Bid Cobra

HARRIS BROADWAY ST (0912-72-846)

Items: 95

County: HARRIS
Length: 0.0000 MILES
Highway: BROADWAY ST
District: HOUSTON
Control Number: 0912-72-846
DBE Goal: 0.0%
Project: C 912-72-846
Guaranty: $100,000.00
Time: 101 WORKING DAYS
Engineer's Estimate: $6,616,380.25
Date: 06/02/2026 (8 days ago)
Contract Number: 6263010
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00216194
Project Description: DESIGN AND CONSTRUCTION OF A PEDESTRIAN BRIDGE TO MILBY HIGH SCHOOL AT THE INTERSECTION OF UPRR, BROADWAY STREET, GALVESTON ROAD, AND HARDING STREET
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMAL ELAHI
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$6,616,380.25
$4,349,108.00
Over/Under Est: -34.27% -$2,267,272.25
$5,490,389.25
Over/Under Est: -17.02% -$1,125,991.00
Amt Left: 26.24% $1,141,281.25
Over/Under Est: -9.35% -$618,653.12
Amt Left: 37.91% $1,648,619.13
Delta: -9.24% -$507,337.88
Over/Under Est: -8% -$529,364.84
Amt Left: 39.96% $1,737,907.41
Delta: -1.49% -$89,288.28
Over/Under Est: 3.65% $241,358.00
Amt Left: 57.68% $2,508,630.25
Delta: -12.66% -$770,722.84
$6,965,405.31
Over/Under Est: 5.28% $349,025.06
Amt Left: 60.16% $2,616,297.31
Delta: -1.57% -$107,667.06
$7,404,456.50
Over/Under Est: 11.91% $788,076.25
Amt Left: 70.25% $3,055,348.50
Delta: -6.30% -$439,051.19

Bid Items & Bid Tabulations

95 Total 0 of 95
HARRIS  |  BROADWAY ST  |  HOUSTON  |  0912-72-846  |  06/02/2026  |  $6,616,380.25  |  C 912-72-846  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  101 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JFO SERVICES, LLC
MC2 CIVIL, LLC
JAMES CONSTRUCTION GROUP, LLC
RAGLE CONSTRUCTION, INC.
HARPER BROTHERS CONSTRUCTION LLC
ISI CONTRACTING, INC.
CASTILLO ARANDA LLC
PREPARING ROW
AC 2.410 $260,000.000 $17,875.700 $135,000.000 $10,871.390 $241,770.000 $70,000.000 $30,000.000 $300,000.000
TREE PROTECTION (INSTALL)
EA 5.000 $300.000 $1,134.530 $1,500.000 $1,000.000 $625.000 $300.000 $1,175.000 $550.000
TREE PROTECTION (REMOVE)
EA 5.000 $120.000 $283.630 $500.000 $250.000 $185.000 $100.000 $294.000 $100.000
REMOV CONC (PAV)
SY 811.000 $12.000 $34.690 $8.000 $5.100 $9.000 $15.000 $16.000 $20.000
REMOV CONC (MEDIANS)
SY 22.000 $18.000 $116.270 $20.000 $23.570 $45.000 $24.000 $124.000 $22.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 14.000 $22.000 $182.710 $50.000 $47.150 $40.000 $44.000 $174.000 $25.000
REMOV CONC (CURB)
LF 266.000 $20.000 $10.890 $10.000 $3.540 $9.000 $6.000 $10.000 $2.000
REMOV CONC (MISC)
EA 18.000 $350.000 $265.730 $10.000 $64.920 $85.000 $188.000 $1,000.000 $550.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,303.000 $15.000 $10.190 $2.000 $6.450 $4.000 $6.000 $13.000 $20.000
EXCAV (ROADWAY)
CY 1,132.000 $7.000 $32.740 $35.000 $17.920 $40.000 $41.000 $25.240 $12.000
EMBANK (FNL)(OC)(TY C)
CY 87.000 $60.000 $132.950 $60.000 $55.940 $30.000 $58.000 $59.810 $25.000
BLOCK SODDING
SY 2,203.000 $7.000 $5.110 $6.000 $4.500 $7.000 $5.750 $5.290 $6.500
VEGETATIVE WATERING
TGL 111.000 $5.000 $57.660 $32.000 $40.000 $40.000 $75.000 $47.000 $50.000
LIME (COM OR QK)(SLURRY)
