HARRIS VA (0912-72-413)

Items: 112

County: HARRIS
Length: N/A
Highway: VA
District: HOUSTON
Control Number: 0912-72-413
DBE Goal: N/A
Project: STP 2014(138)TE
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $1,958,760.20
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: CONSTRUCTION OF SHARED USE PATH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,958,760.20
$1,764,011.10
Over/Under Est: -9.94% -$194,749.10
$1,856,922.69
Over/Under Est: -5.2% -$101,837.51
Amt Left: 5.27% $92,911.59
$1,895,000.00
Over/Under Est: -3.26% -$63,760.20
Amt Left: 7.43% $130,988.90
Delta: -2.05% -$38,077.31
Over/Under Est: 1.45% $28,424.31
Amt Left: 12.65% $223,173.41
Delta: -4.86% -$92,184.51
Over/Under Est: 9.74% $190,723.45
Amt Left: 21.85% $385,472.55
Delta: -8.17% -$162,299.14
$2,569,929.15
Over/Under Est: 31.2% $611,168.95
Amt Left: 45.69% $805,918.05
Delta: -19.56% -$420,445.50

Bid Items & Bid Tabulations

112 Total 0 of 112
HARRIS  |  VA  |  HOUSTON  |  0912-72-413  |  04/04/2018  |  $1,958,760.20  |  STP 2014(138)TE  |  CONSTRUCTION OF SHARED USE PATH  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
ISI CONTRACTING, INC.
TRIPLE B SERVICES LLP
RAGLE CONSTRUCTION, INC.
HARPER BROTHERS CONSTRUCTION LLC
ALTUS CONSTRUCTION LLC
REMOVING CONC (PAV)
SY 57.000 $10.000 $70.000 $56.000 $50.000 $10.000 $85.000 $29.840
REMOVING CONC (RIPRAP)
SY 419.000 $10.000 $2.500 $6.000 $15.000 $2.650 $25.000 $21.230
REMOVING CONC (MEDIANS)
SY 44.000 $15.000 $10.000 $11.000 $50.000 $10.000 $85.000 $33.440
REMOVING CONC (DRIVEWAYS)
SY 2,797.000 $15.000 $4.000 $5.000 $12.000 $1.580 $20.000 $25.040
REMOVING CONC (CURB)
LF 246.000 $5.000 $1.000 $3.000 $7.000 $2.500 $3.000 $11.540
REMOVING CONC (SIDEWALK OR RAMP)
SY 411.000 $15.000 $2.000 $3.000 $10.000 $2.000 $10.000 $22.360
REMOVING CONC (PAVERS)
SY 367.000 $10.000 $3.000 $4.000 $9.500 $3.000 $15.000 $14.890
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 14.000 $12.000 $20.000 $22.000 $15.000 $20.000 $20.000 $9.560
EXCAVATION (ROADWAY)
CY 4,068.000 $15.000 $22.000 $20.000 $24.000 $40.000 $15.000 $14.130
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 562.000 $15.000 $15.000 $31.000 $4.000 $30.000 $15.000 $17.380
EROSION CONTROL COMPOST
CY 75.000 $35.000 $70.000 $38.000 $40.000 $40.000 $100.000 $60.590
BLOCK SODDING
SY 13,715.000 $5.000 $3.000 $3.300 $4.000 $4.000 $3.450 $4.650
FERTILIZER
AC 2.830 $1,000.000 $700.000 $775.000 $850.000 $625.000 $945.840 $1,274.580
VEGETATIVE WATERING
MG 479.500 $30.000 $22.000 $20.000 $20.000 $12.000 $45.000 $30.640
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 12,144.000 $18.000 $19.000 $18.000 $18.500 $20.000 $20.000 $17.680
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 100.000 $300.000 $375.000 $180.000 $75.000 $95.000 $250.000 $212.260
STRUCT EXCAV
CY 90.000 $17.000 $60.000 $110.000 $100.000 $10.000 $40.000 $28.120
CEM STABIL BKFL
CY 258.000 $60.000 $50.000 $50.000 $55.000 $60.000 $75.000 $111.640
CEMENT STAB BACKFILL (INLET OR MH)
CY 12.000 $60.000 $50.000 $50.000 $55.000 $120.000 $40.000 $152.520
RET WALL (SPREAD FOOTING) (SPL)
SF 607.000 $100.000 $40.000 $74.000 $42.000 $80.000 $80.000 $62.460
