Show Job Controls
Bid Cobra

HARRIS FM 865 (0976-01-040)

Items: 37

County: HARRIS
Length: N/A
Highway: FM 865
District: HOUSTON
Control Number: 0976-01-040
DBE Goal: N/A
Project: STP 1902(324)HES
Guaranty: N/A
Time: 40 WORKING DAYS
Engineer's Estimate: $148,344.64
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: ADD LEFT TURN LANE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$148,344.64
$189,822.20
Over/Under Est: 27.96% $41,477.56
Over/Under Est: 53.47% $79,317.36
Amt Left: 19.93% $37,839.80

Bid Items & Bid Tabulations

37 Total 0 of 37
HARRIS  |  FM 865  |  HOUSTON  |  0976-01-040  |  08/07/2019  |  $148,344.64  |  STP 1902(324)HES  |  ADD LEFT TURN LANE  |  40 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 5.000 $1,000.000 $750.000 $2,000.000
REMOVING CONC (MEDIANS)
SY 7.000 $30.000 $50.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 91.000 $40.000 $50.000 $30.000
REMOVING CONC (CURB)
LF 430.000 $10.000 $5.000 $30.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 38.000 $25.000 $20.000 $30.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 93.000 $20.000 $20.000 $30.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 104.000 $15.000 $20.000 $30.000
EXCAVATION (ROADWAY)
CY 60.000 $75.000 $100.000 $30.000
LIME TRT (EXST MATL) (6")
SY 267.000 $10.000 $8.000 $10.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 4.500 $300.000 $200.000 $250.000
CM TRT(PT MX)(CL N)(TYA)(GR1-2)(FN POS)
CY 100.000 $150.000 $250.000 $100.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 95.000 $20.000 $5.000 $10.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 2.500 $500.000 $200.000 $1,000.000
D-GR HMA(SQ) TY-D SAC-A PG76-22
TON 20.000 $400.000 $500.000 $200.000
D-GR HMA(SQ) TY-D PG76-22
TON 20.000 $300.000 $500.000 $200.000
MOBILIZATION
LS 1.000 $9,122.240 $19,000.000 $25,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $8,000.000 $15,000.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 49.000 $30.000 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 49.000 $10.000 $2.000 $9.000
DRIVEWAYS (CONC)
SY 91.000 $81.000 $300.000 $125.000
CONC SIDEWALKS (4")
SY 32.000 $75.000 $250.000 $60.000
CURB RAMPS (TY 7)
EA 2.000 $2,500.000 $4,000.000 $2,500.000
CONC MEDIAN
LF 261.000 $50.000 $75.000 $125.000
REMOVE SM RD SN SUP&AM
EA 1.000 $400.000 $200.000 $650.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 108.000 $2.200 $3.000 $6.000
REFL PAV MRK TY II (W) 8" (SLD)
LF 108.000 $1.000 $1.000 $6.000
REFL PAV MRK TY II (Y) 24" (SLD)
LF 261.000 $3.000 $3.000 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $500.000 $255.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $500.000 $295.000 $350.000
REFL PAV MRKR TY I-C
EA 6.000 $9.000 $25.000 $15.000
PAV SURF PREP FOR MRK (8")
LF 108.000 $0.850 $0.500 $6.000
PAV SURF PREP FOR MRK (24")
LF 259.000 $2.000 $0.800 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $25.000 $30.000 $350.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $28.000 $30.000 $350.000
PAV SURF PREP FOR MRK (RPM)
EA 6.000 $1.000 $2.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $50.000 $150.000
TMA (STATIONARY)
DAY 80.000 $300.000 $5.000 $550.000
Totals: $148,344.640 $189,822.200 $227,662.000