HARRIS CS (0912-72-405)

Items: 62

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-405
DBE Goal: N/A
Project: BR 2021(347)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $800,384.35
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$800,384.35
Over/Under Est: 2.98% $23,879.15
$882,796.90
Over/Under Est: 10.3% $82,412.55
Amt Left: 7.1% $58,533.40
Over/Under Est: 16.92% $135,435.49
Amt Left: 13.53% $111,556.34
Delta: -6.01% -$53,022.94

Bid Items & Bid Tabulations

62 Total 0 of 62
HARRIS  |  CS  |  HOUSTON  |  0912-72-405  |  06/28/2023  |  $800,384.35  |  BR 2021(347)  |  BRIDGE REPL  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NBG CONSTRUCTORS, INC.
MBN ENTERPRISES LLC
SEFBO PIPELINE BRIDGE, INCORPORATED
PREPARING ROW
STA 1.950 $21,000.000 $12,000.000 $9,000.000 $21,101.050
REMOVING CONC (DRIVEWAYS)
SY 105.000 $16.000 $15.000 $12.000 $45.940
REMOVING CONC (CURB AND GUTTER)
LF 250.000 $10.000 $5.000 $16.000 $11.570
REMOVING STAB BASE AND ASPH PAV (6")
SY 374.000 $8.000 $13.000 $5.000 $23.210
EXCAVATION (ROADWAY)
CY 213.000 $30.000 $22.000 $12.000 $51.560
EXCAVATION (CHANNEL)
CY 140.000 $29.000 $40.000 $15.000 $50.910
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 117.000 $32.000 $15.000 $15.000 $65.670
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 164.000 $95.000 $100.000 $45.000 $188.110
FURNISHING AND PLACING TOPSOIL
CY 22.000 $30.000 $80.000 $50.000 $162.000
BLOCK SODDING
SY 299.000 $5.000 $6.000 $8.000 $17.740
FERTILIZER
AC 0.070 $1,500.000 $800.000 $3,000.000 $6,171.430
VEGETATIVE WATERING
MG 9.000 $35.000 $35.000 $35.000 $360.000
LIME TRT (EXST MATL) (6")
SY 304.000 $5.000 $8.000 $12.000 $56.210
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 5.000 $285.000 $300.000 $400.000 $2,664.000
CEM STABIL BKFL
CY 20.000 $213.000 $80.000 $100.000 $466.800
CEMENT STAB BACKFILL (INLET OR MH)
CY 35.000 $50.000 $80.000 $90.000 $290.230
TRENCH EXCAVATION PROTECTION
LF 50.000 $6.000 $2.000 $25.000 $116.760
DRILL SHAFT (30 IN)
LF 360.000 $210.000 $500.000 $350.000 $250.130
CL C CONC (ABUT)
CY 31.600 $1,400.000 $1,500.000 $1,150.000 $1,146.200
REINF CONC SLAB (BOX BEAM)
SF 1,971.000 $25.000 $20.000 $25.000 $25.150
BRIDGE SIDEWALK
SF 342.000 $58.000 $15.000 $16.000 $10.680
APPROACH SLAB
CY 57.000 $755.000 $750.000 $700.000 $830.130
SHEAR KEY
CY 11.000 $500.000 $250.000 $450.000 $691.420
PRESTR CONC BOX BEAM (4B20)
LF 338.890 $235.000 $250.000 $310.000 $245.590
PRESTR CONC BOX BEAM (5B20)
LF 112.960 $235.000 $250.000 $350.000 $267.260
RIPRAP (STONE PROTECTION)(12 IN)
CY 94.000 $200.000 $200.000 $185.000 $176.130
STR STEEL (MISC NON - BRIDGE)
LB 178.000 $18.000 $35.000 $25.000 $33.360
RAIL (TY T223)
LF 77.000 $150.000 $170.000 $200.000 $354.930
RAIL (TY C223)
LF 67.000 $185.000 $200.000 $200.000 $671.390
TYPE A JOINT
LF 58.000 $75.000 $5.000 $85.000 $291.590
RC PIPE (CL III)(18 IN)
LF 50.000 $100.000 $110.000 $160.000 $191.160
MANH (COMPL)(TY A)
EA 2.000 $8,750.000 $12,000.000 $8,000.000 $15,914.880
INLET (COMPL)(CURB)(TY C)
EA 2.000 $6,600.000 $7,500.000 $8,000.000 $9,266.880
INLET (COMPL)(TY AZ2G)
EA 1.000 $10,300.000 $13,000.000 $10,000.000 $12,335.760
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $33,000.000 $40,000.000 $85,000.000 $30,704.400
MOBILIZATION
LS 1.000 $68,281.000 $80,000.000 $80,000.000 $80,946.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,000.000 $1,300.000 $5,000.000 $1,008.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 105.000 $70.000 $40.000 $55.000 $36.340
ROCK FILTER DAMS (REMOVE)
LF 105.000 $20.000 $10.000 $15.000 $4.860
CONSTRUCTION PERIMETER FENCE
LF 171.000 $7.000 $25.000 $15.000 $10.350
TEMP SEDMT CONT FENCE (INSTALL)
LF 340.000 $4.000 $3.000 $4.000 $7.920
TEMP SEDMT CONT FENCE (REMOVE)
LF 340.000 $1.000 $1.000 $1.000 $1.760
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 51.000 $5.000 $7.000 $6.000 $19.220
BIODEG EROSN CONT LOGS (REMOVE)
LF 51.000 $1.000 $1.000 $1.000 $5.880
CONC CURB & GUTTER (TY II)
LF 141.000 $42.000 $35.000 $26.000 $39.130
DRIVEWAYS (CONC)
SY 87.000 $105.000 $100.000 $85.000 $131.720
CONC SIDEWALKS (4")
SY 61.000 $100.000 $75.000 $75.000 $125.100
CHAIN LINK FENCE (REMOVE)
LF 40.000 $10.000 $10.000 $10.000 $15.000
REMOVE SM RD SN SUP&AM
EA 2.000 $70.000 $150.000 $150.000 $120.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 5.000 $30.000 $25.000 $40.000 $66.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 6.000 $60.000 $30.000 $150.000 $70.000
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 2.000 $225.000 $235.000 $500.000 $303.600
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 1.000 $225.000 $235.000 $600.000 $513.600
REFL PAV MRK TY II (W) 6" (SLD)
LF 391.000 $0.600 $2.000 $1.500 $8.920
REFL PAV MRK TY II (Y) 6" (SLD)
LF 391.000 $0.600 $2.000 $1.500 $8.920
REFL PAV MRKR TY II-A-A
EA 10.000 $10.000 $20.000 $15.000 $208.320
PAV SURF PREP FOR MRK (6")
LF 782.000 $0.200 $1.000 $0.500 $1.640
D-GR HMA TY-B SAC-B PG70-22
TON 58.000 $220.000 $225.000 $220.000 $262.970
TACK COAT
GAL 54.000 $13.000 $5.500 $10.000 $97.250
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
TON 58.000 $300.000 $225.000 $220.000 $247.170
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
TON 29.000 $365.000 $300.000 $220.000 $303.030
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $65.000 $60.000 $200.000 $43.670
Totals: $800,384.350 $824,263.500 $882,796.900 $935,819.862