RETAINING WALL (SPECIAL)
SF 243.000 $100.000 $100.000 $42.000 $100.000 $110.000 $150.000 $88.300
RIPRAP (CONC)(5 IN)
CY 62.000 $500.000 $550.000 $475.000 $45.000 $625.000 $750.000 $534.630
RAIL (TY PR1)
LF 215.000 $150.000 $90.000 $104.000 $85.000 $90.000 $130.000 $124.970
RC PIPE (CL III)(18 IN)
LF 48.000 $100.000 $80.000 $84.000 $120.000 $75.000 $95.000 $122.080
RC PIPE (CL III)(24 IN)
LF 12.000 $120.000 $130.000 $125.000 $210.000 $125.000 $150.000 $193.230
RC PIPE (CL III)(36 IN)
LF 56.000 $150.000 $210.000 $150.000 $190.000 $130.000 $240.000 $191.060
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,000.000 $2,600.000 $7,700.000 $4,500.000 $4,000.000 $3,700.000 $5,603.060
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,750.000 $770.000 $1,350.000 $1,000.000 $1,750.000 $2,643.910
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $5,000.000 $4,900.000 $3,100.000 $3,800.000 $5,000.000 $5,300.000 $3,981.170
ADJUSTING MANHOLES
EA 1.000 $1,000.000 $900.000 $380.000 $850.000 $1,500.000 $750.000 $2,550.470
ADJUSTING INLETS
EA 1.000 $1,000.000 $1,100.000 $380.000 $1,300.000 $1,500.000 $750.000 $5,043.280
ADJUSTING MANHOLES (SANITARY)
EA 2.000 $1,200.000 $800.000 $380.000 $990.000 $2,000.000 $750.000 $2,726.010
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 8.000 $1,000.000 $250.000 $380.000 $615.000 $650.000 $750.000 $800.870
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 13.000 $600.000 $250.000 $380.000 $3,000.000 $550.000 $750.000 $641.890
REMOV STR (INLET)
EA 2.000 $600.000 $500.000 $1,000.000 $650.000 $550.000 $250.000 $1,965.760
REMOV STR (SET)
EA 1.000 $1,000.000 $500.000 $1,000.000 $738.700 $550.000 $250.000 $1,095.430
REMOV STR (PIPE)
LF 49.000 $30.000 $15.000 $21.000 $14.000 $20.000 $10.000 $48.760
REMOV STR (SMALL FENCE)
LF 24.000 $50.000 $10.000 $21.000 $7.500 $20.000 $50.000 $12.440
REMOVE STR (RAIL)
LF 149.000 $20.000 $10.000 $26.000 $14.000 $20.000 $15.000 $36.860
MOBILIZATION
LS 1.000 $204,000.000 $170,000.000 $160,000.000 $180,000.000 $190,000.000 $100,000.000 $251,135.270
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $5,000.000 $2,400.000 $8,900.000 $17,000.000 $10,000.000 $6,957.710
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 546.000 $35.000 $30.000 $22.000 $24.000 $10.000 $29.140 $35.090
CONSTRUCTION EXITS (REMOVE)
SY 546.000 $15.000 $5.000 $8.000 $7.000 $3.000 $8.200 $11.840
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,830.000 $5.000 $3.000 $5.000 $2.000 $2.190 $2.190 $2.950
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,830.000 $2.000 $0.500 $2.500 $1.100 $0.550 $0.550 $0.810
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 680.000 $8.000 $5.000 $3.300 $4.000 $3.000 $3.530 $5.130
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 290.000 $10.000 $8.000 $4.750 $5.500 $5.000 $5.160 $7.470
BIODEG EROSN CONT LOGS (REMOVE)
LF 970.000 $2.000 $1.000 $1.000 $3.000 $0.500 $0.550 $1.040
REMOVE AND RELAY PAVERS
SY 70.000 $100.000 $65.000 $43.000 $25.000 $100.000 $150.000 $127.960
CONC CURB (TY II)
LF 3,329.000 $10.000 $1.000 $3.400 $4.000 $10.000 $3.500 $20.880
CONC CURB (DOWEL)
LF 525.000 $10.000 $10.000 $12.000 $7.500 $12.000 $7.000 $27.920
