HARRIS CS (0912-72-348)

Items: 71

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-348
DBE Goal: N/A
Project: BR 2018(113)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $2,902,452.80
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,902,452.80
Over/Under Est: -0.15% -$4,438.54
Over/Under Est: 14.31% $415,253.24
Amt Left: 14.48% $419,691.78
$3,457,744.96
Over/Under Est: 19.13% $555,292.16
Amt Left: 19.31% $559,730.70
Delta: -4.22% -$140,038.92
Over/Under Est: 28.25% $819,941.37
Amt Left: 28.45% $824,379.91
Delta: -7.65% -$264,649.21
Over/Under Est: 32.66% $948,028.70
Amt Left: 32.87% $952,467.24
Delta: -3.44% -$128,087.33

Bid Items & Bid Tabulations

71 Total 0 of 71
HARRIS  |  CS  |  HOUSTON  |  0912-72-348  |  03/05/2020  |  $2,902,452.80  |  BR 2018(113)  |  REPLACE BRIDGES AND APPROACHES  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ARANDA BROTHERS CONSTRUCTION CO., INC.
JOHN REED AND COMPANY, LLC
ISI CONTRACTING, INC.
HARPER BROTHERS CONSTRUCTION LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 6.070 $5,000.000 $2,000.000 $9,000.000 $30,000.000 $6,000.000 $45,000.000
REMOVING CONC (PAV)
SY 2,380.000 $15.000 $3.000 $3.000 $11.000 $5.000 $11.000
REMOVING CONC (CURB)
LF 600.000 $6.000 $3.000 $1.000 $2.000 $1.000 $7.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 2,380.000 $12.000 $3.000 $2.000 $2.800 $2.000 $8.000
EXCAVATION (ROADWAY)
CY 444.000 $15.000 $10.000 $25.000 $25.000 $25.000 $50.000
EXCAVATION (CHANNEL)
CY 775.000 $15.000 $5.000 $25.000 $42.000 $25.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,334.000 $20.000 $12.000 $25.000 $31.000 $25.000 $25.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 738.000 $35.000 $61.000 $75.000 $65.000 $90.000 $65.000
BLOCK SODDING
SY 9,104.000 $3.000 $4.100 $3.500 $3.600 $4.500 $5.080
STRAW OR HAY MULCH
SY 9,104.000 $0.200 $0.200 $0.120 $0.180 $0.720 $0.290
BROADCAST SEED (TEMP) (WARM)
SY 4,552.000 $0.150 $0.400 $0.120 $0.200 $0.360 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 4,552.000 $0.100 $0.400 $0.360 $0.200 $0.360 $0.160
FERTILIZER
AC 1.900 $600.000 $950.000 $1,200.000 $950.000 $1,575.580 $1,500.000
VEGETATIVE WATERING
MG 640.000 $10.000 $40.000 $25.000 $18.000 $20.000 $31.000
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
TON 42.840 $200.000 $194.000 $180.000 $195.000 $177.000 $177.000
LIME TRT (SUBGRADE)(8")
SY 2,380.000 $9.000 $3.500 $4.000 $3.600 $14.000 $9.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 2,173.000 $80.000 $59.000 $72.000 $73.000 $80.000 $100.000
TEMPORARY SPL SHORING
SF 1,191.000 $25.000 $35.000 $2.000 $50.000 $80.000 $20.000
PRESTR CONC PIL (18 IN SQ)
LF 2,660.000 $135.000 $105.000 $140.000 $125.000 $165.000 $196.000
CL C CONC (ABUT)
CY 116.200 $1,200.000 $1,000.000 $1,200.000 $900.000 $1,750.000 $1,200.000
CL C CONC (CAP)
CY 98.600 $1,200.000 $1,050.000 $1,500.000 $1,000.000 $1,750.000 $1,300.000
CL C CONC (RAIL FOUNDATION)
CY 28.000 $1,200.000 $650.000 $700.000 $700.000 $1,000.000 $400.000
REINF CONC SLAB
SF 18,634.000 $15.000 $14.750 $20.000 $25.000 $25.000 $22.000
APPROACH SLAB
CY 270.200 $650.000 $505.000 $600.000 $628.000 $1,000.000 $475.000
PRESTR CONC GIRDER (TX28)
LF 2,777.880 $150.000 $175.000 $180.000 $173.000 $195.000 $160.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 1,198.000 $100.000 $165.000 $110.000 $205.000 $130.000 $130.000
RIPRAP (MOW STRIP)(4 IN)
CY 51.000 $500.000 $450.000 $500.000 $560.000 $600.000 $450.000
RAIL (TY T223)
LF 1,010.000 $85.000 $85.000 $60.000 $70.000 $90.000 $127.440
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 212.000 $80.000 $105.000 $80.000 $110.000 $180.000 $115.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $30,000.000 $40,000.000 $150,000.000 $50,000.000 $75,000.000 $93,500.000
MOBILIZATION
