|
|
PREPARING ROW
|
STA
|
372.470
|
$4,000.000
|
$800.000
|
$230.000
|
$1,200.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
4,589.890
|
$6.000
|
$10.000
|
$7.400
|
$25.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,800.000
|
$8.000
|
$10.000
|
$6.400
|
$5.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
19.000
|
$8.000
|
$10.000
|
$76.000
|
$40.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,701.000
|
$8.000
|
$10.000
|
$6.300
|
$6.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
25,140.000
|
$2.000
|
$10.000
|
$11.000
|
$0.100
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
4,914.000
|
$2.000
|
$10.000
|
$9.300
|
$5.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
366.000
|
$2.000
|
$20.000
|
$15.000
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
838.000
|
$2.000
|
$6.000
|
$10.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,361.800
|
$10.000
|
$30.000
|
$32.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,885.300
|
$15.000
|
$10.000
|
$11.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
12,543.000
|
$1.150
|
$1.000
|
$2.200
|
$1.290
|
|
|
BLOCK SODDING
|
SY
|
16,917.000
|
$3.000
|
$3.500
|
$2.500
|
$3.650
|
|
|
STRAW OR HAY MULCH
|
SY
|
12,543.000
|
$0.220
|
$0.150
|
$0.140
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
12,543.000
|
$0.140
|
$0.130
|
$0.120
|
$0.230
|
|
|
FERTILIZER
|
AC
|
5.709
|
$650.000
|
$750.000
|
$580.000
|
$1,008.180
|
|
|
VEGETATIVE WATERING
|
MG
|
684.890
|
$14.000
|
$20.000
|
$25.000
|
$9.150
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
31,625.200
|
$6.000
|
$25.000
|
$26.000
|
$23.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
4,645.700
|
$64.000
|
$110.000
|
$85.000
|
$84.000
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
1,581.800
|
$76.000
|
$150.000
|
$105.000
|
$103.000
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
2,322.000
|
$145.000
|
$135.000
|
$97.000
|
$96.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,621.000
|
$1.850
|
$20.000
|
$5.000
|
$2.000
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
10,226.000
|
$60.000
|
$80.000
|
$68.000
|
$100.000
|
|
|
CONC PVMT (JOINTED-CPCD)(HES)(10")
|
SY
|
15,667.000
|
$95.000
|
$85.000
|
$86.000
|
$110.000
|
|
|
STRUCT EXCAV
|
CY
|
30.000
|
$9.000
|
$30.000
|
$32.000
|
$20.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
761.000
|
$4.000
|
$20.000
|
$5.600
|
$40.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,041.000
|
$40.000
|
$40.000
|
$50.000
|
$60.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
62.000
|
$40.000
|
$40.000
|
$50.000
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
686.000
|
$4.000
|
$3.000
|
$11.000
|
$10.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
18.000
|
$200.000
|
$300.000
|
$370.000
|
$365.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
176.000
|
$220.000
|
$400.000
|
$390.000
|
$385.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,150.000
|
$2,000.000
|
$1,600.000
|
$1,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
5.500
|
$1,150.000
|
$500.000
|
$850.000
|
$160.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,596.000
|
$60.000
|
$64.000
|
$200.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
176.000
|
$70.000
|
$114.000
|
$220.000
|
$120.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$4,300.000
|
$5,000.000
|
$5,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
9.000
|
$6,100.000
|
$4,000.000
|
$3,900.000
|
$7,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
1.000
|
$4,600.000
|
$5,000.000
|
$4,600.000
|
$6,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
5.000
|
$4,600.000
|
$6,000.000
|
$5,300.000
|
$6,000.000
|
|
|
INLET (COMPL)(PAZD)(RC)(5FTX5FT)
|
EA
|
2.000
|
$3,500.000
|
$5,000.000
|
$7,800.000
|
$7,000.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$3,500.000
|
$4,000.000
|
$6,200.000
|
$5,000.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
2.000
|
$3,500.000
|
$3,500.000
|
$5,500.000
|
$7,000.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
6.000
|
$3,300.000
|
$4,000.000
|
$5,700.000
|
$6,000.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
17.000
|
$13,000.000
|
$3,500.000
|
$6,500.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,200.000
|
$2,500.000
|
$4,100.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,200.000
|
$3,000.000
|
$4,600.000
|
$3,500.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
19.000
|
$790.000
|
$400.000
|
$1,500.000
|
$1,000.000
|
|
|
ADJUSTING INLETS
|
EA
|
4.000
|
$1,400.000
|
$600.000
|
$1,500.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
1.000
|
$1,000.000
|
$500.000
|
$1,500.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
1.000
|
$600.000
|
