HARRIS CS (0912-72-642)

Items: 121

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-642
DBE Goal: N/A
Project: STP 2B23(158)HESG
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $795,644.19
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$795,644.19
$1,234,892.41
Over/Under Est: 55.21% $439,248.22
Subcontractor Percentage Amount
TRAFFIC SYSTEMS CONSTRUCTION, INC. 31.73% $431,690.08
CASTEC CONSTRUCTION LLC 10.85% $147,615.42
SAFETEX,INC. 5.23% $71,154.72
CHERRY MOVING COMPANY, INC. 1.94% $26,393.91
ROYAL TRAFFIC SIGN COMPANY 0.28% $3,809.43
AGGREGATE TECHNOLOGIES, INC. 0.25% $3,401.28
Total: 50.28% $684,064.84

Bid Items & Bid Tabulations

121 Total 0 of 121
HARRIS  |  CS  |  HOUSTON  |  0912-72-642  |  08/02/2023  |  $795,644.19  |  STP 2B23(158)HESG  |  HAZARD ELIM & SAFETY  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
PREPARING ROW
AC 4.000 $4,744.520 $25,000.000
REMOVING CONC (PAV)
SY 17.000 $8.220 $100.000
REMOVING CONC (MEDIANS)
SY 522.000 $18.880 $6.000
REMOVING CONC (SIDEWALKS)
SY 59.000 $15.300 $50.000
REMOVING CONC (CURB)
LF 765.000 $4.460 $20.000
REMOVING CONC (MISC)
SY 90.000 $8.620 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 400.000 $7.900 $20.000
EXCAVATION (ROADWAY)
CY 10.000 $13.520 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 50.000 $15.980 $130.000
BACKFILL TY A
CY 5.000 $56.830 $200.000
BLOCK SODDING
SY 1.000 $4.010 $100.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 522.000 $102.790 $160.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 60.000 $402.840 $270.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $396.650 $475.000
RETAINING WALL (CAST - IN - PLACE)
SF 10.000 $72.620 $50.000
RC PIPE (CL III)(24 IN)
LF 19.000 $92.440 $400.000
RC PIPE (CL III)(30 IN)
LF 21.000 $120.500 $430.000
RC PIPE (CL III)(42 IN)
LF 24.000 $244.390 $650.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $10,434.530 $12,000.000
ADJUSTING MANHOLES
EA 2.000 $1,342.640 $1,000.000
MOBILIZATION
LS 1.000 $60,000.000 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $12,000.000
SANDBAGS FOR EROSION CONTROL
EA 8.000 $10.200 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 153.000 $3.430 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 153.000 $0.860 $2.000
COLORED TEXTURED CONC (6")
SY 25.000 $109.480 $100.000
CONC CURB (MONO) (TY I)
LF 185.000 $13.670 $30.000
CONC CURB & GUTTER (TY II)
LF 1,339.000 $28.980 $40.000
CONC CURB (DOWEL)
LF 105.000 $10.530 $30.000
CONC CURB (SLOTTED)
LF 242.000 $19.800 $20.000
CONC CURB & GUTTER (TY B) (MOUNTABLE)
LF 75.000 $40.000 $60.000
CONC SIDEWALKS (4")
SY 90.000 $58.820 $90.000
CONC SIDEWALKS (6")
SY 415.000 $70.490 $110.000
CURB RAMPS
SY 55.000 $262.160 $300.000
CONC DIRECTIONAL ISLAND
SY 55.000 $86.120 $210.000
CONCRETE MEDIAN (NOSE)
SY 153.000 $141.710 $160.000
CONDT (PVC) (SCH 80) (1")
LF 45.000 $12.440 $16.500
CONDT (PVC) (SCH 80) (2")
LF 220.000 $12.170 $28.000
CONDT (PVC) (SCH 80) (4")
LF 160.000 $26.340 $44.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 220.000 $37.820 $48.000
CONDT (RM) (1 1/4")
LF 375.000 $75.980 $22.000
ELEC CONDR (NO.6) BARE
LF 1,190.000 $1.980 $2.250
ELEC CONDR (NO.4) INSULATED
LF 390.000 $3.300 $3.250
TRAY CABLE (3 CONDR) (14 AWG)
LF 750.000 $2.000 $3.300
GROUND BOX TY A (122311)W/APRON
EA 6.000 $1,380.180 $1,100.000
GROUND BOX TY D (162922)W/APRON
EA 12.000 $1,368.330 $1,300.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $763.470 $500.000
ELC SRV TY D 120/240 060(NS)SS(E)TS(O)
EA 2.000 $6,500.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 73.000 $33.090 $90.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $709.050 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $867.080 $780.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $506.630 $450.000
REMOVE SM RD SN SUP&AM
