Show Job Controls
Bid Cobra

HARRIS CS (0912-72-353)

Items: 108

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-353
DBE Goal: N/A
Project: BR 2019(424)
Guaranty: N/A
Time: 175 WORKING DAYS
Engineer's Estimate: $2,053,931.37
Date: 10/08/2021 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE & APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,053,931.37
$3,272,346.99
Over/Under Est: 59.32% $1,218,415.62
Over/Under Est: 59.52% $1,222,592.93
Amt Left: 0.13% $4,177.31
$3,380,386.98
Over/Under Est: 64.58% $1,326,455.61
Amt Left: 3.3% $108,039.99
Delta: -3.17% -$103,862.68
Over/Under Est: 73.78% $1,515,427.22
Amt Left: 9.08% $297,011.60
Delta: -5.59% -$188,971.61

Bid Items & Bid Tabulations

108 Total 0 of 108
HARRIS  |  CS  |  HOUSTON  |  0912-72-353  |  10/08/2021  |  $2,053,931.37  |  BR 2019(424)  |  REPLACE BRIDGE & APPROACHES  |  175 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
JOHN REED AND COMPANY, LLC
NBG CONSTRUCTORS, INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 11.700 $2,800.000 $27,950.000 $15,000.000 $10,000.000 $30,000.000
REMOVING CONC (PAV)
SY 1,887.000 $4.000 $4.640 $3.000 $9.000 $14.000
REMOVING CONC (RIPRAP)
SY 147.000 $7.000 $6.000 $3.000 $15.000 $14.000
REMOVING CONC (SIDEWALKS)
SY 678.000 $7.500 $4.000 $3.000 $10.000 $13.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 706.000 $3.000 $8.630 $3.000 $15.000 $5.000
EXCAVATION (ROADWAY)
CY 1,339.000 $7.500 $16.860 $20.000 $25.000 $59.000
EXCAVATION (CHANNEL)
CY 354.000 $10.500 $26.420 $20.000 $30.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 296.000 $8.500 $53.140 $30.000 $16.000 $30.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 323.000 $50.000 $116.280 $40.000 $75.000 $140.000
FURNISHING AND PLACING TOPSOIL
CY 3.000 $40.000 $385.800 $300.000 $130.000 $100.000
BLOCK SODDING
SY 2,151.000 $3.000 $3.150 $4.000 $4.500 $8.600
STRAW OR HAY MULCH
SY 2,151.000 $0.200 $0.200 $0.100 $0.260 $1.220
BROADCAST SEED (TEMP) (WARM)
SY 1,077.000 $0.100 $0.200 $0.100 $0.260 $0.920
DRILL SEED (TEMP)(WARM OR COOL)
SY 1,077.000 $0.100 $0.200 $0.500 $0.260 $0.920
FERTILIZER
AC 0.470 $650.000 $600.000 $800.000 $800.000 $3,829.000
VEGETATIVE WATERING
MG 58.000 $17.000 $40.000 $20.000 $30.000 $35.000
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
TON 30.930 $180.000 $183.000 $200.000 $250.000 $183.000
LIME TRT (SUBGRADE)(6")
SY 2,294.000 $2.300 $15.680 $6.000 $12.000 $12.000
D-GR HMA(SQ) TY-B PG64-22
TON 243.000 $50.000 $155.000 $180.000 $125.000 $120.000
TACK COAT
GAL 27.000 $5.000 $7.500 $15.000 $3.000 $2.500
CONC PAV (JOINT REINF) (8")
SY 1,435.000 $50.000 $85.350 $80.000 $110.000 $90.000
CEM STABIL BKFL
CY 126.000 $50.000 $54.760 $60.000 $60.000 $110.000
DRILL SHAFT (24 IN)
LF 1,944.000 $130.000 $144.960 $275.000 $230.000 $170.000
CL C CONC (ABUT)
CY 88.200 $830.000 $1,006.040 $1,600.000 $2,000.000 $1,000.000
CL C CONC (CAP)
CY 48.400 $800.000 $1,445.310 $1,600.000 $2,000.000 $1,650.000
CL C CONC (COLUMN)
CY 12.300 $870.000 $2,135.240 $1,600.000 $2,800.000 $3,100.000
CL A CONC (CHANNEL LINING)
CY 194.000 $500.000 $320.500 $700.000 $750.000 $650.000
REINF CONC SLAB (SLAB BEAM)
SF 9,141.000 $14.000 $14.940 $18.000 $18.000 $40.000
BRIDGE SIDEWALK
SF 1,531.000 $9.500 $10.350 $20.000 $20.000 $12.000
APPROACH SLAB
CY 228.000 $450.000 $448.230 $800.000 $920.000 $500.000
PRESTR CONC SLAB BEAM (4SB12)
LF 658.940 $130.000 $268.000 $220.000 $270.000 $180.000