$300.000
|
$740.000
|
$1,000.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
5.000
|
$1,300.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
9.000
|
$850.000
|
$250.000
|
$390.000
|
$500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
2.000
|
$625.000
|
$250.000
|
$390.000
|
$500.000
|
|
|
REMOV STR (SET)
|
EA
|
25.000
|
$700.000
|
$250.000
|
$390.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
900.000
|
$22.000
|
$15.000
|
$26.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$800,000.000
|
$680,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$7,500.000
|
$6,000.000
|
$8,300.000
|
$10,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$28.000
|
$30.000
|
$30.000
|
$29.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$8.500
|
$5.000
|
$80.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,838.000
|
$4.500
|
$5.000
|
$3.500
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
75.000
|
$4.500
|
$10.000
|
$5.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,913.000
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,580.000
|
$25.000
|
$30.000
|
$72.000
|
$10.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$45.000
|
$30.000
|
$70.000
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
3,320.000
|
$4.500
|
$6.000
|
$5.000
|
$1.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
440.000
|
$6.500
|
$6.000
|
$7.000
|
$1.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,580.000
|
$6.500
|
$6.000
|
$6.000
|
$3.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$8.250
|
$6.000
|
$8.000
|
$2.000
|
|
|
CONC CURB (TY II)
|
LF
|
17,322.000
|
$9.750
|
$4.000
|
$4.600
|
$4.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
809.000
|
$4.250
|
$7.000
|
$4.600
|
$5.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,659.000
|
$22.000
|
$15.000
|
$30.000
|
$20.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
10,809.000
|
$8.000
|
$6.000
|
$6.600
|
$5.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,587.000
|
$66.000
|
$63.000
|
$84.000
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
616.000
|
$31.000
|
$63.000
|
$77.000
|
$45.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
125.000
|
$50.000
|
$60.000
|
$41.000
|
$200.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$1,750.000
|
$1,500.000
|
$1,600.000
|
$2,100.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,200.000
|
$1,500.000
|
$1,600.000
|
$2,400.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$1,650.000
|
$1,500.000
|
$2,000.000
|
$2,400.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
14.000
|
$1,400.000
|
$1,500.000
|
$1,400.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$3,000.000
|
$2,000.000
|
$3,200.000
|
$2,100.000
|
|
|
CONC MEDIAN
|
SY
|
1,824.000
|
$46.000
|
$50.000
|
$100.000
|
$40.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
113.000
|
$60.000
|
$60.000
|
$130.000
|
$35.000
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
207.000
|
$100.000
|
$60.000
|
$130.000
|
$36.000
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
2.000
|
$350.000
|
$320.000
|
$210.000
|
$340.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
90.000
|
$18.000
|
$18.500
|
$7.800
|
$7.750
|
|
|
CONDT (PVC) (SCH 40) (1 1/4")
|
LF
|
15.000
|
$18.000
|
$15.500
|
$7.800
|
$7.800
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,351.000
|
$9.000
|
$14.300
|
$9.900
|
$9.900
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,530.000
|
$16.000
|
$26.000
|
$15.000
|
$14.500
|
|
|
CONDT (PVC) (SCH 80) (1 1/4")
|
LF
|
1,050.000
|
$10.000
|
$9.800
|
$8.000
|
$8.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
445.000
|
$8.000
|
$17.750
|
$10.000
|
$10.300
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
295.000
|
$17.000
|
$18.900
|
$15.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
80.000
|
$12.000
|
$25.000
|
$14.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
430.000
|
$22.000
|
$19.000
|
$18.000
|
$18.000
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
420.000
|
$17.000
|
$18.000
|
$23.000
|
$23.000
|
|
|
CONDT (RM) (2")
|
LF
|
120.000
|
$24.000
|
$140.000
|
$27.000
|
$27.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
7,319.000
|
$1.150
|
$1.700
|
$2.100
|
$2.100
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
23.000
|
$865.000
|
$1,100.000
|
$900.000
|
$895.000
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
130.000
|
$2.250
|
$15.000
|
$9.500
|
$9.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
5.000
|
$26.000
|
$24.000
|
$25.000
|
$100.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
155.000
|
$26.000
|
$20.000
|
$25.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
94.000
|
$440.000
|
$392.000
|
