PREPARING ROW
|
STA
|
19.000
|
$3,782.000
|
$8,000.000
|
$11,500.000
|
$1,800.000
|
$4,500.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
15.000
|
$2,084.000
|
$3,000.000
|
$530.000
|
$1,000.000
|
$750.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
8,429.000
|
$5.000
|
$7.500
|
$6.300
|
$6.000
|
$3.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
397.000
|
$19.000
|
$8.750
|
$6.200
|
$10.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
202.000
|
$18.000
|
$9.500
|
$7.100
|
$10.000
|
$25.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,711.000
|
$12.000
|
$7.250
|
$3.500
|
$1.000
|
$2.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
905.000
|
$13.000
|
$10.200
|
$4.800
|
$4.000
|
$8.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
9.000
|
$19.000
|
$30.000
|
$53.000
|
$25.000
|
$100.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
1,287.000
|
$15.000
|
$7.500
|
$10.700
|
$10.000
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,228.000
|
$25.000
|
$6.250
|
$32.300
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
261.000
|
$10.500
|
$22.000
|
$3.200
|
$20.000
|
$20.000
|
|
|
EROSION CONTROL COMPOST
|
CY
|
13.400
|
$35.000
|
$50.000
|
$55.100
|
$150.000
|
$65.000
|
|
|
GENERAL USE COMPOST
|
CY
|
6.600
|
$35.000
|
$50.000
|
$55.100
|
$250.000
|
$60.000
|
|
|
BLOCK SODDING
|
SY
|
4,641.000
|
$4.000
|
$4.500
|
$5.000
|
$7.000
|
$6.000
|
|
|
FERTILIZER
|
AC
|
0.960
|
$592.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
$3,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
115.000
|
$19.000
|
$45.000
|
$40.000
|
$50.000
|
$45.000
|
|
|
IRRIGATION SYSTEM (TY I)
|
LS
|
1.000
|
$66,000.000
|
$120,000.000
|
$126,000.000
|
$150,000.000
|
$56,650.000
|
|
|
PLANT MATERIAL (45 GAL) (TREE)
|
EA
|
11.000
|
$455.000
|
$450.000
|
$850.000
|
$700.000
|
$575.000
|
|
|
PLANT MATERIAL (100 GAL) (TREE)
|
EA
|
19.000
|
$1,100.000
|
$1,000.000
|
$1,330.000
|
$1,400.000
|
$1,150.000
|
|
|
PLANT MAINTENANCE
|
MO
|
3.000
|
$3,763.000
|
$1,500.000
|
$1,400.000
|
$6,000.000
|
$1,950.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
187.000
|
$189.000
|
$200.000
|
$304.000
|
$290.000
|
$270.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
8,566.000
|
$4.000
|
$6.750
|
$7.900
|
$8.000
|
$12.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
1,969.000
|
$5.000
|
$6.500
|
$9.700
|
$8.000
|
$16.000
|
|
|
CEMENT
|
TON
|
27.000
|
$220.000
|
$180.000
|
$217.000
|
$10.000
|
$270.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
1,634.000
|
$5.000
|
$8.500
|
$10.400
|
$20.000
|
$6.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
160.000
|
$5.000
|
$8.500
|
$13.300
|
$20.000
|
$30.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
384.000
|
$10.000
|
$10.000
|
$17.000
|
$10.000
|
$19.750
|
|
|
CONC PAV (JOINT REINF) (6")
|
SY
|
1,489.000
|
$45.000
|
$80.000
|
$69.900
|
$80.000
|
$75.000
|
|
|
CONC PAV (CONT REINF)(FAST TRK)(11")
|
SY
|
341.000
|
$110.000
|
$120.000
|
$100.000
|
$160.000
|
$155.000
|
|
|
CONC PAV (JOINT REINF) (11")
|
SY
|
6,352.000
|
$81.000
|
$87.000
|
$80.500
|
$110.000
|
$140.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,080.000
|
$43.000
|
$50.000
|
$59.800
|
$52.000
|
$46.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
294.000
|
$43.000
|
$56.000
|
$59.800
|
$52.000
|
$46.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,448.000
|
$4.000
|
$2.200
|
$0.100
|
$1.000
|
$1.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$650.000
|
$1,500.000
|
$1,120.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
16.000
|
$1,250.000
|
$850.000
|
$1,845.000
|
$2,000.000
|
$1,400.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
400.000
|
$400.000
|
$525.000
|
$422.300
|
$585.000
|
$610.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
12.000
|
$450.000
|
$650.000
|
$512.900
|
$800.000
|
$650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,538.000
|
$110.000
|
$82.000
|
$114.900
|
$140.000
|
$200.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
53.000
|
$175.000
|
$250.000
|
$267.300
|
$260.000
|
$400.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
71.000
|
$190.000
|
$235.000
|
$319.700
|
$360.000
|
$400.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$9,000.000
|
