Show Job Controls
Bid Cobra

HARRIS FM 2100 (1062-04-063)

Items: 69

County: HARRIS
Length: 2.7440 MILES
Highway: FM 2100
District: HOUSTON
Control Number: 1062-04-063
DBE Goal: 0.0%
Project: F 2026(483)
Guaranty: $34,000.00
Time: 56 WORKING DAYS
Engineer's Estimate: $1,578,949.80
Date: 04/07/2026 (2 months ago)
Contract Number: 4263023
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00140549
Contract Type: Federal
Project Description: DIAMOND GRINDING FROM SAN JACINTO RIVER AUTHORITY CANAL TO ULRICH RD, 2-INCH OVERLAY FROM ULRICH RD TO SOUTH OF BU 90-U, AND REPLACE PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PHILLIP GARLIN
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,578,949.80
$1,798,696.38
Over/Under Est: 13.92% $219,746.58
Over/Under Est: 15.57% $245,837.30
Amt Left: 1.45% $26,090.72
Over/Under Est: 20.96% $330,925.10
Amt Left: 6.18% $111,178.52
Delta: -4.66% -$85,087.80
Over/Under Est: 23.41% $369,609.49
Amt Left: 8.33% $149,862.91
Delta: -2.03% -$38,684.39

Bid Items & Bid Tabulations

69 Total 0 of 69
HARRIS  |  FM 2100  |  HOUSTON  |  1062-04-063  |  04/07/2026  |  $1,578,949.80  |  F 2026(483)  |  REHAB EXIST ROADWAY  |  56 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FORDE CONSTRUCTION COMPANY, INC.
TEXAS MATERIALS GROUP, INC.
ENVIRONMENTAL ALLIES, INC.
DURWOOD GREENE CONSTRUCTION CO.
REMOV CONC (MOWSTRIP)
SY 26.000 $32.000 $160.000 $188.000 $40.000 $150.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 16,328.000 $4.000 $3.200 $4.000 $4.250 $4.250
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 349.000 $155.000 $250.000 $313.000 $290.000 $290.000
SP MIXES SP-D SAC-A PG76-22
TON 3,742.000 $135.000 $153.000 $169.000 $168.000 $183.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,766.000 $120.000 $110.000 $132.000 $135.000 $110.000
PLANE ASPH CONC PAV (1.5")
SY 45,357.000 $1.200 $3.750 $3.000 $2.500 $4.000
FULL - DEPTH REPAIR CRCP (10")
CY 17.000 $800.000 $1,250.000 $1,635.000 $1,500.000 $850.000
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $650.000 $900.000 $1,050.000 $900.000 $1,100.000
MOBILIZATION
LS 1.000 $140,000.000 $122,000.000 $115,000.000 $102,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,000.000 $22,000.000 $7,450.000 $8,000.000 $4,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $150.000 $250.000 $50.000 $150.000 $300.000
TMA (STATIONARY)
DAY 43.000 $250.000 $200.000 $450.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 9.000 $200.000 $200.000 $650.000 $450.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $28.000 $32.000 $29.000 $30.000 $23.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,300.000 $1,995.000 $2,500.000 $1,965.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,300.000 $2,185.000 $1,600.000 $1,450.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $70.000 $117.000 $265.000 $95.000 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $3.300 $4.500 $4.400 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $245.000 $550.000 $440.000 $350.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $325.000 $290.000 $550.000 $245.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $3,800.000 $2,350.000 $3,500.000 $3,085.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $368.000 $275.000 $300.000 $250.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 330.000 $18.000 $27.000 $20.000 $21.000 $19.000
CONDUIT (PREPARE)
LF 35.000 $1.700 $1.100 $5.000 $12.000 $1.000
ELEC CONDR (NO.8) BARE