$480.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$550.000
|
$491.000
|
$540.000
|
$100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
15.000
|
$400.000
|
$376.000
|
$460.000
|
$100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
19.000
|
$400.000
|
$431.000
|
$360.000
|
$100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$85.000
|
$40.000
|
$150.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
3,985.000
|
$0.660
|
$0.650
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
17,761.000
|
$0.580
|
$0.600
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
550.000
|
$1.210
|
$1.300
|
$1.300
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
204.000
|
$3.700
|
$6.000
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
4.000
|
$142.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
4.000
|
$164.000
|
$175.000
|
$180.000
|
$175.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
780.000
|
$0.680
|
$0.650
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
30,904.000
|
$0.580
|
$0.600
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,846.000
|
$1.360
|
$1.250
|
$1.300
|
$1.250
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
548.000
|
$1.410
|
$1.500
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
2,710.000
|
$2.000
|
$1.750
|
$0.750
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
27,866.000
|
$1.680
|
$0.750
|
$0.750
|
$0.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
6,827.000
|
$2.790
|
$2.500
|
$2.500
|
$2.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,767.000
|
$5.130
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
159.000
|
$100.000
|
$110.000
|
$110.000
|
$110.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
16.000
|
$140.000
|
$220.000
|
$220.000
|
$220.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
20.000
|
$250.000
|
$350.000
|
$350.000
|
$350.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
310.000
|
$115.760
|
$125.000
|
$130.000
|
$125.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
1.000
|
$125.000
|
$100.000
|
$100.000
|
$100.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
1.000
|
$200.000
|
$150.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
|
EA
|
3.000
|
$500.000
|
$300.000
|
$300.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
88.000
|
$800.000
|
$200.000
|
$200.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,207.000
|
$5.120
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
150.000
|
$1.000
|
$0.350
|
$0.350
|
$0.350
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
28,853.000
|
$1.100
|
$0.750
|
$0.750
|
$0.750
|
|
REFL PAV MRK TY II (Y) (ISLAND)
|
SF
|
3,617.000
|
$0.500
|
$0.750
|
$0.750
|
$0.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
31,144.000
|
$0.040
|
$0.060
|
$0.060
|
$0.060
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,050.000
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
|
|
PAVEMENT SEALER 8"
|
LF
|
30,074.000
|
$0.120
|
$0.120
|
$0.120
|
$0.120
|
|
|
PAVEMENT SEALER 12"
|
LF
|
18,840.000
|
$0.230
|
$0.200
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 24"
|
LF
|
4,974.000
|
$0.520
|
$0.300
|
$0.300
|
$0.300
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
167.000
|
$23.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
310.000
|
$23.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
8.000
|
$50.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAVEMENT SEALER (U-L ARROW)
|
EA
|
20.000
|
$25.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
1.000
|
$5.650
|
$5.000
|
$5.000
|
$5.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
1.000
|
$11.200
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAVEMENT SEALER (BIKE WORD)
|
EA
|
3.000
|
$18.000
|
$10.000
|
$10.000
|
$10.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,304.000
|
$0.790
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,473.000
|
$0.300
|
$0.350
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
912.000
|
$0.330
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,946.000
|
$0.380
|
$0.350
|
$0.350
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$4.440
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
194.000
|
$3.830
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,036.000
|
$3.910
|
$4.000
|
$4.000
|
$4.000
|
|
TRAFFIC BUTTON TY W
|
EA
|
5,646.000
|
$2.680
|
$3.500
|
$3.500
|
$3.500
|
|
TRAFFIC BUTTON TY Y
|
EA
|
45.000
|
$2.680
|
$3.500
|
$3.500
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
23,204.000
|
$0.260
|
$0.350
|
$0.350
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
11,263.000
|
$0.550
|
$0.350
|
$0.350
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
5,240.000
|
$0.800
|
$0.750
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