LS 1.000 $240,000.000 $250,000.000 $320,000.000 $340,000.000 $195,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,000.000 $1,550.000 $3,000.000 $2,200.000 $5,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 320.000 $30.000 $35.000 $50.000 $40.000 $40.000 $29.800
ROCK FILTER DAMS (REMOVE)
LF 320.000 $10.000 $1.000 $10.000 $8.450 $12.000 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $20.000 $40.000 $30.000 $27.000 $40.000 $31.620
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $2.000 $10.000 $7.250 $15.000 $8.960
CONSTRUCTION PERIMETER FENCE
LF 296.000 $3.000 $5.000 $5.000 $1.000 $2.000 $4.740
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,620.000 $3.000 $3.000 $4.000 $2.800 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,620.000 $1.000 $1.000 $1.000 $1.500 $0.500 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,200.000 $7.500 $20.000 $7.000 $22.000 $20.000 $9.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,200.000 $5.000 $10.000 $4.000 $10.000 $5.000 $4.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,200.000 $6.000 $20.000 $7.000 $14.000 $18.000 $9.000
CONC CURB (TY II)
LF 942.000 $10.000 $5.000 $9.000 $5.500 $4.000 $12.000
DRIVEWAYS (CONC)
SY 602.000 $40.000 $75.000 $85.000 $60.000 $75.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $20.000 $40.000 $37.000 $41.000 $37.000 $37.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,700.000 $1,850.000 $1,718.000 $2,500.000 $1,718.000 $2,600.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.500 $2.000 $2.000 $1.300 $2.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $250.000 $200.000 $100.000 $200.000 $450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,400.000 $2,850.000 $2,754.000 $3,000.000 $2,754.000 $3,295.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,500.000 $2,850.000 $2,760.000 $1,300.000 $2,760.000 $1,600.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $1,000.000 $1,300.000 $1,265.000 $1,050.000 $1,265.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $27,510.000 $29,325.000 $27,000.000 $29,325.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $500.000 $450.000 $550.000 $486.000 $1,338.930 $550.000
REMOVE SM RD SN SUP&AM
EA 3.000 $75.000 $200.000 $80.000 $90.000 $194.750 $80.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 8.000 $20.000 $10.000 $20.000 $7.800 $48.690 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $20.000 $10.000 $20.000 $10.000 $48.690 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $30.000 $10.000 $30.000 $13.000 $73.030 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000 $25.000 $10.000 $30.000 $13.000 $73.030 $30.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,000.000 $0.600 $5.000 $3.000 $1.100 $0.100 $1.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,000.000 $0.600 $5.000 $2.000 $1.100 $0.250 $1.100
REFL PAV MRK TY II (W) 6" (BRK)
LF 500.000 $0.150 $1.250 $5.000 $0.750 $6.000 $0.750
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,000.000 $0.150 $1.250 $5.000 $0.700 $6.000 $0.750
REFL PAV MRK TY II (Y) 6" (SLD)
LF 1,000.000 $0.150 $1.250 $5.000 $0.700 $6.000 $0.750
REFL PAV MRKR TY I-A
EA 50.000 $3.000 $6.000 $5.000 $7.000 $5.000 $6.250
REFL PAV MRKR TY I-C
EA 50.000 $3.000 $6.000 $6.000 $7.000 $5.000 $6.250
REFL PAV MRKR TY II-C-R
EA 28.000 $3.000 $6.000 $6.000 $7.000 $5.000 $6.250
TRAFFIC BUTTON TY W
EA 150.000 $3.000 $6.000 $6.000 $6.150 $5.000 $4.500
TRAFFIC BUTTON TY Y
EA 150.000 $3.000 $6.000 $6.000 $6.150 $5.000 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 2,000.000 $0.350 $1.000 $0.200 $0.500 $0.250 $0.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 720.000 $42.000 $75.000 $30.000 $95.000 $30.000 $30.000
TMA (STATIONARY)
DAY 720.000 $250.000 $220.000 $70.000 $50.000 $80.000 $20.000
Totals: $2,902,452.800 $2,898,014.260 $3,317,706.040 $3,457,744.960 $3,722,394.172 $3,850,481.500