$7,000.000
|
$15,800.000
|
$20,000.000
|
$25,000.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$11,000.000
|
$12,500.000
|
$11,300.000
|
$18,000.000
|
$15,000.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
6.000
|
$4,000.000
|
$7,500.000
|
$5,800.000
|
$7,000.000
|
$7,000.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
17.000
|
$4,500.000
|
$6,000.000
|
$5,700.000
|
$6,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
1.000
|
$5,000.000
|
$8,500.000
|
$7,000.000
|
$7,000.000
|
$9,000.000
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
2.000
|
$5,097.000
|
$8,500.000
|
$8,500.000
|
$9,000.000
|
$12,000.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
7.000
|
$1,350.000
|
$2,200.000
|
$2,400.000
|
$2,000.000
|
$1,700.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$349.000
|
$1,500.000
|
$472.000
|
$600.000
|
$600.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$653.000
|
$1,500.000
|
$572.000
|
$500.000
|
$400.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
$961.000
|
$550.000
|
$860.000
|
$700.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
726.000
|
$24.000
|
$25.000
|
$34.600
|
$20.000
|
$10.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
20.000
|
$25.000
|
$50.000
|
$67.800
|
$40.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$300,000.000
|
$390,000.000
|
$386,000.000
|
$315,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$2,200.000
|
$4,500.000
|
$10,000.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
450.000
|
$19.000
|
$35.000
|
$37.100
|
$35.000
|
$40.780
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
450.000
|
$7.000
|
$15.000
|
$5.300
|
$10.000
|
$9.370
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
213.000
|
$3.000
|
$3.500
|
$3.200
|
$4.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
213.000
|
$1.000
|
$1.250
|
$1.100
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
251.000
|
$5.000
|
$10.000
|
$10.600
|
$12.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
251.000
|
$2.000
|
$2.000
|
$2.100
|
$3.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,055.000
|
$70.000
|
$45.000
|
$96.200
|
$50.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$33.000
|
$63.000
|
$17.400
|
$50.000
|
$35.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$41.000
|
$63.000
|
$20.200
|
$75.000
|
$35.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
340.000
|
$7.000
|
$10.000
|
$18.800
|
$6.000
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$13.000
|
$10.000
|
$18.800
|
$6.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$7.000
|
$15.000
|
$16.400
|
$15.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$15.000
|
$16.400
|
$15.000
|
$10.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
48.000
|
$160.000
|
$50.000
|
$79.500
|
$100.000
|
$40.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
45.000
|
$200.000
|
$70.000
|
$223.400
|
$180.000
|
$165.000
|
|
|
COLORED TEXTURED CONC (6"-17")
|
SY
|
576.000
|
$115.000
|
$90.000
|
$137.500
|
$240.000
|
$225.000
|
|
|
CONC CURB (TY I)
|
LF
|
400.000
|
$12.000
|
$8.500
|
$6.500
|
$30.000
|
$10.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
21.000
|
$29.000
|
$30.000
|
$87.100
|
$100.000
|
$60.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
3,541.000
|
$10.000
|
$8.500
|
$4.600
|
$6.000
|
$7.000
|
|
|
CONC CURB (DOWEL)(9")
|
LF
|
28.000
|
$10.000
|
$22.000
|
$16.300
|
$50.000
|
$35.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
236.000
|
$84.000
|
$85.000
|
$102.900
|
$120.000
|
$130.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$1,542.000
|
$2,200.000
|
$1,913.100
|
$3,000.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$1,793.000
|
$2,200.000
|
$2,859.600
|
$2,000.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
4.000
|
$2,143.000
|
$2,600.000
|
$3,048.000
|
$4,000.000
|
$2,000.000
|
|
|
CONC SIDEWALKS (9")
|
SY
|
13.000
|
$70.000
|
$110.000
|
$103.900
|
$250.000
|
$200.000
|
|
|
CONC MEDIAN
|
SY
|
4.000
|
$75.000
|
$110.000
|
$98.600
|
$300.000
|
$300.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
817.000
|
$23.000
|
$25.000
|
$22.800
|
$15.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
98.000
|
$18.000
|
$20.000
|
$36.000
|
$31.000
|