PRESTR CONC SLAB BEAM (5SB12)
LF 624.860 $120.000 $268.000 $220.000 $270.000 $181.000
PRESTR CONC SLAB BEAM (5SB15)
LF 592.500 $180.000 $268.000 $220.000 $270.000 $210.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 50.000 $150.000 $104.620 $140.000 $230.000 $130.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $450.000 $829.280 $500.000 $1,200.000 $555.000
STR STEEL (MISC NON - BRIDGE)
LB 702.000 $8.000 $21.000 $12.000 $20.000 $16.000
RAIL (TY T223)
LF 426.000 $125.000 $71.500 $110.000 $135.000 $111.000
RAIL (TY C223)
LF 274.000 $125.000 $97.670 $130.000 $200.000 $156.000
ARMOR JOINT (SEALED)
LF 228.000 $85.000 $62.330 $50.000 $100.000 $82.000
RC PIPE (CL III)(24 IN)
LF 184.000 $70.000 $99.610 $160.000 $200.000 $99.000
MANH (COMPL)(PRM)(48IN)
EA 2.000 $4,000.000 $3,671.910 $4,000.000 $4,500.000 $5,200.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $4,000.000 $4,252.340 $4,000.000 $3,500.000 $4,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $3,800.000 $5,420.130 $6,000.000 $4,500.000 $4,500.000
HEADWALL (CH - FW - 30) (DIA= 24 IN)
EA 2.000 $10,000.000 $7,923.050 $3,000.000 $6,000.000 $3,700.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,450.000 $1,198.930 $700.000 $1,600.000 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,600.000 $1,345.750 $900.000 $1,900.000 $1,900.000
REMOV STR (INLET)
EA 3.000 $500.000 $825.130 $500.000 $600.000 $500.000
REMOV STR (HEADWALL)
EA 2.000 $1,100.000 $959.760 $800.000 $650.000 $1,400.000
REMOV STR (PIPE)
LF 50.000 $15.000 $18.980 $20.000 $30.000 $16.500
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $18,000.000 $114,000.000 $60,000.000 $40,000.000 $50,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $30,000.000 $114,000.000 $90,000.000 $40,000.000 $100,000.000
MOBILIZATION
LS 1.000 $169,655.810 $326,741.030 $325,000.000 $330,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,333.330 $1,907.680 $3,750.000 $3,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 594.000 $30.000 $90.000 $40.000 $55.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 594.000 $10.000 $28.000 $10.000 $15.000 $28.000
CONSTRUCTION PERIMETER FENCE
LF 380.000 $2.500 $6.250 $9.000 $8.000 $5.090
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,793.000 $2.500 $2.750 $4.000 $6.000 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,793.000 $0.700 $0.750 $1.000 $1.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 464.000 $4.000 $5.220 $1.000 $6.000 $5.220
BIODEG EROSN CONT LOGS (REMOVE)
LF 464.000 $1.000 $1.000 $0.500 $1.000 $1.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 160.000 $40.000 $39.130 $74.910 $22.000 $20.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $40.000 $37.130 $52.000 $22.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 60.000 $9.000 $20.140 $55.770 $10.000 $11.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 80.000 $10.000 $15.130 $20.910 $10.000 $8.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 160.000 $10.000 $30.840 $20.910 $20.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $30.840 $41.830 $20.000 $10.000
CONC CURB (TY II)
LF 636.000 $15.000 $14.860 $12.000 $7.000 $13.000
CONC CURB (MONO) (TY II)
LF 114.000 $5.000 $42.190 $11.840 $7.000 $10.000
CONC CURB & GUTTER (TY I)
LF 304.000 $18.000 $32.140 $8.000 $30.000 $25.500
DRIVEWAYS (CONC)
SY 296.000 $69.000 $132.900 $114.020 $110.000 $60.000
CONC SIDEWALKS (5")