TON 23.000 $240.000 $367.590 $325.000 $376.110 $324.000 $350.000 $336.000 $355.000
LIME TRT (SUBGRADE) (8")
SY 1,254.000 $3.000 $24.580 $10.000 $5.810 $8.000 $13.000 $17.000 $6.000
CONC PVMT (CPCD) (6")
SY 17.000 $95.000 $363.890 $325.000 $106.900 $150.000 $398.000 $306.000 $90.000
CONC PVMT (CPCD) (7")
SY 1,165.000 $170.000 $139.640 $75.000 $125.000 $75.000 $110.000 $140.000 $70.000
CEM STABIL BKFL
CY 85.000 $148.000 $42.320 $70.000 $62.500 $60.000 $90.000 $138.000 $100.000
DRILL SHAFT (36 IN)
LF 1,524.000 $500.000 $222.450 $285.000 $190.890 $195.000 $300.000 $414.000 $330.000
DRILL SHAFT (48 IN)
LF 968.000 $363.000 $385.360 $500.000 $345.120 $350.000 $549.000 $655.000 $470.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 36.000 $330.000 $283.630 $260.000 $250.000 $250.000 $282.000 $262.000 $300.000
CL A CONC (SEAL)
CY 22.600 $1,077.000 $750.270 $1,000.000 $852.680 $740.000 $1,400.000 $2,400.000 $450.000
CL A CONC (MISC)
CY 1.000 $1,000.000 $1,871.970 $1,200.000 $2,500.000 $10,000.000 $720.000 $3,740.000 $850.000
CL C CONC (CAP)
CY 149.600 $2,400.000 $1,268.470 $2,000.000 $2,500.000 $3,500.000 $3,500.000 $3,250.000 $1,200.000
CL C CONC (COLUMN)
CY 330.800 $1,759.000 $1,059.490 $2,000.000 $1,873.000 $1,060.000 $3,500.000 $1,719.000 $1,100.000
CL C CONC (FOOTING)
CY 160.400 $2,989.000 $713.570 $1,200.000 $1,200.000 $765.000 $1,500.000 $1,250.000 $1,550.000
SLAB SPAN
CY 151.800 $920.000 $1,107.280 $1,800.000 $1,190.000 $2,210.000 $3,500.000 $2,000.000 $750.000
RIPRAP (CONC)(4 IN)
CY 121.000 $780.000 $455.420 $800.000 $514.660 $500.000 $450.000 $325.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $695.000 $629.220 $1,000.000 $673.370 $550.000 $700.000 $645.000 $550.000
STR STEEL (MISC NON-BRIDGE)
LB 10,543.000 $15.000 $0.800 $1.000 $3.100 $3.000 $3.000 $5.000 $33.000
RAIL (HANDRAIL)(TY F)
LF 1,978.000 $170.000 $126.810 $150.000 $142.660 $140.000 $180.000 $163.000 $205.000
RC PIPE (CL III)(18 IN)
LF 103.000 $79.000 $114.050 $115.000 $106.380 $85.000 $250.000 $169.000 $165.000
RC PIPE (CL III)(24 IN)
LF 35.000 $100.000 $154.490 $160.000 $143.110 $115.000 $220.000 $321.000 $170.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $5,500.000 $5,632.770 $3,500.000 $4,565.080 $5,400.000 $5,500.000 $3,745.000 $2,500.000
INLET (COMPL)(TY AZ)(HOU)
EA 2.000 $6,500.000 $6,767.320 $5,000.000 $5,971.820 $7,000.000 $6,900.000 $5,251.000 $3,200.000
MANH (COMPL)(TY A)(HOU)
EA 2.000 $5,950.000 $8,724.380 $6,500.000 $7,196.000 $6,500.000 $7,700.000 $7,560.000 $4,000.000
PIPE (MISC) (6 IN)
LF 652.000 $120.000 $27.620 $30.000 $58.810 $59.000 $44.000 $87.000 $40.000
REMOV STR (INLET)
EA 1.000 $800.000 $2,391.560 $1,200.000 $1,598.340 $600.000 $1,100.000 $906.000 $500.000
REMOV STR (BUILDING)
EA 1.000 $75,000.000 $85,089.610 $80,000.000 $13,801.220 $45,000.000 $12,000.000 $250,000.000 $625,000.000
MOBILIZATION
LS 1.000 $600,000.000 $430,074.430 $540,000.000 $598,000.000 $600,000.000 $490,000.000 $600,000.000 $705,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $12,000.000 $1,429.510 $15,000.000 $35,000.000 $95,000.000 $15,000.000 $18,000.000 $30,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,080.000 $5,218.830 $10,000.000 $5,630.350 $5,000.000 $2,200.000 $5,550.000 $15,000.000