$28.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
408.000
|
$38.000
|
$60.000
|
$36.000
|
$30.000
|
$19.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
40.000
|
$650.000
|
$400.000
|
$715.500
|
$550.000
|
$604.090
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$727.000
|
$500.000
|
$901.000
|
$750.000
|
$714.190
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$845.000
|
$850.000
|
$1,272.000
|
$900.000
|
$777.940
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
|
EA
|
1.000
|
$900.000
|
$1,500.000
|
$1,272.000
|
$1,000.000
|
$864.190
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
592.000
|
$4.000
|
$4.500
|
$5.300
|
$5.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
75.000
|
$4.000
|
$4.250
|
$5.300
|
$5.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
4,734.000
|
$3.000
|
$0.700
|
$1.300
|
$4.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
8,527.000
|
$3.000
|
$0.700
|
$1.300
|
$4.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
290.000
|
$12.000
|
$5.250
|
$8.500
|
$10.000
|
$10.500
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
16.000
|
$157.000
|
$111.000
|
$265.000
|
$250.000
|
$195.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
4.000
|
$190.000
|
$182.000
|
$318.000
|
$400.000
|
$235.000
|
|
|
WK ZN PAV MRK REMOV (W)(TPL ARROW)
|
EA
|
4.000
|
$300.000
|
$244.000
|
$344.500
|
$500.000
|
$255.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
89.000
|
$1.000
|
$1.000
|
$1.100
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
490.000
|
$7.000
|
$5.500
|
$8.000
|
$9.000
|
$8.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
48.000
|
$1.000
|
$0.800
|
$1.300
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
238.000
|
$1.000
|
$0.800
|
$0.500
|
$3.000
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
660.000
|
$0.500
|
$0.800
|
$0.600
|
$3.000
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
192.000
|
$0.470
|
$0.800
|
$0.600
|
$3.000
|
$1.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$136.000
|
$190.000
|
$291.500
|
$300.000
|
$264.180
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
8.000
|
$344.000
|
$320.000
|
$371.000
|
$500.000
|
$413.780
|
|
PREFAB PAV MRK TY C (W) (TPL ARROW)
|
EA
|
3.000
|
$470.000
|
$420.000
|
$503.500
|
$650.000
|
$502.930
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$156.000
|
$220.000
|
$318.000
|
$350.000
|
$312.220
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
53.000
|
$28.000
|
$35.000
|
$31.800
|
$40.000
|
$30.100
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
5.000
|
$10.000
|
$35.000
|
$79.500
|
$400.000
|
$380.950
|
|
PREFAB PAV MRK TY C (GRN)(SLD)(BLOCK)
|
SF
|
1,003.000
|
$20.000
|
$20.000
|
$26.500
|
$12.000
|
$16.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
41.000
|
$5.000
|
$5.000
|
$4.200
|
$5.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
412.000
|
$1.000
|
$0.250
|
$0.500
|
$1.000
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,182.000
|
$1.000
|
$0.100
|
$0.100
|
$0.100
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
273.000
|
$1.000
|
$0.100
|
$0.200
|
$0.100
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,843.000
|
$2.000
|
$0.100
|
$0.900
|
$1.000
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$16.000
|
$4.280
|
$21.200
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$49.000
|
$5.200
|
$31.800
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
3.000
|
$21.000
|
$10.000
|
$42.400
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
3.000
|
$18.000
|
$6.200
|
$21.200
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
53.000
|
$7.000
|
$0.250
|
$10.600
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
5.000
|
$10.000
|
$6.000
|
$15.900
|
$10.000
|
$5.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,567.000
|
$5,000.000
|
$3,710.000
|
$4,000.000
|
$3,500.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$57,017.000
|
$75,000.000
|
$71,300.000
|
$70,000.000
|
$62,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
$500.000
|
$2,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,700.000
|
$500.000
|
$1,000.000
|
$500.000
|
$2,000.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
18.000
|
$700.000
|
$250.000
|
$2,000.000
|
$500.000
|