SY 716.000 $57.000 $45.780 $75.420 $55.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $20.000 $30.000 $40.000 $40.000 $33.630
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,200.000 $1,425.000 $1,250.000 $2,000.000 $1,313.510
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,400.000 $3,100.000 $3,350.000 $5,000.000 $3,520.200
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 4.000 $10,000.000 $15,550.000 $12,500.000 $16,000.000 $14,711.300
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $550.000 $500.000 $585.000 $600.000 $614.720
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 2.000 $2,000.000 $3,900.000 $2,425.000 $3,200.000 $2,548.210
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $500.000 $500.000 $660.000 $700.000 $693.540
REMOVE SM RD SN SUP&AM
EA 24.000 $85.000 $85.000 $60.000 $70.000 $63.050
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 5.000 $20.000 $25.000 $20.000 $20.000 $21.020
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $20.000 $25.500 $20.000 $20.000 $21.020
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 3.000 $20.000 $30.000 $30.000 $30.000 $31.520
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 3.000 $25.000 $30.500 $30.000 $30.000 $31.520
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3.000 $20.000 $25.000 $20.000 $20.000 $21.020
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 12.000 $20.000 $25.500 $20.000 $20.000 $21.020
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 29.000 $80.000 $55.000 $60.000 $60.000 $63.050
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 6.000 $220.000 $255.000 $210.000 $220.000 $220.670
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 7.000 $210.000 $255.000 $210.000 $220.000 $220.670
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 3,431.000 $1.000 $0.820 $3.000 $0.900 $1.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 75.000 $8.000 $8.500 $20.000 $10.000 $15.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 194.000 $6.500 $8.000 $6.000 $10.000 $9.500
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 31.000 $30.000 $45.000 $35.000 $50.000 $30.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 529.000 $0.600 $0.750 $0.400 $0.800 $0.600
REFL PAV MRK TY II (W) 6" (SLD)
LF 3,063.000 $0.600 $0.750 $0.400 $0.800 $0.390
REFL PAV MRK TY II (Y) 6" (SLD)
LF 3,032.000 $0.600 $0.750 $0.400 $0.800 $0.390
PAVEMENT SEALER 6"
LF 5,250.000 $0.200 $0.020 $0.400 $0.030 $0.350
PAVEMENT SEALER 24"
LF 194.000 $2.000 $0.200 $4.000 $0.220 $3.000
PAVEMENT SEALER (YLD TRI)
EA 31.000 $14.000 $0.100 $28.000 $0.120 $30.000
REFL PAV MRKR TY II-A-A
EA 52.000 $3.500 $10.000 $8.000 $11.000 $8.000
REFL PAV MRKR TY II-C-R
EA 28.000 $3.500 $10.000 $8.000 $11.000 $8.000
ELIM EXT PAV MRK & MRKS (4")
LF 87.000 $0.500 $2.000 $1.000 $2.200 $9.000
ELIM EXT PAV MRK & MRKS (24")
LF 71.000 $3.000 $4.000 $5.000 $4.400 $18.000
PAV SURF PREP FOR MRK (6")
LF 5,250.000 $0.100 $0.170 $0.080 $0.180 $0.400
PAV SURF PREP FOR MRK (24")
LF 194.000 $1.000 $0.010 $0.600 $0.020 $3.500
TREE REMOVAL (4" - 12" DIA)
EA 1.000 $300.000 $1,000.000 $500.000 $1,000.000 $600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 690.000 $55.000 $63.770 $50.000 $42.000 $90.000
ADJUST WATER VALVE BOX
EA 1.000 $500.000 $1,303.780 $1,800.000 $500.000 $200.000
REMOVE AND RELOCATE FIRE HYDRANT
EA 1.000 $9,500.000 $6,008.010 $3,600.000 $3,500.000 $5,000.000
Totals: $2,053,931.370 $3,272,347.004 $3,276,524.300 $3,380,386.980 $3,569,358.590