 $40.000 $25.000 $20.000
REMOVING CONC (CTB)
LF 220.000 $18.000 $29.000 $40.000 $25.000 $50.000
REMOVING CONC (MISC)
SY 20.000 $4.700 $50.000 $40.000 $25.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 111.000 $15.300 $37.000 $40.000 $25.000 $20.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 24.000 $4.350 $41.000 $40.000 $80.000 $20.000
EXCAVATION (ROADWAY)
CY 253.000 $12.000 $29.000 $40.000 $100.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 100.000 $13.750 $310.000 $40.000 $60.000 $50.000
BLOCK SODDING
SY 3,497.000 $5.000 $6.000 $5.000 $5.000 $10.000
FERTILIZER
AC 0.730 $2,500.000 $1,640.000 $300.000 $1,500.000 $3,500.000
VEGETATIVE WATERING
MG 87.600 $25.740 $122.000 $1.000 $100.000 $500.000
CEMENT
TON 62.000 $222.780 $56.000 $250.000 $1.000 $300.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 4,223.000 $15.000 $35.000 $40.000 $28.000 $65.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 17.000 $54.410 $120.000 $50.000 $65.000 $350.000
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 2.000 $7,381.720 $15,500.000 $10,000.000 $19,000.000 $12,500.000
ADJUSTING MANHOLES
EA 2.000 $600.000 $2,523.000 $2,500.000 $2,000.000 $2,500.000
REMOV STR (INLET)
EA 2.000 $645.600 $1,300.000 $2,000.000 $1,500.000 $2,500.000
REMOVE STR (BOLLARD)
EA 4.000 $212.200 $250.000 $1,000.000 $200.000 $150.000
MOBILIZATION
LS 1.000 $156,788.340 $100,000.000 $180,000.000 $184,000.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,000.000 $5,500.000 $10,000.000 $16,000.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 240.000 $6.000 $8.000 $10.000 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $2.000 $6.000 $1.000 $5.000 $9.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 500.000 $5.700 $50.000 $100.000 $24.000 $35.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $8.900 $50.000 $100.000 $24.000 $35.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 500.000 $5.520 $41.000 $20.000 $20.000 $35.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $9.080 $41.000 $20.000 $20.000 $35.000
CONC CURB (MONO) (TY II)
LF 1,001.000 $5.030 $18.000 $30.000 $10.000 $55.000
CONC CURB (TY C1)
LF 1,469.000 $79.460 $31.000 $50.000 $150.000 $55.000
DRIVEWAYS (CONC)
SY 843.000 $100.000 $118.000 $90.000 $145.000 $85.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 579.000 $82.070 $150.000 $90.000 $150.000 $125.000
CONC SIDEWALKS (5")
SY 1,300.000 $100.000 $91.000 $90.000 $110.000 $70.000
CONC SIDEWALKS (6")
SY 3,223.000 $62.250 $90.000 $90.000 $110.000 $85.000
CURB RAMPS (TY 5)
EA 2.000 $3,146.130 $2,900.000 $2,000.000 $3,000.000 $2,850.000
REMOVE METAL BEAM GUARD FENCE
LF 114.000 $3.880 $12.000 $20.000 $30.000 $3.000
CHAIN LINK FENCE (INSTALL) (6')
LF 220.000 $35.090 $40.000 $40.000 $60.000 $95.000
CHAIN LINK FENCE (REMOVE)
LF 220.000 $24.830 $8.000 $10.000 $6.000 $20.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $4,782.220 $30,000.000 $10,000.000 $5,000.000 $15,000.000
ALUMINUM SIGNS (TY A)
SF 98.000 $6.290 $19.000 $40.000 $18.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $800.000 $800.000 $800.000 $700.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $672.360 $918.000 $800.000 $800.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $910.540 $1,102.000 $800.000 $1,000.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 16.000 $66.520 $170.000 $100.000 $150.000 $150.000
ELIM EXT PAV MRK & MRKS (12")
LF 484.000 $1.660 $2.400 $2.000 $2.200 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 118.000 $2.720 $3.750 $5.000 $3.300 $20.000
PAV SURF PREP FOR MRK (12")
LF 484.000 $0.130 $0.160 $20.000 $0.150 $6.000
PAV SURF PREP FOR MRK (24")
LF 118.000 $0.280 $0.360 $20.000 $0.300 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $11,511.390 $20,000.000 $1,000.000 $17,000.000 $16,500.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 484.000 $3.290 $11.000 $5.000 $9.500 $6.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 118.000 $6.040 $21.000 $10.000 $19.000 $6.000
TMA (STATIONARY)
DAY 187.000 $500.000 $315.000 $1,000.000 $200.000 $250.000
FIRE HYDRANT ASSEMBLY
EA 3.000 $8,225.670 $10,000.000 $9,000.000 $9,500.000 $8,500.000
REMOVING FIRE HYDRANT
EA 3.000 $1,114.140 $3,000.000 $5,000.000 $2,000.000 $2,500.000
Totals: $1,796,671.724 $1,450,429.420 $1,825,849.600 $1,880,547.200 $2,369,227.000