$2,000.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
9.000
|
$2,000.000
|
$250.000
|
$2,000.000
|
$500.000
|
$2,500.000
|
|
|
LANDSCAPE AMENITY
|
EA
|
9.000
|
$500.000
|
$2,500.000
|
$1,060.000
|
$600.000
|
$1,600.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
9.000
|
$500.000
|
$2,500.000
|
$1,060.000
|
$600.000
|
$1,000.000
|
|
|
TREE PROTECTION
|
EA
|
39.000
|
$850.000
|
$250.000
|
$685.000
|
$500.000
|
$700.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE I)
|
SY
|
120.000
|
$3.000
|
$3.000
|
$6.000
|
$13.000
|
$5.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE II)
|
SY
|
120.000
|
$1.000
|
$3.000
|
$6.000
|
$13.000
|
$5.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE III)
|
SY
|
30.000
|
$1.000
|
$3.000
|
$6.000
|
$27.000
|
$30.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE IV)
|
SY
|
90.000
|
$1.000
|
$3.000
|
$6.000
|
$18.000
|
$20.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
73.000
|
$100.000
|
$210.000
|
$260.000
|
$225.000
|
$205.000
|
|
|
TACK COAT
|
GAL
|
87.000
|
$5.000
|
$35.000
|
$25.000
|
$5.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,080.000
|
$70.000
|
$42.000
|
$54.000
|
$50.000
|
$100.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
1,083.000
|
$2.000
|
$0.750
|
$0.800
|
$3.000
|
$2.300
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
112.000
|
$2.000
|
$0.750
|
$0.800
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
60.000
|
$2.000
|
$0.800
|
$1.300
|
$3.000
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
54.000
|
$1.000
|
$1.000
|
$1.500
|
$6.000
|
$3.100
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
82.000
|
$1.000
|
$2.500
|
$1.600
|
$6.000
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
350.000
|
$7.000
|
$5.750
|
$7.700
|
$20.000
|
$12.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
1,837.000
|
$2.000
|
$1.000
|
$0.600
|
$3.000
|
$2.300
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$240.000
|
$250.000
|
$185.500
|
$250.000
|
$80.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$75.000
|
$55.000
|
$83.700
|
$70.000
|
$50.000
|
|
|
VIVDS PROSR SYS
|
EA
|
1.000
|
$1,380.000
|
$1,500.000
|
$19,000.000
|
$4,000.000
|
$3,600.000
|
|
|
CASING (STEEL) (SANITARY SEWER) (12 IN)
|
LF
|
110.000
|
$200.000
|
$180.000
|
$240.000
|
$525.000
|
$500.000
|
|
|
CASING (STEEL) (SANITARY SEWER) (16 IN)
|
LF
|
14.000
|
$270.000
|
$235.000
|
$440.000
|
$600.000
|
$800.000
|
|
|
CASING (STEEL) (SAN SEWER) (36IN)
|
LF
|
16.000
|
$725.000
|
$450.000
|
$646.000
|
$1,200.000
|
$900.000
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 8IN
|
LF
|
304.000
|
$150.000
|
$70.000
|
$154.000
|
$170.000
|
$235.000
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 12IN
|
LF
|
53.000
|
$175.000
|
$85.000
|
$326.000
|
$400.000
|
$350.000
|
|
|
FIRE HYDRANT BRANCH (LEAD) (6IN)
|
LF
|
17.000
|
$90.000
|
$75.000
|
$39.000
|
$120.000
|
$180.000
|
|
|
TAPPING SLEEVE AND VALVE (24IN X 8IN)
|
EA
|
2.000
|
$15,000.000
|
$7,000.000
|
$6,200.000
|
$6,200.000
|
$9,000.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
2.000
|
$5,650.000
|
$5,000.000
|
$7,100.000
|
$9,500.000
|
$7,000.000
|
|
|
REMOVING AND SALVAGING FIRE HYDRANT
|
EA
|
10.000
|
$710.000
|
$500.000
|
$1,530.000
|
$500.000
|
$300.000
|
|
|
CUT AND PLUG WATER MAIN (6IN)
|
EA
|
2.000
|
$1,441.000
|
$500.000
|
$1,660.000
|
$900.000
|
$600.000
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
5.000
|
$1,967.000
|
$1,000.000
|
$1,730.000
|
$1,000.000
|
$900.000
|
|
|
CUT AND PLUG WATER MAIN (12IN)
|
EA
|
2.000
|
$2,043.000
|
$1,500.000
|
$1,910.000
|
$1,200.000
|
$1,250.000
|
|
|
WET CONNECTION (6IN)
|
EA
|
2.000
|
$2,000.000
|
$1,000.000
|
$1,830.000
|
$2,500.000
|
$2,500.000
|
|
|
WET CONNECTION (8IN)
|
EA
|
2.000
|
$2,250.000
|
$2,500.000
|
$1,935.000
|
$3,000.000
|
$3,000.000
|
|
|
WET CONNECTION (12IN)
|
EA
|
2.000
|
$2,500.000
|
$4,500.000
|
$2,300.000
|
$3,500.000
|
$6,100.000
|
|
|
WTR MAIN PIPE (PVC) (RESTRAINED JT) 6IN
|
LF
|
6.000
|
$150.000
|
$85.000
|
$327.000
|
$450.000
|
$400.000
|
|
|
JK TN BR AG WTR MN(PVC)(8IN)(RESTR JNT)
|
LF
|
240.000
|
$200.000
|
$65.000
|
$127.000
|
$150.000
|
$210.000
|
|
Totals: |
$3,420,097.060
|
$3,268,852.880
|
$3,993,857.900
|
$4,095,678.500
|
$4,573,850.220
|