TMA (STATIONARY)
DAY 101.000 $200.000 $224.660 $250.000 $162.110 $300.000 $192.000 $472.000 $450.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $35.000 $51.060 $40.000 $45.000 $45.000 $20.000 $53.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $20.000 $22.690 $10.000 $20.000 $20.000 $20.000 $23.500 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $20.000 $51.060 $35.000 $45.000 $45.000 $28.000 $52.880 $21.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $8.000 $22.690 $5.000 $20.000 $20.000 $10.000 $23.500 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,084.000 $10.000 $5.110 $3.000 $4.500 $4.500 $2.000 $5.290 $4.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 10.000 $8.000 $17.020 $50.000 $15.000 $15.000 $5.000 $17.630 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,094.000 $8.000 $1.130 $0.250 $1.000 $1.000 $1.000 $1.180 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 705.000 $3.000 $9.080 $10.000 $8.000 $8.000 $6.000 $9.400 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 705.000 $3.000 $2.270 $0.250 $2.000 $2.000 $2.000 $2.350 $1.000
CONSTRUCTING DETOURS
SY 33.000 $88.000 $120.330 $250.000 $216.160 $165.000 $85.000 $465.000 $35.000
CONC CURB (TY II)
LF 482.000 $37.000 $16.380 $7.000 $30.130 $13.000 $17.000 $13.000 $7.000
CONC CURB & GUTTER (TY I)
LF 219.000 $40.000 $24.210 $21.000 $34.420 $32.000 $19.000 $24.000 $10.000
CONC CURB & GUTTER (TY II)
LF 121.000 $30.000 $37.620 $32.000 $36.020 $32.000 $34.000 $44.000 $15.000
CONC CURB (DOWELED)
LF 429.000 $35.000 $17.110 $19.000 $33.070 $18.000 $20.000 $28.000 $7.000
CONC SIDEWALKS (4")
SY 154.000 $70.000 $59.150 $90.000 $76.490 $60.000 $110.000 $126.000 $85.000
CURB RAMPS (TY 7)
SY 18.000 $383.000 $164.700 $300.000 $399.770 $210.000 $250.000 $4,000.000 $135.000
CONC MEDIAN
SY 39.000 $160.000 $72.700 $95.000 $172.050 $80.000 $110.000 $233.000 $85.000
RIGHT OF WAY MARKERS
EA 3.000 $413.000 $1,134.530 $25.000 $1,400.000 $550.000 $900.000 $470.000 $150.000
CHAIN LINK FENCE (INSTALL) (6')
LF 1,706.000 $40.000 $43.110 $50.000 $38.000 $48.000 $6.830 $24.000 $40.000
CHAIN LINK FENCE (INSTALL) (8')
LF 174.000 $1.000 $55.590 $70.000 $49.000 $49.000 $17.000 $33.000 $45.000
CHAIN LINK FENCE (REMOVE)
LF 2,091.000 $7.000 $12.480 $1.000 $11.000 $11.000 $5.000 $3.530 $5.000
REMOVE RD IL ASM (SHOE-BASE)
EA 3.000 $918.000 $567.260 $500.000 $500.000 $898.570 $899.600 $737.000 $1,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $2,000.000 $1,304.710 $1,200.000 $1,150.000 $1,150.000 $2,068.000 $1,438.000 $2,500.000
IN RD IL (TY SA) 20B-4 (150W EQ) LED
EA 2.000 $5,000.000 $5,105.380 $4,500.000 $4,500.000 $4,500.000 $7,119.290 $6,396.000 $8,100.000
CONDT (PVC) (SCH 40) (2")
LF 835.000 $6.000 $13.610 $12.000 $12.000 $12.000 $15.000 $18.570 $16.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 40.000 $25.000 $28.360 $25.000 $25.000 $25.000 $24.000 $29.030 $25.000
CONDT (RM) (1")
LF 1,430.000 $18.000 $36.310 $32.000 $32.000 $32.000 $22.000 $29.550 $25.000
ELEC CONDR (NO.8) BARE