DRIVEWAYS (CONC)
SY 1,676.000 $65.000 $65.000 $80.000 $95.000 $80.000 $110.000 $138.300
CONC SIDEWALKS (6")
SY 10,156.000 $50.000 $58.000 $66.000 $53.000 $51.450 $71.500 $70.450
CURB RAMPS (TY 7)(MOD)
EA 2.000 $2,500.000 $2,500.000 $2,000.000 $2,100.000 $1,600.000 $2,200.000 $3,363.570
CURB RAMP (TY 1) (MOD)
EA 9.000 $2,500.000 $1,900.000 $2,000.000 $2,050.000 $1,500.000 $2,200.000 $2,619.870
CURB RAMPS (TY3)(MOD)
EA 1.000 $2,500.000 $2,500.000 $2,000.000 $2,300.000 $1,600.000 $2,200.000 $4,739.920
CONDT (PVC) (SCH 40) (2")
LF 50.000 $25.000 $20.000 $22.000 $22.500 $14.750 $20.000 $28.340
CONDT (PVC) (SCH 80) (2")
LF 73.000 $25.000 $22.000 $24.000 $25.000 $15.000 $22.000 $28.540
CONDT (PVC) (SCH 80) (2") (BORE)
LF 121.000 $30.000 $25.000 $27.000 $28.000 $35.000 $25.000 $50.900
CONDT (PVC) (SCH 80) (3")
LF 70.000 $35.000 $25.000 $27.000 $28.000 $18.000 $25.000 $43.880
ELEC CONDR (NO.6) BARE
LF 448.000 $2.000 $1.500 $1.600 $1.700 $1.650 $1.500 $3.520
ELEC CONDR (NO.4) BARE
LF 40.000 $3.000 $3.000 $3.250 $3.400 $1.750 $3.000 $5.670
ELEC CONDR (NO.4) INSULATED
LF 80.000 $3.000 $4.000 $4.350 $4.500 $2.500 $4.000 $7.330
TRAY CABLE (3 CONDR) (12 AWG)
LF 579.000 $3.000 $2.000 $2.200 $2.300 $1.700 $2.000 $5.180
GROUND BOX TY D (162922)
EA 3.000 $1,150.000 $1,000.000 $1,100.000 $1,100.000 $1,200.000 $1,000.000 $4,692.950
REMOVE ELECTRICAL SERVICES
EA 1.000 $2,000.000 $600.000 $650.000 $680.000 $1,500.000 $600.000 $2,170.860
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $5,000.000 $5,501.000 $6,000.000 $6,300.000 $6,500.000 $5,501.000 $16,816.570
ALUMINUM SIGNS (TY A)
SF 10.500 $35.000 $13.000 $18.000 $20.000 $13.000 $25.000 $31.370
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $350.000 $400.000 $450.000 $350.000 $550.000 $716.300
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $800.000 $420.000 $470.000 $515.000 $420.000 $725.000 $1,188.960
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $800.000 $560.000 $625.000 $515.000 $560.000 $725.000 $987.730
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $900.000 $635.000 $710.000 $570.000 $635.000 $1,125.000 $1,478.920
RELOCATE SM RD SN SUP&AM TY S80
EA 40.000 $800.000 $150.000 $170.000 $680.000 $150.000 $400.000 $864.970
REMOVE SM RD SN SUP&AM
EA 4.000 $120.000 $50.000 $85.000 $50.000 $75.000 $100.000 $122.280
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 767.000 $6.000 $1.500 $1.650 $3.750 $1.500 $3.350 $4.530
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $10.000 $3.000 $3.300 $7.000 $3.000 $6.250 $9.020
REFL PAV MRK TY II (W) 4" (SLD)
LF 100.000 $1.500 $0.450 $0.500 $0.400 $0.450 $0.300 $0.790
PAVEMENT SEALER 4"
LF 2,196.000 $1.000 $0.100 $0.110 $0.200 $0.100 $0.150 $0.270
PAVEMENT SEALER 12"
LF 767.000 $1.500 $0.300 $0.330 $0.600 $0.300 $0.500 $0.590
PAVEMENT SEALER 24"
LF 200.000 $2.000 $0.600 $0.700 $1.000 $0.600 $0.900 $0.830
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,066.000 $2.000 $0.550 $0.600 $0.700 $0.550 $0.600 $3.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 130.000 $2.500 $0.550 $0.600 $0.700 $0.550 $0.600 $3.460
ELIM EXT PAV MRK & MRKS (4")
LF 135.000 $1.000 $0.150 $0.170 $0.500 $0.150 $0.400 $0.900