EA 6.000 $122.920 $90.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000 $88.850 $30.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 982.000 $3.570 $4.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 465.000 $7.110 $12.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $179.440 $210.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $183.290 $210.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 8.000 $319.230 $250.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,746.000 $4.460 $3.750
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $239.960 $200.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,486.000 $0.230 $0.750
REFL PAV MRK TY II (W) 12" (SLD)
LF 512.000 $1.580 $5.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 330.000 $3.530 $7.500
REFL PAV MRK TY II (W) (ARROW)
EA 2.000 $71.770 $150.000
REFL PAV MRK TY II (W) (SYMBOL)
EA 8.000 $446.250 $150.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 1,656.000 $0.170 $1.100
REFL PAV MRK TY II (Y) 4" (SLD)
LF 460.000 $0.190 $1.100
REFL PAV MRK TY II (Y) 12" (SLD)
LF 132.000 $1.770 $5.000
REFL PAV MRK TY II (Y) 24" (SLD)
LF 240.000 $2.940 $7.500
PAVEMENT SEALER 4"
LF 4,036.000 $0.200 $0.200
PAVEMENT SEALER 12"
LF 512.000 $1.010 $0.250
PAVEMENT SEALER 18"
LF 90.000 $2.500 $0.250
PAVEMENT SEALER 24"
LF 240.000 $0.810 $0.300
PAVEMENT SEALER (ARROW)
EA 1.000 $18.120 $14.000
PAVEMENT SEALER (SYMBOL)
EA 8.000 $90.250 $14.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,726.000 $0.600 $1.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 352.000 $0.630 $1.300
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 422.000 $0.610 $1.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 550.000 $0.410 $1.200
REFL PAV MRKR TY II-A-A
EA 33.000 $3.850 $6.000
REFL PAV MRKR TY II-C-R
EA 56.000 $4.280 $6.000
TRAFFIC BUTTON TY I-C
EA 60.000 $9.180 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 8,370.000 $0.480 $0.300
ELIM EXT PAV MRK & MRKS (6")
LF 57.000 $0.480 $0.350
ELIM EXT PAV MRK & MRKS (8")
LF 56.000 $0.830 $0.400
ELIM EXT PAV MRK & MRKS (12")
LF 216.000 $1.610 $0.450
ELIM EXT PAV MRK & MRKS (24")
LF 240.000 $3.420 $0.550
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $50.180 $70.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $54.380 $70.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 8.000 $165.630 $70.000
PAV SURF PREP FOR MRK (4")
LF 4,186.000 $0.080 $0.120
PAV SURF PREP FOR MRK (6")
LF 774.000 $0.100 $0.120
PAV SURF PREP FOR MRK (12")
LF 2,418.000 $0.370 $0.120
PAV SURF PREP FOR MRK (24")
LF 465.000 $0.720 $0.120
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $17.540 $2.500
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $22.380 $2.500
PAV SURF PREP FOR MRK (SYMBOL)
EA 8.000 $13.320 $2.500
PAV SURF PREP FOR MRK (RPM)
EA 89.000 $0.350 $0.500
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $29,408.450 $68,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,096.760 $2,700.000
VEH SIG SEC (12")LED(GRN)
EA 9.000 $298.590 $325.000
VEH SIG SEC (12")LED(YEL)
EA 15.000 $315.110 $325.000
VEH SIG SEC (12")LED(RED)
EA 21.000 $310.160 $325.000
PED SIG SEC (LED)(COUNTDOWN)
EA 10.000 $751.400 $900.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 15.000 $196.680 $160.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 730.000 $1.960 $2.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 770.000 $3.060 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,120.000 $3.560 $3.300
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 3.000 $15,450.830 $17,500.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $17,377.040 $19,750.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $38,552.870 $37,500.000
PED POLE ASSEMBLY
EA 8.000 $2,791.370 $3,100.000
PEDESTRIAN PUSH BUTTON POLE
EA 8.000 $2,980.500 $2,500.000
PED DETECT PUSH BUTTON (APS)
EA 10.000 $1,086.130 $1,000.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,531.040 $3,150.000
VEH LP DETECT (SAWCUT)(14 AWG)(BLK)
LF 2,030.000 $10.000 $16.500
TREE REMOVAL (4" - 12" DIA)
EA 1.000 $236.000 $1,750.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $800.000 $3,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 47.000 $3.610 $30.000
SAWCUT AND REMOVAL OF EXIST ASPH PAV
SY 479.000 $14.000 $20.000
Totals: $795,644.190 $1,234,892.410