3,729.000
|
$1.560
|
$1.500
|
$1.500
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
81.000
|
$34.850
|
$35.000
|
$35.000
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
19.000
|
$46.340
|
$52.000
|
$52.000
|
$52.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
84.000
|
$40.980
|
$52.000
|
$52.000
|
$52.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
16.000
|
$56.760
|
$52.000
|
$52.000
|
$52.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
23,935.000
|
$0.010
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
404.000
|
$0.030
|
$0.060
|
$0.060
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
27,910.000
|
$0.050
|
$0.080
|
$0.080
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
17,668.000
|
$0.100
|
$0.120
|
$0.120
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
4,677.000
|
$0.130
|
$0.240
|
$0.240
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
163.000
|
$5.210
|
$3.000
|
$3.000
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
263.000
|
$7.370
|
$5.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
9,937.000
|
$15.000
|
$0.250
|
$0.250
|
$0.250
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
14.000
|
$27,000.000
|
$5,000.000
|
$12,800.000
|
$12,750.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
16.000
|
$190.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
12.000
|
$200.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
16.000
|
$200.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
11.000
|
$200.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
16.000
|
$193.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
18.000
|
$197.000
|
$230.000
|
$200.000
|
$195.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
13.000
|
$95.000
|
$77.000
|
$80.000
|
$80.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
8.000
|
$105.000
|
$85.000
|
$95.000
|
$95.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
7,570.000
|
$1.060
|
$2.100
|
$1.500
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
6,992.000
|
$1.360
|
$2.500
|
$1.900
|
$1.850
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
13,910.000
|
$1.860
|
$3.000
|
$2.200
|
$2.200
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
1,744.000
|
$1.050
|
$2.000
|
$1.300
|
$1.250
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
9,270.000
|
$1.100
|
$1.800
|
$1.300
|
$1.250
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')ILSN
|
EA
|
1.000
|
$12,000.000
|
$8,000.000
|
$11,500.000
|
$11,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')ILSN
|
EA
|
2.000
|
$14,000.000
|
$22,700.000
|
$24,700.000
|
$24,675.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$16,000.000
|
$25,000.000
|
$24,000.000
|
$24,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')ILSN
|
EA
|
1.000
|
$18,000.000
|
$25,100.000
|
$26,000.000
|
$25,950.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')ILSN
|
EA
|
4.000
|
$20,000.000
|
$25,500.000
|
$26,200.000
|
$26,200.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
9.000
|
$1,500.000
|
$1,700.000
|
$1,700.000
|
$1,725.000
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
3.000
|
$1,700.000
|
$900.000
|
$790.000
|
$790.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
11,710.000
|
$9.500
|
$12.000
|
$9.000
|
$8.950
|
|
|
INSTALL OF CABLES
|
LF
|
96.000
|
$2.630
|
$23.000
|
$1.000
|
$1.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
30.000
|
$125.000
|
$125.000
|
$100.000
|
$100.000
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
45.000
|
$250.000
|
$130.000
|
$230.000
|
$225.000
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
18.000
|
$36.000
|
$40.000
|
$45.000
|
$45.000
|
|
|
INSTALL OF SIGNAL RELATED SIGNS
|
EA
|
19.000
|
$330.000
|
$70.000
|
$200.000
|
$195.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
10.000
|
$1,670.000
|
$1,400.000
|
$850.000
|
$850.000
|
|
|
INSTALL OF SIGNAL POLE ASSM
|
EA
|
10.000
|
$1,775.000
|
$1,900.000
|
$500.000
|
$500.000
|
|
|
VIVDS CABLE (INSTALL)
|
LF
|
5,000.000
|
$1.590
|
$3.500
|
$1.500
|
$1.500
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
11.000
|
$200.000
|
$300.000
|
$600.000
|
$400.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
13.000
|
$500.000
|
$500.000
|
$950.000
|
$500.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
7.000
|
$800.000
|
$750.000
|
$2,000.000
|
$850.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
300.000
|
$15.000
|
$8.030
|
$23.000
|
$35.000
|
|
|
PULL BOXES (TY D)
|
EA
|
4.000
|
$500.000
|
$800.000
|
$750.000
|
$750.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$200.000
|
$200.000
|
$250.000
|
$79.480
|
|
Totals: |
$8,859,186.240
|
$8,619,571.440
|
$8,727,618.436
|
$8,733,207.593
|