LF 330.000 $1.800 $1.600 $1.750 $2.500 $2.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 6.000 $20.000 $26.000 $56.500 $30.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $25.000 $33.000 $56.500 $35.000 $32.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 11,940.000 $0.350 $0.300 $0.350 $0.650 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 121.000 $0.900 $0.270 $0.300 $1.000 $0.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 22,760.000 $0.300 $0.300 $0.350 $0.650 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,260.000 $0.700 $0.500 $0.550 $1.250 $0.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 24.000 $95.000 $79.000 $85.000 $175.000 $75.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 6.000 $110.000 $90.000 $95.000 $220.000 $85.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 28.000 $90.000 $79.000 $85.000 $165.000 $75.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,380.000 $0.300 $0.300 $0.350 $0.650 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 27,350.000 $0.300 $0.300 $0.350 $0.650 $0.300
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 180.000 $1.500 $0.950 $1.000 $4.500 $1.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 714.000 $4.000 $4.500 $5.000 $6.600 $4.250
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 8,906.000 $3.500 $4.500 $4.750 $6.600 $4.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,526.000 $1.150 $2.100 $0.550 $2.000 $1.900
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,544.000 $0.550 $2.100 $0.550 $2.000 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,130.000 $1.500 $1.050 $1.000 $1.500 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,867.000 $8.000 $6.300 $7.000 $8.800 $6.200
RE PM TY III (W)(6")(SLD)
LF 213.000 $0.700 $1.700 $1.800 $3.500 $1.600
RE PM TY III (W)(6")(BRK)
LF 3,110.000 $0.900 $1.000 $1.000 $2.250 $0.950
RE PM TY III (W)(12")(SLD)
LF 16.000 $3.000 $6.300 $7.000 $10.000 $6.000
RE PM TY III (W)(24")(SLD)
LF 348.000 $8.000 $15.500 $17.000 $17.500 $15.000
RE PM TY III (Y)(6")(SLD)
LF 1,256.000 $1.500 $1.000 $1.000 $2.250 $0.950
RE PM TY III (Y)(6")(BRK)
LF 310.000 $0.900 $1.700 $1.800 $4.500 $1.600
RE PM TY III (Y)(12")(SLD)
LF 198.000 $4.000 $6.400 $6.750 $10.000 $6.000
RE PM TY III (BLK)(6")(SHADOW)
LF 3,110.000 $0.800 $1.050 $1.150 $2.250 $1.020
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 11,256.000 $0.900 $0.880 $0.950 $1.150 $0.820
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 2,860.000 $0.800 $0.950 $1.000 $1.150 $0.900
ALL-WTHER PM TY I (W)6"(DOT)(100MIL)
LF 60.000 $5.000 $0.950 $1.000 $1.150 $0.900
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 11,136.000 $0.900 $0.880 $0.950 $1.150 $0.820
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 1,710.000 $0.900 $0.950 $1.000 $1.150 $0.900
PREFAB PM TY C (W)(ARROW)
EA 18.000 $200.000 $264.000 $280.000 $300.000 $250.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 1.000 $500.000 $529.000 $565.000 $550.000 $500.000
PREFAB PM TY C (W)(NUMBER)
EA 2.000 $200.000 $132.000 $141.000 $260.000 $125.000
PREFAB PM TY C (W)(WORD)
EA 18.000 $275.000 $265.000 $280.000 $315.000 $250.000
REFL PAV MRKR TY I-C
EA 361.000 $5.000 $6.300 $6.750 $7.750 $6.000
REFL PAV MRKR TY II-A-A
EA 453.000 $5.000 $6.300 $6.750 $7.750 $6.000
INS TRF SIG PL AM (S)LUM ARM(10')
EA 4.000 $200.000 $1,700.000 $2,400.000 $2,250.000 $1,995.000
CONTINUOUS GRINDING-CONCRETE PAVEMENT
SY 19,250.000 $12.000 $8.500 $6.400 $9.000 $13.570
VIVDS PROSR SYS
EA 3.000 $5,000.000 $12,200.000 $14,000.000 $4,025.000 $12,750.000
VIVDS CAM ASSY FXD LNS
EA 12.000 $4,000.000 $2,290.000 $2,665.000 $6,250.000 $2,750.000
VIVDS CNTRL SOFTWARE
EA 1.000 $650.000 $1,720.000 $750.000 $775.000 $900.000
VIVDS CABLING
LF 2,220.000 $2.600 $3.800 $2.350 $3.500 $2.000
GROUND BOX (PREPARE)
EA 6.000 $400.000 $246.000 $360.000 $400.000 $600.000
Totals: $1,578,949.800 $1,798,696.380 $1,824,787.100 $1,909,874.900 $1,948,559.290
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $8,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
Total: $13,000.00