LF 2,305.000 $1.750 $2.500 $2.200 $2.200 $2.200 $2.500 $2.090 $3.000
ELEC CONDR (NO.8) INSULATED
LF 7,740.000 $2.000 $2.840 $2.500 $2.500 $2.500 $2.660 $2.140 $3.000
GROUND BOX TY A (122311)W/APRON
EA 6.000 $1,500.000 $1,361.430 $1,200.000 $1,200.000 $1,200.000 $1,045.000 $1,355.000 $1,500.000
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
EA 1.000 $11,500.000 $8,055.150 $8,000.000 $7,100.000 $7,100.000 $10,900.000 $9,712.000 $11,500.000
ALUMINUM SIGNS (TY A)
SF 8.000 $46.000 $100.840 $35.000 $35.000 $35.000 $152.920 $36.610 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $1,000.000 $849.190 $1,100.000 $1,023.000 $1,023.000 $978.690 $1,070.000 $450.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $650.000 $730.100 $800.000 $780.000 $780.000 $1,200.000 $815.850 $350.000
REMOVE SM RD SN SUP&AM
EA 2.000 $103.000 $147.490 $120.000 $120.000 $120.000 $1,200.000 $125.510 $200.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 3.000 $50.000 $25.520 $27.000 $27.000 $35.000 $1,300.000 $28.240 $150.000
INSTL OM LG RD SIGN (3-OM-PW)Y
EA 1.000 $50.000 $25.530 $30.000 $250.000 $35.000 $2,200.000 $261.490 $150.000
RE PM TY II (W) 4" (SLD)
LF 608.000 $0.800 $4.470 $2.000 $2.000 $3.500 $9.500 $2.090 $8.000
ELIM EXT PM & MRKS (4")
LF 37.000 $3.300 $128.780 $5.000 $5.000 $2.500 $10.000 $5.230 $15.000
REMOVE LUMINAIRE POLE
EA 1.000 $1,000.000 $567.260 $500.000 $1,000.000 $750.000 $2,375.000 $1,543.000 $400.000
CLEANING / SWEEPING (HANDWORK)
SY 555.000 $8.000 $2.490 $8.300 $2.900 $1.500 $50.000 $0.830 $5.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $122.000 $1,701.790 $1,400.000 $746.460 $1,200.000 $2,100.000 $4,070.000 $800.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $249.000 $1,701.790 $2,600.000 $1,244.510 $3,000.000 $2,800.000 $2,043.000 $1,200.000
INSTALL PREF PED STEEL TRUSS BRG SPAN
LF 224.000 $2,747.000 $2,093.480 $625.000 $1,000.000 $2,125.000 $700.000 $2,250.000 $500.000
PED SHADE CANOPY
LF 9,134.000 $22.000 $9.310 $45.000 $116.960 $31.000 $85.000 $52.000 $30.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $560.000 $2,269.060 $500.000 $1,000.000 $250.000 $2,000.000 $588.000 $2,500.000
PRECAST PREST CONC HOLLOW-CORE SLAB
SF 8,604.000 $22.000 $40.590 $32.000 $39.870 $70.000 $42.000 $40.000 $85.000
STEEL FENCE (REMOVE)
LF 20.000 $100.000 $36.280 $10.000 $20.000 $20.000 $40.000 $3.530 $10.000
STEEL FENCE (INSTALL)
LF 20.000 $100.000 $142.470 $20.000 $150.000 $120.000 $180.000 $47.000 $65.000
PVC COATED NON-SCALABLE FENCE PANELS
SF 17,186.000 $5.000 $8.510 $11.000 $25.900 $2.000 $10.000 $23.000 $40.000
BRIDGE MOUNTED ILLUMINATION
EA 29.000 $2,300.000 $1,230.970 $1,100.000 $1,085.000 $1,085.000 $1,178.000 $1,400.000 $2,000.000
PARKING LOT ILLUMINATION
EA 4.000 $5,750.000 $3,573.770 $3,200.000 $3,150.000 $3,150.000 $5,036.000 $4,113.000 $6,500.000
Totals: $6,616,380.250 $4,349,108.005 $5,490,389.250 $5,997,727.128 $6,087,015.410 $6,857,738.250 $6,965,405.310 $7,404,456.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $90,000.00
CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $7,500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
Total: $132,500.00