ELIM EXT PAV MRK & MRKS (12")
LF 767.000 $2.000 $0.450 $0.500 $1.200 $0.450 $1.000 $1.850
ELIM EXT PAV MRK & MRKS (24")
LF 200.000 $3.000 $0.900 $1.000 $2.250 $0.900 $1.950 $3.660
PAV SURF PREP FOR MRK (4")
LF 2,196.000 $0.600 $0.100 $0.120 $0.100 $0.100 $0.040 $0.040
PAV SURF PREP FOR MRK (12")
LF 767.000 $1.000 $0.200 $0.250 $0.200 $0.200 $0.150 $0.250
PAV SURF PREP FOR MRK (24")
LF 200.000 $2.000 $0.400 $0.450 $0.300 $0.400 $0.250 $0.920
INSTALL HWY TRF SIG (UPGRADE)
EA 3.000 $4,000.000 $5,175.000 $5,800.000 $5,500.000 $3,500.000 $5,175.000 $19,515.970
PED SIG SEC (LED)(COUNTDOWN)
EA 20.000 $700.000 $650.000 $700.000 $750.000 $550.000 $650.000 $1,044.030
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,924.000 $1.700 $1.500 $1.650 $1.750 $1.650 $1.500 $2.560
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,924.000 $2.200 $1.750 $1.900 $2.000 $1.750 $1.750 $2.760
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 50.000 $3.500 $2.000 $2.200 $2.300 $1.850 $2.000 $7.780
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,180.000 $4.000 $3.000 $3.250 $3.400 $1.950 $3.000 $4.020
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $5,000.000 $3,300.000 $3,600.000 $3,800.000 $2,500.000 $3,300.000 $6,526.460
PED POLE ASSEMBLY
EA 2.000 $2,000.000 $1,900.000 $2,100.000 $2,200.000 $1,600.000 $1,900.000 $3,402.710
RELOCATE PED POLE ASSEMBLY
EA 2.000 $3,500.000 $900.000 $1,000.000 $1,000.000 $900.000 $900.000 $3,945.520
PED DETECT PUSH BUTTON (APS)
EA 18.000 $1,000.000 $650.000 $725.000 $750.000 $680.000 $650.000 $1,545.410
PED DETECTOR CONTROLLER UNIT
EA 3.000 $4,500.000 $3,600.000 $4,000.000 $4,200.000 $3,500.000 $3,600.000 $6,076.360
TREE TRIMMING
MI 0.240 $15,000.000 $12,000.000 $7,000.000 $28,000.000 $20,000.000 $20,000.000 $42,091.720
TREE REMOVAL (4" - 12" DIA)
EA 4.000 $1,000.000 $575.000 $400.000 $2,000.000 $200.000 $750.000 $606.090
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $1,200.000 $900.000 $650.000 $2,500.000 $425.000 $3,000.000 $1,907.440
TRANSPLANT PLANT MATERIAL
EA 27.000 $1,000.000 $280.000 $725.000 $50.000 $1,200.000 $1,500.000 $1,283.100
TREE PROTECTION
EA 21.000 $500.000 $750.000 $130.000 $460.000 $175.000 $250.000 $309.240
TREE PROTECTION
AC 0.280 $50,000.000 $14,300.000 $17,000.000 $23,000.000 $18,000.000 $50,000.000 $31,435.760
RETROFIT DET WARN SURF(SURF APP OR CIP)
SF 79.000 $40.000 $25.000 $21.000 $100.000 $60.000 $40.000 $46.490
REMOVE AND RELOCATE STEEL FENCE
LF 28.000 $200.000 $60.000 $70.000 $75.000 $40.000 $120.000 $183.760
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 11.000 $200.000 $100.000 $90.000 $105.000 $250.000 $300.000 $134.830
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 885.000 $4.000 $1.500 $1.700 $1.750 $2.750 $1.500 $6.180
CONDUIT (PREPARE)
LF 784.000 $3.000 $2.300 $2.500 $2.750 $4.500 $2.300 $6.770
GROUND BOX (PREPARE)
EA 7.000 $500.000 $300.000 $330.000 $350.000 $650.000 $300.000 $783.380
TMA (STATIONARY)
DAY 75.000 $250.000 $200.000 $250.000 $250.000 $160.000 $65.000 $570.290
Totals: $1,958,760.200 $1,764,011.100 $1,856,922.690 $1,895,000.000 $1,987,184.510 $2,149,483.657 $2,569,929.162