HARRIS VA (0912-72-390)

Items: 35

County: HARRIS
Length: N/A
Highway: VA
District: HOUSTON
Control Number: 0912-72-390
DBE Goal: N/A
Project: F 2022(720)
Guaranty: N/A
Time: 166 WORKING DAYS
Engineer's Estimate: $1,576,593.00
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,576,593.00
$1,389,740.00
Over/Under Est: -11.85% -$186,853.00
$1,599,081.00
Over/Under Est: 1.43% $22,488.00
Amt Left: 15.06% $209,341.00
Over/Under Est: 34.68% $546,769.93
Amt Left: 52.79% $733,622.93
Delta: -32.79% -$524,281.93
Subcontractor Percentage Amount
DTI A-GROUP, LLC 3.63% $56,086.48
HUITT ZOLLARS,INC. 0.26% $4,017.21
PFEIFFER & SON LTD. 0.10% $1,545.08
Total: 3.99% $61,648.77

Bid Items & Bid Tabulations

35 Total 0 of 35
HARRIS  |  VA  |  HOUSTON  |  0912-72-390  |  05/05/2023  |  $1,576,593.00  |  F 2022(720)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  166 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROMAN EMPERORS ROAD, LLC
ENCINO LANDSCAPE, INC.
RAGLE CONSTRUCTION, INC.
REMOVING CONC (DRIVEWAYS)
SY 1,177.000 $20.000 $15.000 $40.000 $17.370
REMOVING CONC (CURB AND GUTTER)
LF 1,862.000 $23.000 $7.000 $40.000 $4.990
REMOVING CONC (SIDEWALK OR RAMP)
SY 523.000 $20.000 $20.000 $40.000 $22.230
EROSION CONTROL COMPOST
CY 190.000 $61.000 $20.000 $10.000 $60.000
BLOCK SODDING
SY 3,158.000 $8.000 $9.000 $5.000 $17.550
FERTILIZER
AC 0.700 $700.000 $720.000 $300.000 $1,000.000
VEGETATIVE WATERING
MG 90.000 $30.000 $10.000 $1.000 $105.270
LANDSCAPE EDGE
LF 1,701.000 $10.000 $14.000 $20.000 $15.000
D-GR HMA(SQ) TY-C PG64-22
TON 1.700 $650.000 $1,000.000 $500.000 $1,250.000
ADJUSTING MANHOLES
EA 3.000 $1,500.000 $700.000 $800.000 $413.450
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 9.000 $1,100.000 $850.000 $800.000 $127.500
ADJUSTING MANHOLES (WATER METER)
EA 13.000 $492.000 $950.000 $800.000 $51.700
PIPE (PVC) (SDR - 35) (4 IN)
LF 11.000 $65.000 $50.000 $200.000 $127.000
MOBILIZATION
LS 1.000 $142,000.000 $100,000.000 $150,000.000 $210,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $10,000.000 $10,000.000 $68,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,686.000 $5.000 $5.000 $10.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,686.000 $3.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 240.000 $7.000 $3.000 $5.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $3.000 $1.000 $1.000 $2.250
CONC CURB & GUTTER (TY II)
LF 2,595.000 $43.000 $35.000 $35.000 $16.200
CONC CURB (TY C1)
LF 1,024.000 $75.000 $100.000 $50.000 $66.670
DRIVEWAYS (CONC)
SY 1,321.000 $114.000 $120.000 $90.000 $98.740
CONC SIDEWALKS (4")
SY 4,886.000 $105.000 $80.000 $90.000 $121.000
CURB RAMPS (TY 2)
EA 1.000 $3,500.000 $2,500.000 $2,000.000 $2,225.000
CURB RAMPS (TY 5)
EA 1.000 $3,000.000 $3,000.000 $2,000.000 $2,033.000
CURB RAMPS (TY 6)
EA 14.000 $3,000.000 $3,000.000 $2,000.000 $1,715.000
CURB RAMPS (TY 7)
EA 2.000 $3,500.000 $1,800.000 $2,000.000 $1,400.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 384.000 $192.000 $225.000 $250.000 $87.000
GROUND BOX TY C (162911)
EA 53.000 $1,076.000 $1,200.000 $800.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 17.000 $532.000 $600.000 $500.000 $800.000
STUMP REMOVAL
EA 1.000 $1,000.000 $300.000 $500.000 $750.000
TREE TRIMMING
EA 50.000 $500.000 $150.000 $250.000 $500.000
TREE PROTECTION
EA 82.000 $500.000 $500.000 $1,500.000 $1,500.000
REMOVE BOLLARD
EA 2.000 $500.000 $500.000 $500.000 $370.000
TREE GRATE (CAST IRON)(42" X 42")
EA 9.000 $2,100.000 $4,000.000 $5,000.000 $4,400.000
Totals: $1,576,593.000 $1,389,740.000 $1,599,081.000 $2,123,362.930